Keyword: factory
Paper Title Other Keywords Page
MOPAB215 Using ICA for Retrieving Teng Parameters GUI, coupling, optics, FEL 711
 
  • A. Lauterbach
    IAP, Frankfurt am Main, Germany
  • G. Franchetti
    GSI, Darmstadt, Germany
 
  The blind source separation (BSS) method of Independent Component Analysis (ICA) is explored as a new approach for the reconstruction of the transfer matrix of Linear Coupling Parameterization. ICA is a method to detangle independent signals out of several measurements of their mixtures. In BSS-calculations, it is usually not possible to retrieve the mixing matrix, for the source signals, as well as the matrix, are unknown. Combining the parameterization model of D.A. Edwards and L.C. Teng with the standard ICA approach, it is though possible to retrieve the mixing matrix, as the form of the original uncoupled motion is known. At the same time arises the possibility to recalculate the parameters of Edwards and Teng through a system of equations of the one turn map components. It can be shown as a proof of concept, that the parameters can be reconstructed up to high accuracy for a simulated, non-perturbed signal.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB215  
About • paper received ※ 10 May 2021       paper accepted ※ 31 May 2021       issue date ※ 23 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB275 Study on Supports of BPM Displacement Measurement System for HLS simulation, acceleration, storage-ring, feedback 870
 
  • C.H. Wang, P. Lu, B.G. Sun, T.Y. Zhou
    USTC/NSRL, Hefei, Anhui, People’s Republic of China
 
  Funding: National Synchrotron Radiation Laboratory
HLS is the second-generation light source with energy of 800 MeV and emittance of less than 40 nm-rad. In order to improve the beam orbit stability and correct the errors introduced in the orbital feedback system due to movement of the vacuum chamber and BPM, a system for measuring BPM displacement will be built. It requires a high degree of mechanical and thermal stability for its supports. The support should have a higher eigen-frequency to minimize the amplification of ground vibration. In this paper, a series of simulation, including finite element analysis (FEA), measurement and analysis have been done upon the support to make sure it can meet the requirements of the stability of the BPM displacement measurement system.
 
poster icon Poster MOPAB275 [1.025 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB275  
About • paper received ※ 18 May 2021       paper accepted ※ 21 May 2021       issue date ※ 26 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPAB364 Shielded Pair Method for Cylindrical Surface Resistance Measurement at Cryogenic Temperature cryogenics, dipole, coupling, simulation 1132
 
  • K. Brunner, S. Calatroni, F. Caspers
    CERN, Geneva, Switzerland
  • D. Barna
    Wigner Research Centre for Physics, Institute for Particle and Nuclear Physics, Budapest, Hungary
 
  The shielded pair resonator method was already used in the past at CERN to measure the surface resistivity of the LHC beam screen both at room temperature and cryogenic temperature. We have refined and adapted the measurement to be able to measure other types of beam screens and also to operate in a strong dipolar magnetic field. This is necessary for testing the properties of HTS coated beam screens or the possible effects of coatings and surface treatments for e-cloud suppression. Several calibration runs were done at cryogenic temperatures (4.2 K) measuring the surface resistivity of a copper pipe to identify the precision, stability and reproducibility achievable using this method. This work describes the challenges of the measurement and ways to mitigate them.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-MOPAB364  
About • paper received ※ 17 May 2021       paper accepted ※ 22 June 2021       issue date ※ 12 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB219 Equilibrium and Nonlinear Beam Dynamics Parameters From Sirius Turn-by-Turn BPM Data experiment, emittance, betatron, optics 1935
 
  • X.R. Resende, M.B. Alves, L. Liu, F.H. de Sá
    LNLS, Campinas, Brazil
 
  A considerable amount of beam information is conveyed by Turn-by-Turn (TbT) data of Beam Position Monitors (BPM). In this work such data sets are analyzed for Sirius, the Brazilian 4th Generation 3GeV synchrotron light source. In particular, equilibrium and non-linear beam dynamics parameters determining decoherence patterns in TbT position data are estimated and compared with corresponding values of the nominal storage ring model.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB219  
About • paper received ※ 20 May 2021       paper accepted ※ 23 June 2021       issue date ※ 15 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB244 THE WAKEFIELD STUDY OF THE RF-SHIELDED BELLOWS AT THE ILSF STORAGE RING impedance, wakefield, vacuum, simulation 2015
 
  • N. Khosravi, E. Ahmadi, M. Akhyani
    ILSF, Tehran, Iran
  • M. Akhyani
    EPFL, Lausanne, Switzerland
  • A. Khosravi
    LAPRI, Tehran, Iran
 
  The corrugated geometry of the bellows made it critical to be shielded with an RF-Shield. Different types of RF shields can be applied to the ILSF vacuum chamber to cover this component’s destructive impedance peaks. Then, the Impedance study and optimization of the RF shields can improve the impedance budget. In this article, two common types of RF shields are simulated in CST software.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB244  
About • paper received ※ 16 May 2021       paper accepted ※ 02 June 2021       issue date ※ 14 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB304 Preliminary Investigation of the Noises and Updates on Physics Studies of FOFB in HEPS power-supply, storage-ring, lattice, controls 2197
 
