Keyword: power-supply
Paper Title Other Keywords Page
MOPGW008 Transparent Injection for ESRF-EBS injection, kicker, SRF, sextupole 78
 
  • S.M. White, N. Carmignani, M. Dubrulle, M. Morati, P. Raimondi
    ESRF, Grenoble, France
 
  The commissioning of the ESRF-EBS storage ring will start in December 2019 ultimately providing a horizontal emittance of 130 pm, 30 times lower than the present one. Due to the reduced beam lifetime top-up operation will be required for all operating modes. Transparent injection, i.e. with negligible perturbations on the stored beam, is necessary to allow continuous data acquisition for beam lines experiments. Several options have been considered at ESRF to reduce these perturbations down to a fraction of the rms beam size: i) new kickers power supplies with slow ramping time to facilitate active compensation are under development and will be implemented in the coming years ii) in parallel, long term solutions using non-linear kickers and longitudinal on-axis injection have been investigated.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPGW008  
About • paper received ※ 13 May 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMP022 K-Modulation in Future High Energy Colliders quadrupole, luminosity, collider, optics 476
 
  • M. Hofer, F.S. Carlier, R. Tomás
    CERN, Geneva, Switzerland
 
  K-Modulation of the quadrupoles closest to the interaction point (IP) has been an indispensable tool to accurately measure the beta-function in the interaction point (β*) in the Large Hadron Collider (LHC) at CERN. K-Modulation may become even more important to control the lower β* and reach the design luminosities in the High-Luminosity LHC (HL-LHC) and the Future Circular Collider (FCC). K-Modulation results also provide important input for the luminosity calibration and help in the identification and correction of errors in the machines. This paper presents a method for determining β* using K-Modulation adapted to the characteristic layout of both colliders. Using the latest models for the HL-LHC and the FCC-hh, estimated uncertainties on the measurements are presented. The results are compared to the accuracy of an alternative modulation scheme using a different powering scheme.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPMP022  
About • paper received ※ 06 May 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPMP045 RHIC Heavy Ion Operation With Near-Integer Working Point acceleration, controls, feedback, operation 544
 
  • C. Liu, G.J. Marr, A. Marusic, M.G. Minty, V. Schoefer
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The interplay of space charge and beam-beam effects limits the beam lifetime at low energies at the Relativistic Heavy Ion Collider (RHIC). To improve the beam lifetime, a near-integer working point (0.096/0.094) was tested at fixed energy and during acceleration. In the demonstration experiments, we observed the benefit of the near-integer working point on beam lifetime, however, did not achieve the desired level of orbit correction. This article will present the experimental results of operation with a near-integer working point, and analyze the causes of the orbit control problem.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPMP045  
About • paper received ※ 14 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPRB018 Conceptual Design of Negative-Muon Decelerator for Material Science cavity, induction, experiment, impedance 610
 
  • C. Ohmori, M. Otani, K. Shimomura
    KEK, Tokai, Ibaraki, Japan
  • T. Takayanagi
    JAEA/J-PARC, Tokai-mura, Japan
 
  In 2018, a Negative-Muon Spin Rotation and Relaxation technique was developed in J-PARC Material and Life Science Facility. It is a novel scheme to investigate the motion of hydrogens in the chemicals and materials. To study small samples, the surface of materials and thin foils, a low energy negative muon beam is required. To decelerate intense 300-keV muons to 15-keV, we propose a system which consists of pulse generators and multi-gap induction decelerators. In this design, an inductive adder scheme is considered to use for the high voltage pulse source. High impedance magnetic alloy ring cores will be loaded in the decelerator cells. The high impedance cores which have much larger size than those for public use were developed for J-PARC RF systems and used for many applications including CERN booster RF, anti-proton deceleration and medical accelerator. In this paper, we present a conceptual design of muon deceleration system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPRB018  
About • paper received ※ 13 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPTS114 Upgrades for Subsystems of the 200 MeV H Linac at BNL linac, controls, DTL, cavity 1152
 
  • D. Raparia, G. Atoian, D.M. Gassner, D. Goldberg, O. Gould, T. Lehn, V. LoDestro, M. Mapes, M. Mapes, I. Marneris, S. Polizzo, J. Ritter, A. Zaltsman, A. Zelenski
    BNL, Upton, Long Island, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
To increase the average current for isotope production by factor of two, we have undertaken several upgrades for our 50-year-old 200 MeV H linac. Average current will be double by increasing the beam pulse length. We are testing the DTL tanks reliability by increasing RF pulse length and replacing weak RF joints. We are in the process of replace 50-year old ion pumps and a new PLC based vacuum I&C system for the DTL tanks. We are also upgrading/replacing/adding LLRF, diagnostics, machine protection system, and quadrupole power supply. Paper will present status of these activity and future plan.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-MOPTS114  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP001 Design and Experimental Results of a 1.1kA/800V AC Power Supply for Sirius Booster Dipoles controls, dipole, booster, synchrotron 1227
 
  • C. Rodrigues, G.O. Brunheira, B.E. Limeira, G.M. Rogatto
    LNLS, Campinas, Brazil
 
  Sirius is a 4th generation synchrotron light source de-signed and being built by Brazilian Synchrotron Light Laboratory (LNLS), with first beam scheduled for 2019. Approximately thousand power supplies (PS) will be needed to feed all the magnets, being 57 to operate the booster injector. The two booster dipole PS are the most complex, not only due to their higher current (1.1 kA), voltage (800 V) and power (333 kW) output, but also because the current must follow a quasi-triangular waveform, from a value close to zero to almost the maximum in 320 ms and at a repetition rate of 2 Hz. Due to the high output values, each PS is formed by two sets in parallel of 4 modules in series, what means 8 modules with 550 A / 200 V output. In order to reduce the 2-Hz effect in the grid, each module has two main stages. The input stage has the function to regulate the average voltage in a capacitor bank consuming a constant RMS current from the grid, which value depends on of the PS average output power. The output stage has the function to transfer the energy from the capacitor bank to the load, with the output cur-rent following the reference waveform. This work describes this PS, showing its topology, some aspects of its design and obtained results.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP001  
About • paper received ※ 13 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP002 Overview of Sirius Power Supply System controls, dipole, synchrotron, quadrupole 1230
 
