Low- and Medium-Energy Accelerators and Rings

Linear Accelerators

Paper Title Page
FPAE037 SPIRAL 2 RFQ Prototype First Tests 2488
 
  • R. Ferdinand, G. Congretel, A. Curtoni, O. Delferriere, A. France, D. Leboeuf, J. Thinel, J.-C. Toussaint
    CEA/DSM/DAPNIA, Gif-sur-Yvette
  • A.C. Caruso
    INFN/LNS, Catania
  • M. Di Giacomo
    GANIL, Caen
 
  The SPIRAL2 RFQ is designed to accelerate at 88MHz two kinds of charge-over-mass ratio, Q/A, particles. The proposed injector can accelerate a 5 mA deuteron beam (Q/A=1/2) or a 1 mA particles beam with q/A=1/3 up to 0.75 MeV/A. It is a CW machine which has to show stable operation, provide the request availability, have the minimum losses in order to minimize the activation constraints and show the best quality/cost ratio. The prototype of this 4-vane RFQ has been built and tested. It allowed to verify the mechanical assembly concept (RFQ without any brazing step). The full power was easily injected in the cavity, with no concerns for the RF joints. The paper describes the different achievements.  
FPAE040 First Operation of PIAVE, the Heavy Ion Injector Based on Superconducting RFQ's 2621
 
  • G. Bisoffi, G. Bassato, A. Battistella, G.P. Bezzon, l. Boscagli, A. Calore, S. Canella, D. Carlucci, F. Chiurlotto, M. Comunian, M. De Lazzari, A. Facco, E. Fagotti, A. Lombardi, P. Modanese, M.F. Moisio, A. Pisent, M. Poggi, A.M. Porcellato, S. Stark
    INFN/LNL, Legnaro, Padova
 
  The Positive Ion Accelerator for low-Velocity Ions (PIAVE), based on superconducting RFQ's (SRFQ's), has been completed in fall 2004 with the first acceleration of beams from the ECR ion source. Superconducting RFQ's were used, for the first time, for beam acceleration on a user-oriented accelerator complex. A general status of the injector performances is given: it includes, besides the SRFQ's, eight superconducting (SC) QWR's and three bunchers; the beam is received from an ECR source on a HV platform and is delivered, through the SC accelerator ALPI, to nuclear physics experimental apparatuses. The paper emphasizes, in particular, the technological challenges related to the operation of the SC cavities, the cryogenics, control, diagnostics and vacuum systems.  
FPAE042 Beam Commissioning of the Superconducting RFQs of the New LNL Injector PIAVE 2696
 
  • A. Pisent, G. Bisoffi, D. Carlucci, M. Cavenago, F. Chiurlotto, M. Comunian, E. Fagotti, A. Galatà, M. Poggi, A.M. Porcellato, M. Sattin
    INFN/LNL, Legnaro, Padova
  • T. Kulevoy
    ITEP, Moscow
 
  PIAVE is the new injector of the LNL superconducting heavy ion linac ALPI; the injector is able to accelerate ions up to U (Q/q=8.5) with a final energy of more than 1 MeV/u. During the last two months of 2004 the superconducting RFQ, composed by two Nb structures operating at 80 MHz, has been commissioned using the O+3 and Xe+18 beams produced by the ECRIS ALICE. The beam has been accelerated up to 587 keV/u reaching the main design parameters (energy, longitudinal and transverse emittance, transmission) and demonstrating a stable and reproducible operation. This is the first operational beam accelerated by a superconducting RFQ.  
FPAE043 Transverse Tuning Scheme for J-PARC Linac 2750
 
  • M. Ikegami, Z. Igarashi, S. Lee
    KEK, Ibaraki
  • H. Akikawa, K. Hasegawa, Y. Kondo, T. Ohkawa
    JAERI, Ibaraki-ken
  • H. Ao, S. Sato, T. Tomisawa, A. Ueno
    JAERI/LINAC, Ibaraki-ken
 
  In a high-intensity linac, precise transverse matching is essential for beam halo mitigation. In this paper, we present the supposed transverse tuning scheme for J-PARC linac and the planned beam diagnostic layout for it. Relevantly, we briefly touch upon the tuning scenario for the arc section and the transverse halo collimator system which are located between the linac and the succeeding ring.  
FPAE044 Test Results of the PEFP 3MeV RFQ Upgrade 2842
 
  • Y.-S. Cho, S.-H. Han, J.-H. Jang, H.-S. Kim, Y.-H. Kim, H.-J. Kwon, M.-Y. Park, K.T. Seol
    KAERI, Daejon
 
  Funding: This work is supported by the 21C Frontier R&D program in the Ministry of Science and Technology of the Korean government.