  • X.Y. Huang, Y. Jiao, Y. Wei
    IHEP, Beijing, People’s Republic of China
 
  High Energy Photon Source (HEPS) is a Fourth-generation storage ring light source in China and is under construction. Noises, such as the ambient mechanical vibration and the power supply ripples of magnets, may induce large orbit motions of electron bunches and hence dramatically degrade the emitted photon beam quality. The effect of noises becomes significant and needs to be considered very carefully, especially when the emittances of the electron beam approach the diffraction limit of x-ray. For the HEPS, the noises are modelled and the total beam orbit motion is evaluated considering the spectral characteristics of all the transformation processes from the errors to the orbit. In this paper, we present the preliminary calculation of the effects of noises in HEPS, and the control of the orbit motion with the FOFB system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB304  
About • paper received ※ 17 May 2021       paper accepted ※ 02 July 2021       issue date ※ 16 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAB350 Design of 71 MHz Power Amplifier in a Single-ended Architecture for IRANCYC-10 Cyclotron cyclotron, simulation, impedance, SRF 2325
 
  • F. Babagoli Moziraji, H. Afarideh
    AUT, Tehran, Iran
  • M. Dehghan
    Shahid Beheshti University, Tehran, Iran
  • F. Ghasemi
    NSTRI, Tehran, Iran
 
  In this paper, the design and simulation of a high power amplifier to provide the required power of a cyclotron accelerator (IRANCYC-10) is presented step-by-step. By combining four modules of this amplifier, a power of 2.5 kW can be achieved to start the main power amplifier. The single ended designs amplifier can generate 1 kW the operating frequency of 71MHz continuous wave (CW). The purpose of choosing this type of design is simplicity to build without the need for a balun, low weight to build high power, as well as cost-effectiveness. The gain and PAE of the SSPA are 21.21 and 71%, respectively. There are also ways to reduce the size of the amplifier.  
poster icon Poster TUPAB350 [1.008 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-TUPAB350  
About • paper received ※ 19 May 2021       paper accepted ※ 25 August 2021       issue date ※ 11 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB133 First Numerical Wakefield Studies of New In-Vacuum Cryogenic and APPLE II Undulators for BESSY II impedance, simulation, vacuum, undulator 2925
 
  • M. Huck, J. Bahrdt, A. Meseck
    HZB, Berlin, Germany
  • A. Meseck
    KPH, Mainz, Germany
 
  While the new in-vacuum cryogenic undulator is in its last commissioning stages, a worldwide new in-vacuum APPLE II undulator is being designed and constructed for BESSY II storage ring. Besides the challenging mechanical design of these small-gap and short-period undulators, challenges arise due to interaction with the electron beam. Therefore, detailed studies of this interaction is required to minimize the adverse effects on beam dynamics and the device itself. For this purpose, the wakefield effects have been computed numerically for critical parts of these devices i.e. the RF-shields, flexible tapers and taper sections. A brief overview of simulation results and discussions are presented in this paper.  
poster icon Poster WEPAB133 [0.795 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB133  
About • paper received ※ 19 May 2021       paper accepted ※ 23 July 2021       issue date ※ 23 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB224 Update of the Transverse Proton Synchrotron Impedance Model impedance, vacuum, injection, space-charge 3149
 
  • S. Joly, N. Mounet, B. Salvant
    CERN, Geneva, Switzerland
  • S. Joly
    La Sapienza University of Rome, Rome, Italy
  • M. Migliorati
    INFN-Roma1, Rome, Italy
  • M. Migliorati
    Sapienza University of Rome, Rome, Italy
 
  The CERN Proton Synchrotron (PS) was recently upgraded to allow reaching the ambitious performance goal of the High-Luminosity LHC Project. This upgrade is part of the LHC Injectors Upgrade project. The final part of the upgrade was performed during Long Shutdown 2 (LS2) to allow injection at higher energy from the PS Booster and a twofold increase in beam intensity and brightness. These changes must be considered in the PS impedance model. The effect on the impedance of the removal of obsolete injection equipment, changes of several accelerator components and new injection energy will be reviewed, as well as the wall impedance of the elliptic beam pipe, thanks to a newly developed code that allows taking into account both the ellipticity and the non-ultra-relativistic nature of the beam.  
poster icon Poster WEPAB224 [0.654 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB224  
About • paper received ※ 17 May 2021       paper accepted ※ 27 July 2021       issue date ※ 17 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPAB416 Industrialization Study of the Accelerating Structures for a 380 GeV Compact Linear Collider operation, survey, linear-collider, collider 3674
 
  • A. Magazinik
    Tampere University, Tampere, Finland
  • N. Catalán Lasheras
    CERN, Meyrin, Switzerland
  • S. Mäkinen
    Tampere University of Technology, Tampere, Finland
  • J. Sauza-Bedolla
    Lancaster University, Lancaster, United Kingdom
 