  • C. Rodrigues, G.O. Brunheira, B.E. Limeira, R.J. Marcondeli, M.G. Martins, G.R. Oliveira, A.R.D. Rodrigues, G.M. Rogatto, A.P.A. Silva, A.R. Silva, H. Sousa
    LNLS, Campinas, Brazil
 
  Sirius is a 4th generation synchrotron light source designed and under construction by Brazilian Syn-chrotron Light Laboratory (LNLS), which first beam is scheduled to operate in 2019. Almost a thousand Pow-er supplies (PS) will be needed to feed all magnets of the magnetic lattice, with outputs ranging from 10A to 1.1kA and 50W to 333kW. Almost all power supplies were designed at LNLS. Only three families of power modules were de-signed: low power (FBP), high power (FAP) and AC (FAC). Each PS can have up to 8 modules in a parallel or/and series association, in order to reach the rated output values. All PS are digitally controlled by the same hardware and firmware, also developed by LNLS, called Digital Regulation System (DRS), but with different parameter settings. The DRS is also responsible by the communi-cation with other systems, PS monitoring, data man-agement, etc. This work presents an overview of this system, showing the PS specifications, family topologies and results of tests.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP002  
About • paper received ※ 13 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP014 Digital Control System of High Precision Magnet Power Supply for SPring-8-II controls, feedback, FPGA, synchrotron-radiation 1259
 
  • C. Kondo, K. Fukami, S. Takano, T. Watanabe
    Japan Synchrotron Radiation Research Institute (JASRI), RIKEN SPring-8 Center, Hyogo, Japan
  • T. Fukui, H. Tanaka
    RIKEN SPring-8 Center, Sayo-cho, Sayo-gun, Hyogo, Japan
  • S. Nakazawa
    SES, Hyogo-pref., Japan
  • N. Nishimori
    QST, Tokai, Japan
  • C. Saji
    JASRI/SPring-8, Hyogo-ken, Japan
 
  For the SPring-8 upgrade plan, SPring-8-II, a variety of magnet power supplies (PS) from 10 W to larger than 100 kW with a high current stability of about 10 ppm (pk-pk, typ.) are required. In order to develop the PSs within a given time and budget, we plan to use a common control system based on a digital control technology that can be adopted for the variety and the high precision PSs. The system consists of a high-precision analog-digital converter (ADC) circuit and a field programmable gate array (FPGA). Since the precision of the ADC circuit determines the current stability of the PS, we first developed the ADC circuit of high accuracy of less than 10 ppm (pk-pk). A proportional-integral (PI) control logic and a digital pulse width modulation (PWM) function was implemented in the FPGA firmware. These functions can be easily modified for each power supply by a desktop computer. We prototyped a DC power supply equipped with the newly developed digital feedback control system and confirmed that the current fluctuation was suppressed to less than 10 ppm (pk-pk). In the presentation, we will report the current status and future perspective of our power supply development including the evaluation results of the new circuits and the power supply we have developed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP014  
About • paper received ※ 16 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP015 Magnet Power Supply Calibration with a Portable Current Measuring Unit at the J-PARC Main Ring feedback, operation, timing, controls 1263
 
  • K. Miura, Y. Kurimoto, Y. Morita, D. Naito, T. Oogoe, T. Shimogawa
    KEK, Ibaraki, Japan
  • Y. Kuniyasu
    Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
  • K. Ooya
    SANKYU PLANT TECHNO CO., LTD., 6-5-3, Kachidoki, Japan
  • R. Sagawa
    Universal Engineering, Ibaraki-ken, Japan
 
  In the J-PARC MR, 96 bending magnets (BMs) are used in total. They are divided into 6 groups of 16 BMs. The 16 BMs in each group are connected in series and driven by a single power supply. Since all 96 BMs are symmetrically located in the ring, the magnet currents regulated by the 6 power supplies need to be same. Each power supply performs output current feedback control using electronic circuits including analog amplifications and AD / DA conversions. Due to individual differences of the electronic circuits, output current is generally expected to be different for each power supply. Therefore, we developed a current measurement unit with the portable DCCT as an independent reference. Further, we measured the magnet currents regulated by the 6 BM power supplies using the unit. We report the details of the unit as well as the results of the current measurements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP015  
About • paper received ※ 14 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP017 Design of Scanning Magnet Power Supply for HUST-PTF target, controls, proton, simulation 1269
 
  • X.Y. Li, Y.Y. Hu, Y.J. Lin, P. Tan, X.D. Tu, Y.C. Yu, L.G. Zhang, Z.Q. Zhang
    HUST, Wuhan, People’s Republic of China
 
  An active scanning proton therapy facility is being de-veloped at Huazhong University of Science and Technol-ogy(HUST). By controlling the deflection position of the beam with scanning magnets at different times, the superposition of discrete spot beams will form a specified shape and dose distribution conformal to the target tu-mour. A high precision and fast response power supply is required to deflect the beam quickly and accurately. In this paper, the TOSCA module in Opera3D is used to model and simulate the scanning magnets and to obtain the equivalent inductance of the magnet. Then the calcu-lated equivalent resistance inductance instead of the magnet is used to design the scanning magnet power supply. A high-voltage bridge is utilized to achieve fast response speed, and a low voltage bridge and PI control algorithm is adopted to ensure power supply accuracy. The Simulation result shows that the designed power supply meets the requirements of response speed and accuracy.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP017  
About • paper received ※ 30 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP020 The Research on the Calibration of Direct-Current Current Transformers experiment, collider, factory, data-acquisition 1280
 