A 3MeV RFQ upgrade for 100MeV proton accelerator has been fabricated at PEFP (Proton Engineering Frontier Project). The tuning of the cavity was carried out before and after the brazing to meet the condition that the quadrupole field profile is within 1% of design value and dipole component is less than 1% of quadrupole one. The ancillary system such as high power RF including klystron power supply and cooling system were already tested up to operating level. Therefore, the main issues of the tests were cavity conditioning up to full power level and low duty beam test. After the completion of the beam test of RFQ itself, the 20MeV DTL which has been tested independently will be carried out. In this paper, the test results of the PEFP 3MeV RFQ upgrade including high power conditioning and low duty beam acceleration are presented.

 
FPAE045 Design of the PEFP MEBT 2881
 
  • J.-H. Jang, Y.-S. Cho, Y.-H. Kim, H.-J. Kwon
    KAERI, Daejon
 
  Funding: This work is supported by the 21C Frontier R&D program in the Ministry of Science and Technology of the Korean government.

A MEBT system of the PEFP(Proton Engineering Frontier Project) has to be installed after the 20MeV DTL where the beam will be supplied to the user group through a beam extraction system. Until now we don't have a plan to put in some matching devices between the RFQ and 20MeV DTL except using the four quadrupole magnets in the first DTL tank as transverse matching tools. The MEBT plays the key role to match the 20MeV output beam into the next accelerator in the longitudinal direction as well as transverse one. This report shows the basic concept and the design status of the system.

 
FPAE046 Initial Test of the PEFP 20MeV DTL 2917
 
  • H.-S. Kim, Y.-S. Cho, S.-H. Han, J.-H. Jang, Y.-H. Kim, H.-J. Kwon, M.-Y. Park, K.T. Seol
    KAERI, Daejon
  • Y.-S. Hwang
    SNU, Seoul
 
  Funding: This work is supported by the 21C Frontier R&D program in the Ministry of Science and Technology of the Korean government.

A conventional 20MeV drift tube linac (DTL) for the Proton Engineering Frontier Project (PEFP) has been developed as a low energy section of 100MeV accelerator. The machine consists of four tanks with 152 cells supplied with 900kW RF power from 350MHz klystron through the ridge-loaded waveguide coupler. We assembled the fabricated accelerator components and aligned each part with care. We have also prepared the subsystems for the test of the DTL such as RF power delivery system, high voltage DC power supply, vacuum system, cooling system, measurements and control system and so on. The detailed description of the initial test setup and preliminary test results will be given in this paper.

 
FPAE047 Test Scheme Setup for the PEFP 20MeV DTL 2965
 
  • H.-S. Kim, Y.-S. Cho, Y.-H. Kim, H.-J. Kwon, K.T. Seol
    KAERI, Daejon
  • Y.-S. Hwang
    SNU, Seoul
 
  Funding: This work is supported by the 21C Frontier R&D program in the Ministry of Science and Technology of the Korean government.

A 100MeV proton accelerator is under development for the Proton Engineering Frontier Project (PEFP). The goal of the first stage of the project is to develop a 20MeV accelerator and the initial test of the 20MeV accelerator will be made. The DTL of 20 MeV accelerator consists of four tanks and will be driven with single klystron, which gives rise to some unique problems with regard to the way of independent resonance control for each tank. Some changes made in the LLRF for reducing phase or amplitude error of cavities affect all of four tanks simultaneously, for which it is not possible to use LLRF for individual control of phase and amplitude of each tank. For independent control of each tank, we are going to use the temperature control of the drift tubes as a frequency tuner. During the initial test of the DTL, the phase of each tank will be synchronized with the first tank phase, and beam based test will be performed as if all of tanks were single unit. The detailed description of the test scheme and the analysis results will be given in this paper.