  The LHC at CERN will continue its operation for approximately 20 years. In parallel, diverse studies are conducted for the design of a future large-scale accelerator. One of the options is the Compact Linear Collider (CLIC) who aims to provide a very high accelerating gradient (100 MV/m) achieved by using normal conducting radiofrequency (RF) cavities operating in the X-band range (12 GHz). Each accelerating structure is a challenging component involving ultra-precise machining and diffusion bonding techniques. The first stage of CLIC operates at a collision energy of 380 GeV with an accelerator length of 11 km, consisting of 21630 accelerating structures. Even though the prototypes have shown a mature and ready to build concept, the present number of qualified suppliers is limited. Therefore, an industrialization study was done through a technical survey with hi-tech companies. The aim is to evaluate current capabilities, to ensure the necessary manufacturing yield, schedule, and cost for mass production. This paper presents the results of the industrialization study for 12 GHz accelerating structures for CLIC 380 GeV, highlighting the principal challenges towards mass production.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB416  
About • paper received ※ 19 May 2021       paper accepted ※ 22 June 2021       issue date ※ 14 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB013 Magnetic Measurements at Warm of the First FCC-ee Final Focus Quadrupole Prototype multipole, quadrupole, induction, simulation 3777
 
  • M. Koratzinos
    MIT, Cambridge, Massachusetts, USA
  • G. Kirby, M. Liebsch, C. Petrone
    CERN, Geneva, Switzerland
 
  The first FCC-ee final focus quadrupole prototype has been designed, manufactured, assembled and tested at warm. The prototype is a single aperture quadrupole magnet of the CCT type. One edge of the magnet was designed with local multipole cancellation, whereas the other was left with the conventional design. An optimized rotating induction-coil sensor was used. A technique was developed to take into account field distortions due to the environment of the test and distinguish them from magnet effects, demonstrating an excellent field quality for the prototype.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB013  
About • paper received ※ 11 May 2021       paper accepted ※ 28 July 2021       issue date ※ 16 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB187 Determination of Required Tolerances and Stop Band Width for Cells Manufacturing and Tuning in Compensated High Energy Accelerating Structures coupling, linac, cavity, hadron 4139
 
  • I.V. Rybakov, V.V. Paramonov
    RAS/INR, Moscow, Russia
 
  The required value of the spread for accelerating field distribution comes from the beam dynamics conditions and for cavities in high energy hadron linacs is ~1%. The standard deviation of the accelerating field distribution depends on the spread in frequencies of accelerating and coupling cells, stop bandwidth and deviations in coupling coefficients. The deviations in frequencies for accelerating, coupling cells, coupling coefficients, are directly related to tolerances manufacturing tolerances for cells. The stop bandwidth should be adjusted with cell tuning. Relations between the standard deviation of field distribution and deviations in cells parameters* are known. Together with the relation between deviations in cells dimensions and cells parameters** recommendations for cells manufacturing tolerances could be obtained. In relation to the coupling coefficient of compensated accelerating structures (ACS, SCS, CDS, DAW) for high-energy parts of linacs some recommendations for the determination of optimal manufacturing tolerances and acceptable stopband are presented.
* V.F. Vikulov and V.E. Kalyuzhny // Tech. Phys., v. 50, 1980, pp. 773-779
** I.V. Rybakov, V.V. Paramonov, A.K. Skassyrskaya // Proc. RuPAC 2016, pp. 291-293
 
poster icon Poster THPAB187 [0.649 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB187  
About • paper received ※ 18 May 2021       paper accepted ※ 25 June 2021       issue date ※ 24 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAB235 Detailed Electromagnetic Characterisation of HL-LHC Low Impedance Collimators impedance, simulation, operation, collimation 4258
 
  • A. Kurtulus, C. Accentura, N. Biancacci, F. Carra, F. Caspers, N. Chitnis, F. Giordano, R. Illan Fiastre, S. Joly, I. Lamas Garcia, L. Mourier, E. Métral, S. Redaelli, B. Salvant, W. Vollenberg, C. Vollinger, C. Zannini
    CERN, Geneva, Switzerland
 
  The High Luminosity Large Hadron Collider (HL-LHC) project will upgrade the LHC machine to allow operation with increased luminosity for the experiments. In order to achieve this goal, different operational parameters of the machine need to be pushed beyond the present design values, including the stored beam energy. One of the main challenges related to the achievement of the upgraded performance is the beam collimation system and its contribution to the overall machine impedance budget. In this perspective, new low impedance collimators have been designed, fabricated, and installed in the LHC. In this study, we will present their detailed electromagnetic (EM) characterization by means of radio frequency (RF) measurements and EM simulations.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2021-THPAB235  
About • paper received ※ 19 May 2021       paper accepted ※ 19 July 2021       issue date ※ 10 August 2021  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)