  • C. Han, Y. Gao, X.L. Guo, P. Liu
    IHEP, Beijing, People’s Republic of China
 
  The measurement accuracy of direct current-current transformer (DCCT) is one of the key factors influencing the output of high-precision direct current power supply. In this paper, a calibration system designed by measuring resistance principle with a high accuracy direct current comparator (DCC) was presented for DCCT whose measurement accuracy is better than 10-5. The system can achieve high-precision calibration of DCCT within the measurement range of 0-400 A, and the uncertainty of the system calibration is better than 1.1×10-6 in the whole range. The accuracy and linearity of DCCT are tested to verify the accuracy of the whole calibration system, thereby the current accuracy of the magnet power supply can be further improved.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP020  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP022 Research on Digital Scanning Power Supply Technology for Proton Therapy System proton, controls, scattering, radiation 1286
 
  • J. Huang, M. Fan, J. Yang, L.G. Zhang
    HUST, Wuhan, People’s Republic of China
  • T. Yu, C. Zuo
    Huazhong University of Science and Technology, State Key Laboratory of Advanced Electromagnetic Engineering and Technology,, Hubei, People’s Republic of China
 
  Funding: Work supported by The National Key Research and Development Program of China, with grant No. 11505068
Proton has great advantages in the field of cancer radiotherapy because of its good characteristic of Bragg peak. HUST-PTF is a proton therapy facility under development in Huazhong University of science and technology. It delivers the beam to the patients with a pencil beam scanning nozzle. Scanning power supplies are placed in the nozzle of the proton therapy device and they are required high accuracy, high speed and high stability. In this paper,the structure diagram of HUST-PTF is shown. The parameters of scanning magnets and its power supply are introduced. Finally, some test results of power supply are shown. The next work will debug the control system of the scanning power supply and adjust it with the scanning magnet to see if it meets the design requirements.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP022  
About • paper received ※ 19 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP023 Design of Digital Controller for Multi Module Series-parallel Accelerator Power Supply controls, simulation, hardware, software 1288
 
  • J. Li, Y. Liu, X. Qi, W.Q. Zhang
    IHEP, Beijing, People’s Republic of China
 
  Funding: Supported by funds, Key laboratory of particle Acceleration Physics & Technology, Institute of High Energy Physics, Chinese Academy of Sciences,Project number:Y5294107TD
With the development of accelerators, Accelerator physics require power supply output high voltage and current (Peak power reached MWs). And the current stability requirements better than 10ppm. Therefore, the power supply is mostly used in the mode of module series-parallel. However, during actual commissioning, the power supply often does not run at rated current. If the power supply is running at less than 30% of the rated current, the power output current stability will drop sharply. This topic designed a set of digital controller for multi-module serial-parallel control. The digital controller can automatically adjust the number of input modules according to the current setting, and can automatically allocate the required PWM number of the module. While taking into account the synchronization between the various modules, Ensure the power supply is always running at an optimal working condition. Through a special AD conversion hardware design and advanced closed-loop controller algorithm, the digital controller can provide up to 20 high-resolution PWM signals to drive power conversion devices.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP023  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP024 Research on Module Design and Network Management of Accelerator Power Supply System controls, interface, operation, network 1291
 
  • Y. Li, S.Y. Chen, C. Han, P. Liu
    IHEP, Beijing, People’s Republic of China
 
  Accelerator power supply system is a very special system. Many factors such as high number of power supplies, uninterrupted operation and unreasonable design lead to high failure rate, long maintenance time and the discovery of the fault is not timely, which bring a lot of unnecessary troubles to the operator. In this paper, a networked control method for accelerator power supply is studied, and the power supply parallel connection technology is used to maximize the trouble-free time of the power supply and increase the redundancy performance of the power supply. With independent networked control, the accelerator power supply system becomes a whole, no longer relying solely on the control of the accelerator control system, but in a network system with self-diagnosis and self-healing. Through the monitoring and management of the upper computer, the power supply system will be work stable, and the function of remote operation and remote repair of the power supply is realized finally. This is a research direction for the operation of large accelerator power supply systems in the future.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP024  
About • paper received ※ 14 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP025 Design of Fast Corrector Magnet Power Supply for HEPS controls, simulation, experiment, radiation 1294
 
  • P. Liu, C. Han, F. Long
    IHEP, Beijing, People’s Republic of China
 
  High energy photon source is a fourth-generation synchrotron radiation light source with energy of 6Gev and ultra-low emittance (<0.1nm’rad). The ultra-low beam emittance requires high beam stability. Therefore, we develop a fast correction power supply with high bandwidth and low current ripple to improve the performance of the fast close orbit correction sys-tem to prove the high beam stability. The power supply adopts FPGA for full-digital control and use high speed ADC with temperature control. The power sup-ply has a small signal-bandwidth of 10 kHz and output current ripple lower than 20ppm. In this paper, we will describe the hardware design and software control methods and the test results will be demonstrated  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP025  
About • paper received ※ 13 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP027 Research and Design of Digital Magnet Power Supply Controller controls, Ethernet, real-time, FPGA 1297
 
  • Z.X. Shao, H. Gao, G. Liu, P. Liu, X.K. Sun, H.Y. Zhang
    USTC/NSRL, Hefei, Anhui, People’s Republic of China
 
  Funding: Supported by’the Fundamental Research Funds for the Central Universities’(WK2310000064)
Hefei Advanced Light Source (HALS) is the fourth-generation radiation light source in China which is under design. Ultra-low beam emittance requires higher performance of power supply system. The power supply controller is a key part of the power system. This article describes the design and testing of high-stability power controllers and fast corrector power supply controllers. A new controller architecture is proposed for the problems of the two controllers.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP027  
About • paper received ※ 29 April 2019       paper accepted ※ 18 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP028 Research Progress of Power Supply System in HALS controls, dipole, ISOL, interface 1300
 
  • Z.X. Shao, H. Gao, G. Liu, P. Liu, L. Wang, H.Y. Zhang
    USTC/NSRL, Hefei, Anhui, People’s Republic of China
 