 
FPAE048 Fabrication of the PEFP 3MeV RFQ Upgrade 3010
 
  • H.-J. Kwon, Y.-S. Cho, J.-H. Jang, H.-S. Kim, Y.-H. Kim
    KAERI, Daejon
 
  Funding: This work is supported by the 21C Frontier R&D program in the Ministry of Science and Technology of the Korean government.

A 100MeV proton accelerator has been developed at PEFP (Proton Engineering Frontier Project) as a 21C Frontier Project. The goal of the first stage of the project is to develop a 20MeV accelerator. The 20MeV accelerator consists of ion source, LEBT, 3MeV RFQ and 20MeV DTL. The 3MeV RFQ was already installed and being tested. During preliminary test, some problems, such as the resonant frequency and field profile tuning, sharp edge in the vane end, inadequate RF seals have been found out. Therefore, it was decided to fabricate another RFQ. The RFQ upgrade includes some characteristics such as constant voltage profile, adoption of transition cell which are different from present one. In this paper, the fabrication of the PEFP 3MeV RFQ upgrade are presented.

 
FPAE049 Development and Implementation of ?T Procedure for the SNS Linac 3064
 
  • A. Feschenko, S. Bragin, Y. Kiselev, L.V. Kravchuk, O. Volodkevich
    RAS/INR, Moscow
  • A.V. Aleksandrov, J. Galambos, S. Henderson, A.P. Shishlo
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.

The ?t procedure is a time of flight technique for setting the phases and amplitudes of accelerating fields in a multi-cavity linac. It was initially proposed and developed for the LAMPF linac in the early seventies and since then has been used in several accelerators. The SNS linac includes four CCL modules (Side Coupled Structure) operating at 805 MHz for the energy range from 86.8 MeV up to 185.6 MeV. The ?t procedure has been implemented for the SNS CCL linac and was used for its initial beam commissioning. Brief theory of the procedure, the results of the design parameter calculations and the experimental results of phase and amplitude setpoints are presented and discussed.

 
FPAE050 Injector Linac for the BNL Super Neutrino Beam Project 3129
 
  • D. Raparia, J.G. Alessi, A. Ruggiero, W.-T. Weng
    BNL, Upton, Long Island, New York
 
  Funding: This work was performed under the auspices of the U.S. DOE, Contract No. DE-AC02-98H10886.

BNL plans to upgrade the AGS proton beam from the current 0.14 MW to higher than 1.0 MW and beyond for such a neutrino facility. We have examined possible upgrades to the AGS complex that would meet the requirements of the proton beam for a 1.0 MW neutrino superbeam facility. We are proposing to replace part of the existing 200 MeV linac with coupled cavity structure from 116 MeV to 400 MeV and then add additional 1.1 GeV superconducting linac to reach a final energy of 1.5 GeV for direct H- injection into the AGS. We will present possible choices for the upgrade and our choice and its design.

 
FPAE051 Performance of a CW RFQ Injector for the IUCF Cyclotron 3179
 
  • V.P. Derenchuk, V. Anferov, G.W. East, D. Friesel, W.P. Jones
    IUCF, Bloomington, Indiana
  • R.W. Hamm
    AccSys, Pleasanton, California
  • J.W.  Staples
    LBNL, Berkeley, California
 
  Funding: The State of Indiana, Indiana University, and the DOE (Grant No DE-FG-02000ER62966) supported this work.

A 750 keV RFQ proton pre-injector was installed in place of a 600 keV Cockroft-Walton high voltage terminal for the IUCF k220 Cyclotron.* The pre-injector consists of a 20 keV microwave ion source and LEBT, a unique design 750 keV CW RFQ, and a short transfer beam line to the k15 injector cyclotron center region.** This pre-injector system was installed and commissioned in June of 2003 and is now in routine service as the sole injection system to the cyclotrons. This contribution will discuss the performance of the CW RFQ pre-injector and the transmission properties of the beam through the cyclotrons.

*D.L.Friesel, et al., App. of Acc. in Res. and Ind., eds. J.L. Duggan and I.L. Morgan, Denton, 651(2000). **V.P. Derenchuk, et al., 2003 Particle Accelerator Conference, Portland, OR, (2003), edited by A. Jackson and E. Lee.