  Funding: Supported by ’the Fundamental Research Funds for the Central Universities’(WK2310000064) Supported by the Hefei Advanced Light Source Pre-research Project.
Hefei Advanced Light Source (HALS) is the fourth generation light source in China’s planning and construction. In order to achieve the diffraction limit of the emission and improve the beam quality, the research on magnet power supply (MPS) technology is essential. We have designed a variety of solutions for different power supplies. We designed the first version of the high stability power supply control card. The first version of the high-stability power supply control card was designed and tested with a small power module. Our pre-research system has developed a corrector magnet power supply with a small signal response bandwidth higher than 10 kHz. The developed power prototypes all use self-developed controllers, and most of the test results can meet the requirements. This article describes the progress of the HALS power supply system.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP028  
About • paper received ※ 08 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP046 Improvement the Bending Magnet Power Supply Performance for TPS Storage Ring storage-ring, feedback, controls, photon 1353
 
  • B.S. Wang, C.H. Huang, J.C. Huang, C.Y. Liu, K.-B. Liu, Y.S. Wong
    NSRRC, Hsinchu, Taiwan
 
  In the TPS (Taiwan Photon Source) facility, current stability of the electron beam depends on the bending magnet power supply and an orbit FOFB system to compensate the magnetic field. Due to the output current stability of the bending magnet power supply drifts with temperature so the orbit FOFB system should be applied to fine tune magnetic field and the photon beam should circulate in storage ring. In this paper, to stabilize the temperature of regulation circuit’s temperature box of the bending magnet power supply, the long-term output current stability is improve from ± 50ppm to ± 10ppm, and orbit FOFB system substantially reduce the tune X of beam position, effectively increasing the beam current stability and quality.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP046  
About • paper received ※ 12 April 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPMP053 Test Results of the Low-Stored-Energy -80 kV Regulator for Ion Sources at LANSCE linac, ion-source, controls, flattop 1369
 
  • J.T. Bradley III, L.N. Merrill, G. Rouleau, W. Roybal, G. Sanchez
    LANL, Los Alamos, New Mexico, USA
 
  Funding: Work supported by the U. S. Department of Energy.
The H ion source at the LANSCE accelerator facility uses an 80 kV accelerating column to produce an H ion beam. A regulated power supply maintains the source and support equipment racks at -80kV with respect to local ground. As the facility’s H beam currents have been increased, voltage droop on the regulated -80 kV power supply has become one of the limiting factors on beam current. The previous regulator used a standard 120kV DC HV supply and a high power planar triode in series to regulate the voltage down to 80 kV and to stop the flow of current during an arcdown of the -80 kV accelerating column. In 2018 we devised a method of using a pair of standard, 50 kV capacitor charging supplies to produce the required 80 kV with minimal stored energy and significantly better voltage regulation over the beam pulse. This configuration has been tested on the Ion Source Test Stand and is being considered for installation on the main LANSCE linac. We will present the design, modeling and measured results of the new system as compared with the performance of the previous system.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPMP053  
About • paper received ※ 14 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS030 The New High Field Septum Magnets for Upgrading of Fast Extraction in Main Ring of J-PARC operation, extraction, septum, flattop 2001
 
  • T. Shibata, K. Ishii, H. Matsumoto, T. Sugimoto
    KEK, Ibaraki, Japan
  • K. Fan
    HUST, Wuhan, People’s Republic of China
 
  The J-PARC Main Ring (MR) is working on imporved beam to 750 kW by shorting the repetition period from 2.48 s to 1.3 s which we call 1Hz operation. There are fout high field septum magnet along the fast extraction line in the MR, and these will be improved to the new magnets which can operate 1Hz frequency. The new high field septa will be installed in 2021. In this poster we will report about the performance of these new septum magnets. These high field septum magnets are called Septum 30(SM30), 31(SM31), 32(SM32), 33(SM33). We will replace SM30, SM31, and SM32. One reasons of cethe replacement is installation of a large-size quadrupole magnet to upsteam postion of the septa. We need to change the longitudinal length of the septa. Second is large aperture of the beam duct for reduction of beam loss by the collision of the halo of the proton beam to the duct. The new high field SM30, SM31 and SM32 have large aperture. and the material of the beam ducts for extraction line are ceramics for reduction of amount of heat generation by eddy current on the surface of the duct. The maetial of the circulating duct are titanium for reduction of radioactivation. On the other hand, the power supply will not be replaced, then the current power supplies will be used for these new septa. The new SM30, SM31, and SM32 were produced in 2015. The first test operation of SM31 were conduced with 2.48 s repein 2015, and we have meaured the magnetic field without problem. In 2018, we conduced the first 1Hz operation with SM30. The minimum repetition period of the operation was 1.16 s without any problem. We measuered magnetic fields in the gap of the pole and in the circulating beam duct. In this report we will report the detail of the results of the operation and field measurement.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS030  
About • paper received ※ 26 April 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS035 Vacuum Tube Operation Analysis for 1.2 MW Beam Acceleration in J-PARC RCS acceleration, cavity, vacuum, operation 2017
 
  • M. Yamamoto, M. Nomura, T. Shimada, F. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
  • M. Furusawa, K. Hara, K. Hasegawa, C. Ohmori, Y. Sugiyama, M. Yoshii
    KEK, Tokai, Ibaraki, Japan
 
  The J-PARC RCS has successfully accelerated 1 MW proton beam, matching the designed beam power. Therefore, we have considered acceleration beyond the designed beam power, with the next target being 1.2 MW. An issue for 1.2 MW beam acceleration is the rf system. The present anode power supply is limited by its output current, and the vacuum tube amplifier suffers from an unbalance of the anode voltage swing, arising from the combination of multi-harmonic rf driving and push-pull operation. We have investigated the mitigation of the maximum anode currents and unbalanced tubes by choosing appropriate circuit parameters of the rf cavity with the tube amplifier. We describe the analysis results of the vacuum tube operation for 1.2 MW beam acceleration in the RCS.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS035  
About • paper received ※ 14 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS048 Preliminary Study on the Injection System Upgrade for CSNS-II injection, simulation, linac, neutron 2037
 
  • S. Wang, M.Y. Huang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
 
  Funding: Work supported by National Natural Science Foundation of China (Project No. U1832210)
The first phase of the China Spallation Neutron Source (CSNS-I) had completed the national acceptance in August, 2018. The physics design of the second phase (CSNS-II) has already begun. The CSNS-II accelerator upgrade contains three main components, including the Linac energy upgrade from 80 MeV to 300 MeV, injection system upgrade, and new Magnetic Alloy dual-harmonic cavity. In this paper, a preliminary study on the injection system upgrade had been done. A preliminary upgrade scheme for the injection system would be given. Furthermore, some preliminary simulation and calculation for the upgrade injection system had been carried out. The analysis results showed that most injection parameters can preliminarily meet the requirements of accelerator power upgrade.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS048  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPTS086 SNS Proton Power Upgrade Status klystron, injection, DTL, linac 2124
 
  • M.A. Plum, D.E. Anderson, C.N. Barbier, M.S. Champion, M.S. Connell, J. Galambos, M.M. Harvey, M.P. Howell, S.-H. Kim, J. Moss, B.W. Riemer, R.W. Steffey
    ORNL, Oak Ridge, Tennessee, USA
 
  Funding: Work performed at (or work supported by) Oak Ridge National Laboratory, which is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.
The Proton Power Upgrade (PPU) project at the Oak Ridge Spallation Neutron Source aims to double the beam power capability of the accelerator, from 1.4 to 2.8 MW. This will be done by a 30% increase in beam energy (from 1.0 to 1.3 GeV), and a 50% increase in beam current (from 25 to 38 mA averaged over a macropulse). The project is now well underway, after receiving approval to start preliminary design in April 2018. In this paper we will discuss recent technical developments in the project, including the warm linac RF system upgrade, a new topology for the high voltage converter modulators, an engineering review of the power capability of the injection dump, and a 2-MW-capability for the existing target station.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-TUPTS086  
About • paper received ※ 13 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPGW102 Investigation on Mysterious Long-Term Orbit Drift at NSLS-II accumulation, storage-ring, operation, quadrupole 2728
 
  • Y. Hidaka, W.X. Cheng, L. Doom, R.P. Fliller, G. Ganetis, J. Gosman, C. Hetzel, R.A. Hubbard, D. Padrazo Jr, B. Podobedov, J. Rose, T.V. Shaftan, S.K. Sharma, V.V. Smaluk, T. Tanabe, Y. Tian, G.M. Wang, C.H. Yu
    BNL, Upton, Long Island, New York, USA
 
  Funding: The study is supported by U.S. DOE under Contract No. DE-SC0012704.
Over a few months in 2018, we observed occasional episodes of relatively quick accumulation of correction strengths for the fast correctors (used by the fast orbit feedback) near Cell 4 (C04) region at NSLS-II Storage Ring. We immediately started investigating the problem, but the cause remained unclear. However, after coming back from the Fall shutdown, we experienced even faster drifts, at a rate of as much as 10 urad per day in terms of orbit kick angle accumulation. The risk of damage on the ring vacuum chambers by the continuing orbit drift without explanation eventually forced us to take emergency study shifts and temporarily lock out the C04 IVU beamline. After extensive investigation by many subsystem experts in Accelerator Division, ruling out many suspicious sources one by one, we were finally able to conclude the cause to be the localized ground motion induced by large temperature jumps of the utility tunnel right underneath the C04 straight section. We report the details of this incident.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPGW102  
About • paper received ※ 19 May 2019       paper accepted ※ 20 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPRB037 Development of EP System at IHEP cavity, controls, MMI, cathode 2890
 
  • S. Jin, J.P. Dai, J. Dai, H.F.S. Feisi, J. Gao, D.J. Gong, Z.Q. Li, Z.C. Liu, W.M. Pan, P. Sha, Y. Sun, J.Y. Zhai, P. Zhang
    IHEP, Beijing, People’s Republic of China
 
  Electropolishing (EP) is a necessary technology for high quality cavities including both high accelerating gradient and high quality factor cavities, which will be used for several future large projects such as CEPC, Shanghai hard X-ray FEL, ILC, and so on. An EP system was development at IHEP, CAS. In last years, we finished all the engineering design and fabrication including functional circulation loops design, system parameters choices, key equipment choice or design, components test and fabrication. According to the functions of various components, the whole system were divided into three main units: electrolyte mixing, acid solution and mechanical platform, and several key components such as rotation sleeves, DC power supply and so on. Since the system is designed for both R&D and mass production, several characteristics comparing with those in other labs in the world can be realized, including dozens of solution circulations, electrolyte mixing, new and old acid separation, cavity outside water cooling, cathode vertical assembly, and compatible for several types of cavities. We will report them in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPRB037  
About • paper received ※ 21 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPTS029 The Synchronization between BPMs and Corrector Power Supplies in AC Mode of RCS of CSNS timing, MMI, pick-up, neutron 3164
 
  • M.T. Li
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • Y.W. An, S. Wang, S.Y. Xu
    IHEP, Beijing, People’s Republic of China
  • S.Y. Xu
    DNSC, Dongguan, People’s Republic of China
 
  This paper introduces our effort for synchronizing BPMs and Corrector Power Supplies in AC mode of RCS of CSNS. This work helps to increase the accuracy of the response matrix measurement, the obit correction, and other commissioning task.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-WEPTS029  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB003 Automatic Classification of Post Mortem Data for Reduced Beam Down Time synchrotron, real-time, operation, dipole 3799
 
  • M.C. Chalmers, Y.E. Tan
    AS - ANSTO, Clayton, Australia
 
  Time spent recovering from faults that result in a rapid loss of stored current (a total beam loss event) can be costly to the Australian Synchrotron facility and its researchers. The identification of a fault leading to total beam loss is assisted by a large variety of investigative tools for specific tasks, but they do not often give a thorough overview of all systems required to store beam. Post mortem data uniquely provides insight into how the beam was behaving at the specific time the dump occurred. With machine learning, we find that we can automatically and rapidly identify many types of total beam loss events by learning about the unique characteristics in the post mortem files.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB003  
About • paper received ※ 15 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB025 New MicroTCA Piezo Driver (PZT4) cavity, high-voltage, controls, operation 3860
 