 
FPAE052 The LENS 7 MeV, 10 mA Proton Linac 3200
 
  • V.P. Derenchuk, D.V. Baxter, A. Bogdanov, W.P. Jones, T. Rinckel, K. A. Solberg
    IUCF, Bloomington, Indiana
 
  Funding: This work has been supported by the National Science Foundation under grants DMR-0220560, and DMR-0320627, by the Indiana 21st Century Science and Technology Fund, and by the Department of Defense.

The Indiana University Cyclotron Facility (IUCF) has constructed and placed in operation a Low Energy Neutron Source (LENS) using a 10 mA, 7 MeV proton beam incident on a beryllium target. The proton delivery system (PDS) consists of a 25 keV proton injector, an AccSys Technology, Inc. PL7 Linac* and a beam transport line with non-linear beam spreading.** The accelerator and beamline equipment used in this construction are refurbished and upgraded components from the IUCF CIS/Cooler synchrotron*** facility. After commissioning the beam current at 7 MeV will be 10 mA with a pulse width of up to 300 μs and > 1% duty factor. The PDS was constructed and commissioning started in 2004. First operating results will be described.

*D.L. Friesel and W. Hunt, Linac98, pp61-63. **W.P. Jones, et. al., "Non-Linear Beam Transport System for the LENS 7 MeV Proton Beam," this proceedings. ***D.L. Friesel, et. al., EPAC2000, pp. 539-541.

 
FPAE053 Isobar Suppression by Photodetachment in a Gas-Filled RF Quadrupole Ion Guide 3250
 
  • Y. Liu, J.R. Beene, C.C. Havener, J. F. Liang
    ORNL, Oak Ridge, Tennessee
  • A.C. Havener
    University of Tennessee, Knoxville, Tennessee
 
  Funding: Managed by UT-Battelle, LLC, for the U.S. DOE under contract DE-AC05-00OR22725. Co-author Aaron Havener was under a U.S. DOE Science Undergraduate Laboratory Internship.

A novel method is described for selective suppression of isobar contaminants in negative radioactive ion beams. Negative ion beams extracted from an ion source were decelerated to low energies and injected into a gas-filled radio-frequency quadrupole (RFQ) ion guide where the ions were cooled and unwanted ions were selectively removed by non-resonant photodetachment with photons of sufficient energy. Simulation studies show that the laser-ion interaction time in a 40 cm long RFQ ion guide can be on the order of milliseconds, thus, high efficiency photodetachment is possible with commercially available CW lasers. There are a number of adjacent-Z species whose negative ions are such that photodetachment can be used to suppress the unwanted negative ion species while leaving the species of interest intact. Examples of particular interest include suppressing the 56Co- component in a mixed 56Ni- + 56Co- beam and the 17O- component in a mixed 17O- + 17F- beam. In a proof–of-principle experiment a CW Nd:YAG laser at 1064 nm wavelength was used to selectively remove Co- ions in the (Ni, Co) pair. With laser power on the order of 3 W, 95% of Co- beams were suppressed while only 10% of Ni- beams were neutralized in a He-filled RFQ guide.

 
FPAE054 Front End Design of a Multi-GeV H-minus Linac 3286
 
  • P.N. Ostroumov, K.W. Shepard
    ANL, Argonne, Illinois
  • G.W. Foster, I.G. Gonin, G. Romanov
    Fermilab, Batavia, Illinois
 
  Funding: This work was supported by the U.S. Department of Energy under Contracts No. W-31-109-ENG-38 and DE-AC02-76CH03000.

The proposed 8-GeV driver at FNAL is based on ~480 independently phased SC resonators. Significant cost saving is expected by using an rf power fan out from high-power klystrons to multiple cavities. Successful development of superconducting (SC) multi-spoke resonators operating at ~345-350 MHz provides a strong basis for their application in the front end of multi-GeV linear accelerators. Such a front-end operating at 325 MHz would enable direct transition to high-gradient 1300 MHz SC TESLA-style cavities at ~400 MeV. The proposed front end consists of 5 sections: a conventional RFQ, room-temperature (RT) cross-bar H-type (CH) cavities, single-, double- and triple-spoke superconducting resonators. For several reasons which are discussed in this paper there is a large advantage in using independently phased RT CH-cavities between the RFQ and SC sections in the energy range 3-15 MeV.