  • K.P. Przygoda, L. Butkowski, M. Fenner, M. Hierholzer, R. Rybaniec, H. Schlarb, Ch. Schmidt
    DESY, Hamburg, Germany
  • R. Rybaniec
    PSI, Villigen PSI, Switzerland
 
  In the paper we would like to present a new Micro Telecommunication Computing Architecture (MicroTCA) piezo driver (PZT4). The piezo driver module is capable of driving of 4 piezo actuators with high voltages up to 160 Vpp. It is also possible to measure cavity mechanical vibrations using 4 analog to digital converters (ADC) ported to the driver electronics. The new piezo driver can be supplied using internal 12 V payload power provided by the MicroTCA standard. For the applications that need more than 30 W of the input power, the external power supply module can be provided. In order to protect the piezo driver electronics against output short condition a dedicated supervision circuit is designed. The piezo driver module has been setup at Cryo Module Test Bench (CMTB) facility in Deutsches-Elektronen Synchrotron (DESY) as a part of the single cavity low-level radio frequency (LLRF) controls. The LLRF control system has been used to demonstrate the radio frequency (RF) field stabilization and cavity tuning capabilities for continuous (CW) and pulse modes of operation of 1.3 GHz superconducting resonant RF (SCRF) cavity. The preliminary results are demonstrated and briefly discussed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB025  
About • paper received ※ 08 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB036 Development of Injection and Extraction Kickers for SuperKEKB Damping Ring kicker, extraction, injection, damping 3890
 
  • M. Tawada, M. Kikuchi, Y. Sakamoto, H. Someya
    KEK, Ibaraki, Japan
  • K. Tenjin, A. Tokuchi
    Pulsed Power Japan Laboratory Ltd., Kusatsu-shi Shiga, Japan
 
  SuperKEKB is a double ring asymmetric collider to study the B meson physics, which is an upgrade project of KEKB. The 7 GeV electron (HER) and the 4 GeV positron ring (LER) collides at an interaction point. The positron beam produced by linac cannot meet the dynamic aperture restrictions of LER. Damping ring (DR) is required to reduce its injection emittance. Damping ring (DR) for SuperKEKB has two kicker magnets for the injection and the extraction, respectively. These kickers are required to meet the following specifications: (1) rise and fall time does not exceed 100 ns, (2) two bunches which are 96 ns apart must be kicked by single pulse, (3) the stability of peak current for the extraction kickers must be less than 0.1 %. Kicker magnets are designed as a conventional kicker with a ferrite core. The pulse shape is a double half sine for the two bunch injection. In order to achieve short rise time, a saturable inductance is used. The design and performance of kicker magnets and the power supplies are reported.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB036  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB079 DC Testing and Phase Resolved Partial Discharge Measurements of the New Trigger Transformers for the LHC Beam Dump Kickers high-voltage, operation, kicker, GUI 3998
 
  • T. Stadlbauer, A. Chmielinska, L. Ducimetière, D. Kontelis, T. Kramer, V. Senaj
    CERN, Geneva, Switzerland
 
  During LS2 the LHC beam dump kicker pulse generators will be subject to a substantial consolidation program. One major part is the replacement of the existing GTO stack trigger transformer by a new more performant one. The transformer is assembled, moulded and tested in-house. Part of the validation procedure are standard DC tests and subsequent discharge monitoring as well as newly introduced phase resolved partial discharge measurements. This paper briefly highlights the trigger transformer parameters and construction and outlines in detail the testing and partial discharge measurements. It concludes with a comparison and analysis of the results of the different measurement techniques.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB079  
About • paper received ※ 14 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB087 Study of the Energy Savings Resulting from the East Area Renovation ECR, experiment, operation, radiation 4023
 
  • B.LM. Lamaille, F. Dragoni, S. Evrard, F.J. Harden, E. Harrouch, M. Lazzaroni, R. Lopez, K.D. Papastergiou
    CERN, Meyrin, Switzerland
 
  CERN’s East Experimental Area, situated on the Swiss side of the Meyrin site, with its four beamlines, has served physics for more than 40 years. As the building and equipment are reaching their end of life, a thorough consolidation project has been initiated in order to pro-vide many more years of reliable operation. This article addresses the different proposed solutions to reduce significantly the energy consumption of the East Area. It outlines the methodology applied to estimate as precisely as possible the future attained energy savings, which will result in an estimated reduction of approximately 80% in electricity usage (from 11 GWh to 2 GWh per year) and of approximately 65% in gas usage for heating purpose (from 3 GWh to 1 GWh per year).  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB087  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB091 APPLICATION PROGRAMS FOR TPS BEAM TRIP ANALYSIS kicker, electron, photon, operation 4032
 
  • B.Y. Chen, T.W. Hsu, B.Y. Huang, C.S. Huang, C.H. Kuo, T.Y. Lee, W.Y. Lin
    NSRRC, Hsinchu, Taiwan
 
  For the Taiwan Photon Source (TPS), the orbit inter-lock system is one of the most important machine pro-tection systems. It is the fastest and the most preferred system to detect abnormalities to prevent possible dam-ages caused by magnet power supply failures or subsys-tems failures. In order to monitor electron orbit changes during a beam trip, we developed the ’orbit monitoring and recording tool’, the ’TBT BPM analysis tool’ and the ’magnet power supply recording and analysis tool’ to assist us in the failure analysis as will be discussed in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB091  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB105 ESS Klystron Production Test Stand klystron, high-voltage, controls, cathode 4074
 
  • I. Roth, M.P.J. Gaudreau, M.K. Kempkes, N. Silverman, R.E. Simpson
    Diversified Technologies, Inc., Bedford, Massachusetts, USA
 
  Diversified Technologies, Inc. (DTI) has delivered a new long-pulse modulator klystron test stand to Communication and Power Industries (CPI) in Palo Alto, CA for full power testing of production VKP-8292A klystrons for the European Spallation Source (ESS). This test stand was built using hardware and designs from an earlier SBIR effort for the US Department of Energy, with modifications to support ESS requirements and klystron testing operation. Earlier versions of this design are in use at IPN Orsay and CEA Saclay in France to test RF components for ESS. This new klystron test stand allows testing of klystrons at the full ESS specifications: 100 kV, 50 A, 3.5 ms pulse, 14 Hz,. This design is based on a (patent pending) non-dissipative regulator that compensates for the capacitor droop voltage (~20%) during the pulse. This allows a much smaller capacitor than would nominally be required for the long ESS pulse, eliminating the need for larger, more expensive capacitor bank. This test stand will speed delivery of ESS klystrons, and similar, long pulse, high power klystrons at CPI.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB105  
About • paper received ※ 19 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPRB117 Stability and Reliability Issues of PAL-XFEL Modulator FEL, klystron, operation, electron 4096
 
  • S.H. Kim, H.-S. Kang, K.H. Kim, H.-S. Lee, C.-K. Min, S.S. Park, Y.J. Park
    PAL, Pohang, Kyungbuk, Republic of Korea
 
  Funding: This work is supported by Ministry of Science, ICT(Information/Communication Technology) and Future Planning.
The Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL) employs 51 units of the pulse modulator in order to obtain the 10 GeV electron beam, which drive one X-band to linearize and 50 S-band klystrons. The PAL-XFEL requires very tight control of the klystron RF phase jitter 0.03-degree for S-band RF, 0.1-degree for X-band RF and the beam voltage stability of below 50 ppm. The RF phase jitter is directly related to the amplitude stability of modulator output pulses. There are several factors to satisfy the stability and reliability for the PAL-XFEL modulator. The largest sources of pulse-to-pulse instability are a current charging power supply (CCPS) for PFN charging, a thyratron switch, and a klystron focusing magnet power supply (MPS). In this paper, the operation and debugging results of those devices are described.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPRB117  
About • paper received ※ 16 April 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS004 The Sirius Heating System for the In-situ NEG Activation controls, vacuum, storage-ring, software 4109
 
  • P.H. Nallin, M. Bacchetti, F.G.R. Carrera, D.R. Cavalcante, R.O. Ferraz, P.P.S. Freitas, G.R. Gomes, J.G. Hidalgo, R.T. Neuenschwander, F.A.M. Pinto, A.R.D. Rodrigues, R.M. Seraphim
    LNLS, Campinas, Brazil
 
  Sirius is a 3 GeV fourth-generation synchrotron light source under commissioning in Brazil, with 518 m circumference and a bare lattice emittance of 0.25 nm.rad. This ultra-low emittance machine is based on approximately 700 magnets with 28 mm typical gap. The standard vacuum chamber, that makes up around 80% of the circumference, is a 26 mm external diameter copper tube. Due to the small conductance of the chambers and the limited space between the magnets, the vacuum pumping will be based on distributed concept and then non­-evaporable getter (NEG) coating will be extensively used. To activate the NEG coating, the chambers must be heated at 200°C for about 24 hours. The solution for Sirius was the development of an ultra-thin heating tape, 0.4 mm thick, which allows an in-situ bake-out. The developed tapes are able to operate continuously at 220°C and have in their design a thermal shield that reduces the radiation heat loss to the magnets. This paper describes the development of the heating tape, its power supply, the control software and the operation of the system during the NEG activation at Sirius.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS004  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS027 Accelerator Implementing Development of Ceramics Chamber with Integrated Pulsed Magnet for Beam Test kicker, vacuum, dipole, injection 4164
 
  • C. Mitsuda, Y. Kobayashi, S. Nagahashi, T. Nogami, T. Obina, R. Takai, H. Takaki, T. Uchiyama, A. Ueda
    KEK, Ibaraki, Japan
  • T. Honiden, T. Nakanishi
    SES, Hyogo-pref., Japan
  • A. Sasagawa, A. Yokoyama, T. Yokoyama
    KYOCERA Corporation, Higashiomi-city, Shiga, Japan
 
  We advance the development of Ceramics Chamber Integrated Pulsed Magnet (CCIPM) of air-core type as the application to low emittance ring with a narrow bore of light source accelerator in the future. The CCIPM is composed of ceramics cylinder of 60 mm diameter and four copper coils, which are implanted in the groove penetrated on the ceramic thickness along 30 cm length by silver brazing*. In addition to this structure, we succeeded in the implementations of cable connecting base that mechanically connect the coils and power supply with feeder lines and the pattern shape coating inside the ceramic cylinder. Improved brazing technique made it possible to braze the coil and the base on the coil at the same time that the coils are implanted in the ceramic thickness. Newly developed functional coating can reduce the eddy current caused by main magnetic field and pass the alternate component of beam wall current by capacitance structure. We report the details about the performance from the viewpoint of vacuum, magnetic field, insulation on the accelerator implementation with the approach to new technical development, and the preparation progress of beam test in beam-transport line.
* C. Mitsuda, et al., in Proc. IPAC2015, Richmond, VA, USA, p. 2879
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS027  
About • paper received ※ 12 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS028 Recent Improvements and Future Upgrades of the J-PARC Main Ring Kicker Systems kicker, operation, injection, extraction 4167
 
  • T. Sugimoto, K. Ishii, H. Matsumoto, T. Shibata
    KEK, Ibaraki, Japan
 
  J-PARC Main Ring provides 500kW proton beam to the long baseline neutrino oscillation experiment (T2K). In order to increase the beam intensity to improve the sensitivity of the CP violation study in neutrino sector, shorter repetition cycle and higher beam current are required. As part of the upgrade project, both injection and fast-extraction (Fx) kicker magnet systems have been improved. Air-cooled non-inductive ceramic resistors are used as the impedance-matching terminator for the injection kicker magnet. Power consumption and temperature rise of the termination resistor due to the beam induced current was simulated to optimize the number of parallel of the resistors. Efficiency of cooling fans was also simulated to improve the cooling ability. For the Fx kicker magnet, a fast charging power supply of the modulator was developed and deployed to shorten the charging period from 1.4 sec to 0.2 sec. This paper represents the simulation results, performance of the charging unit and future upgrade plans.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS028  
About • paper received ※ 21 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS030 HEPS-TF Superconducting Wiggler Control System controls, EPICS, wiggler, interface 4174
 