 
FPAE055 Heavy-Ion Beam Dynamics in the RIA Post-Accelerator 3301
 
  • P.N. Ostroumov, V.N. Aseev
    ANL, Argonne, Illinois
  • A. Kolomiets
    ITEP, Moscow
 
  Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. W-31-109-ENG-38.

The RIB linac includes two strippers for the heaviest ions and three main sections: a room temperature injector up to an energy of ~100 keV/u, a superconducting (SC) linac for ions with charge-to-mass ratio 1/66 or more up to an energy of ~1 MeV and a higher energy SC linac to produce 10 MeV/u beams up to the mass of uranium. The RIA post-accelerator is a complex system designed for acceleration singly-charged ions before the stripper and includes many different accelerating and focusing structures operating both at room and cryogenic temperatures. Extensive accelerator design studies and end-to-end beam dynamics simulations have been performed to minimize the cost of the linac while providing high-quality and high-intensity radioactive beams. Specifically, we have found that cost-effective acceleration can be provided by several hybrid RFQs in the front end. The hybrid RFQs have been proposed and developed for acceleration of low-velocity heavy ions.* For the beam focusing in the second section it is appropriate to use electrostatic lenses and SC quadrupoles inside common cryostats with the resonators. The electrostatic lenses are most effective in the first cryostat of the SC linac.

*P.N. Ostroumov and A.A. Kolomiets. Proc. of the PAC-2001, Chicago, IL, June 18-22, 2001, p. 4077.

 
FPAE056 Review of a Spoke-Cavity Design Option for the RIA Driver Linac 3360
 
  • P.N. Ostroumov, K.W. Shepard
    ANL, Argonne, Illinois
  • J.R. Delayen
    Jefferson Lab, Newport News, Virginia
 
  Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. W-31-109-ENG-38.

A design option for the 1.4 GV, multiple-charge-state driver linac required for the U.S. Rare Isotope Accelerator Project based on 345 MHz, 3-cell spoke-loaded cavities has been previously discussed.* This paper updates consideration of design options for the RIA driver, including recent results from numerically-modeling the multi-charge-state beam dynamics and also cold test results for prototype superconducting niobium 3-cell spoke-loaded cavities.

*"High-energy ion linacs based on superconducting spoke cavities," K.W. Shepard, P.N. Ostroumov, and J.R. Delayen, Phys. Rev. ST Accel. Beams 6, 080101 (2003).

 
FPAE057 Beam Dynamics Studies and Beam Quality in the SNS Normal-Conducting Linac 3381
 
  • S. Henderson, A.V. Aleksandrov, D.A. Bartkoski, C. Chu, S.M. Cousineau, V.V. Danilov, G.W. Dodson, J. Galambos, D.-O. Jeon, M.A. Plum, M.P. Stockli
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos and Oak Ridge.

The Spallation Neutron Source accelerator systems will provide a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron production. The accelerator complex consists of an H- injector capable of producing 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. The linear accelerator consists of a Drift Tube Linac, a Coupled-Cavity Linac and a Superconducting Linac which provide 1.5 mA average current to the accumulator ring. The staged beam commissioning of the accelerator complex is proceeding as component installation progresses. Recently, the normal-conducting linear accelerator was beam commissioned. A number of beam dynamics and beam quality measurements will be reported, including the measurement of transverse emittances in the H- injector, and the evolution of halo and emittance along the linac.

 
FPAE058 Spallation Neutron Source Superconducting Linac Commissioning Algorithms 3423
 
  • S. Henderson, I.E. Campisi, J. Galambos, D.-O. Jeon, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos and Oak Ridge.

We describe the techniques which will be employed for establishing RF and quadrupole setpoints in the SNS superconducting linac. The longitudinal tuneup will be accomplished using phase-scan methods, as well as a technique that makes use of the beam induced field in the unpowered cavity.* The scheme for managing the RF and quadrupole setpoints to achieve a given energy profile will be described.