  • J.C. Wang, C.P. Chu, Y. Gao, Q. Le, J. Liu, R. Ye, M.C. Zhan
    IHEP, Beijing, People’s Republic of China
 
  Funding: HEPS-TF
Superconducting Wiggler (SCW) is an important development direction of insertion devices for modern light sources. It is also the key technology of High Energy Photon Source Test Facility (HEPS-TF) insertion device system research. SCW control system involves power supply, cryogenics,vacuum and other devices, control. Serial port server was built for the SCW control system, with EPICS DB to make the PID algorithm for heater and superconductor cavity pressure, temperature, and with Ziegler-Nichols method to quickly find appropriate PID parameters.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS030  
About • paper received ※ 15 May 2019       paper accepted ※ 22 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS074 The Commission of Home-made 500MHz 80kW Solid-state Amplifier in NSRRC ISOL, MMI, status, HOM 4288
 
  • T.-C. Yu, F.Y. Chang, L.-H. Chang, M.H. Chang, S.W. Chang, L.J. Chen, F.-T. Chung, Y.D. Li, M.-C. Lin, Z.K. Liu, C.H. Lo, Ch. Wang, M.-S. Yeh
    NSRRC, Hsinchu, Taiwan
 
  Solid-state for high power RF application is an attracting and interesting technology which is now become popular in accelerator field. To adopt and master such technique, a 500MHz, 80kW solid-state amplifier is thus developed in NSRRC. The amplifier is consisted of 100 900W amplifier modules which are driving by identical modules. Each module contains input and output directional couplers and status monitoring circuits. To have longer life time and better performance, the RF power transistors are integrated with water cooled heat sink directly. In such way, the transistors have higher output power and better efficiency. The RF power of each module is combined through coaxial combiner while its DC power is provided by parallel connected DC power supplies which can provide better redundancy and reliability. The home-made solid-state amplifier is demonstrated to have quite high quality RF power and reliability with acceptable power combination efficiency.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS074  
About • paper received ※ 29 April 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS084 Magnet Design Optimization for Future Hadron Colliders dipole, collider, hadron, magnet-design 4307
 
  • V.V. Kashikhin, V. Lombardo, G. Velev
    Fermilab, Batavia, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
Fermilab in collaboration with other members of the US Magnet Development Program (MDP) is working on the development of accelerator magnets for future hadron colliders. A 4-layer, 15-T dipole with 60 mm aperture based on Nb3Sn Low Temperature Superconductor (LTS) has been fabricated and tested. It is an important milestone of demonstrating readiness of the LTS magnet technology for the next generation of hadron colliders. At the same time, design studies aimed at boosting the magnet performance even further with the help of High Temperature Superconductors (HTS) are under way. This paper introduces a novel magnet technology - Conductor On Molded Barrel (COMB) optimized for the HTS materials and discusses possible steps towards its demonstration.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS084  
About • paper received ※ 15 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPTS102 Radio Frequency Power Stations for ESS LINAC Spoke Section operation, controls, cavity, site 4346
 
  • C. Pasotti, M. Cautero, T.N. Gucin
    Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
  • C.A. Martins, R.A. Yogi
    ESS, Lund, Sweden
 
  26 equivalent 400 kW Radio Frequency Power Station (RFPS) units will be provided by Elettra as part of the Italian in kind contribution to ESS. They will be installed in the LINAC "Spoke Section". Each RFPS will power a single superconducting spoke cavity in pulsed operation at 352.21 MHz. The RFPS is a complete system that operates unmanned, based on a combination of solid state and tetrode amplification’s stages. The tender specification, the RFPS main features and requested performances are reported here.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-THPTS102  
About • paper received ※ 13 May 2019       paper accepted ※ 23 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRXXPLM3 Development of a Pulsed Power Supply Utilizing 13 kV Class SiC-MOSFET pulsed-power, high-voltage, electron, operation 4364
 
  • K. Okamura, F. Naito, K. Takayama
    KEK, Ibaraki, Japan
  • K. Fukuda, H. Kitai, K. Sakamoto
    AIST, Tsukuba, Ibaraki, Japan
  • T. Kaito
    Chiba Institute of Technology, Narashino, Chiba, Japan
  • D. Kumamoto
    Nagaoka University of Technology, Nagaoka, Niigata, Japan
  • S. Lim, A. Tokuchi
    Pulsed Power Japan Laboratory Ltd., Kusatsu-shi Shiga, Japan
 
  Funding: A part of this work has been implemented under a joint research project of Tsukuba Power Electronics Constellation (TPEC).
To resolve the drawback of conventional thyratron switches, development of a semiconductor high voltage switch utilizing a 13 kV class SiC-MOSFET developed by Tsukuba Power Electronics Constellations (TPEC) is proceeding. At first, the device evaluation test was carried out with a resistive load circuit. With the conditions of drain voltage of 10 kV and load resistance of 1 kΩ, turn on loss Eon, turn off loss Eoff, rise time Tr and fall time Tf were 1.7 mJ, 1.1 mJ, 64 ns, and 75 ns, respectively. As to gate charge characteristics, required electric charge to increase gate source voltage from 0 V to 20 V was about 80 nC. Thereafter, the 2s-12p switch array was designed and assembled, where 12 MOSFETs are equally aligned on a circle shaped circuit board and two circuit boards are stacked in series. A 14 kV-490 A-5 us pulse with a rise time of 430 ns in the long pulse mode and a 18 kV-318 A-1 us pulse with a rise time of 289 ns in the short pulse mode were successfully demonstrated. This switch will be installed as a turn-off switch for the injec-tion ES kicker in the KEK-DA.
 
slides icon Slides FRXXPLM3 [5.088 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2019-FRXXPLM3  
About • paper received ※ 15 May 2019       paper accepted ※ 21 May 2019       issue date ※ 21 June 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)