*L. Young, Proc. PAC 2001, p. 572.

 
FPAE059 Transverse Matching Techniques for the SNS Linac 3471
 
  • D.-O. Jeon, C. Chu, V.V. Danilov
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

It is crucial to minimize beam loss and machine activation by obtaining optimal transverse matching for a high-intensity linear accelerator such as the Spallation Neutron Source linac. For matching the Drift Tube Linac (DTL) to Coupled Cavity Linac (CCL), there are four wire-scanners installed in series in CCL module 1 as proposed by the author.* A series of measurements was conducted to minimize envelope breathing and the results are presented here. As an independent approach, Chu et al is developing an application based on another technique by estimating rms emittance using the wire scanner profile data.** For matching the Medium Energy Beam Transport Line to the DTL, a technique of minimizing rms emittance was used and emittance data show that tail is minimized as well.

*D. Jeon et al., "A technique to transversely match high intensity linac using only rms beam size from wire-scanners," Proceedings of LINAC2002 Conference, p. 88. **C. Chu et al., "Transverse beam matching application for SNS," in this conference proceedings.

 
FPAE061 Status of the Booster Injector for the Duke FEL Storage Ring 3544
 
  • S. Mikhailov, M.D. Busch, M. Emamian, J.F. Faircloth, S.M. Hartman, J. Li, V. Popov, G. Swift, V. Vylet, P.W. Wallace, P. Wang, Y.K. Wu
    DU/FEL, Durham, North Carolina
  • O. Anchugov, N. Gavrilov, G.Y. Kurkin, Yu. Matveev, D. Shvedov, N. Vinokurov
    BINP SB RAS, Protvino, Moscow Region
 
  Funding: This work is supported by U.S. DOE grant # DE-FG02-01ER41175 and by AFOSR MFEL grant # F49620-001-0370.

This paper presents the current status of the booster synchrotron for the Duke FEL storage ring. The booster will provide full energy injection into the storage ring in a wide energy range from 0.27 to 1.2 GeV. When operating the Duke FEL storage ring as the High Intensity Gamma Source (HIGS) to produce gamma photons above 20 MeV with Compton scattering, continuous electron loss occurs. The top-off mode operation of the booster injector will enable the continuous operation of the HIGS facility by replenishing the lost electrons. The design requirement for a compact booster with the single bunch extraction capability remains a challenge for the machine development. Presently, the booster project is in the installation phase. The magnetic elements, vacuum chambers, injection and extraction kickers have been fabricated in the Budker Institute of Nuclear Physics, Russia. The diagnostic and control system is being developed in the FEL lab, Duke University. The commissioning of the booster synchrotron is planned for fall 2005.

 
FPAE062 Beam Parameters of a Two-Sectional Electron Linac with the Injector Based on a Resonance System with Evanescent Oscillations 3567
 
  • V.V. Mytrochenko, M.I. Ayzatskiy, V.N. Boriskin, A. Dovbnya, I.V. Khodak, V.A. Kushnir, A. Opanasenko, S.A. Perezhogin, A.N. Savchenko, D.L. Stepin, V.I. Tatanov, Z.V. Zhiglo
    NSC/KIPT, Kharkov
 
  The S-band electron linac has been designed at NSC KIPT to cover an energy range from 30 to about of 100 MeV. The linac consists of a couple of the four-meter long piecewise homogeneous accelerating sections. Each section is supplied with RF power from a separate klystron. The peculiarity of the linac is using of the injector based on evanescent oscillations. The report presents both simulation results of self-consistent particle dynamics in the linac and results of measurement of beam parameters.  
FPAE063 Enhancements of Machine Reliability and Beam Quality in SPring-8 Linac for Top-Up Injection into Two Storage Rings 3585
 
  • H. Hanaki, T. Asaka, H. Dewa, T. Kobayashi, A. Mizuno, S. Suzuki, T. Taniuchi, H. Tomizawa, K. Yanagida
    JASRI/SPring-8, Hyogo
 
  SPring-8 has started its top-up operation from May 2004 in order to feed constant photon fluxes to users. The SPring-8 linac has been improved to realize stable and uninterrupted top-up injection into the SPring-8 storage ring and the NewSUBARU storage ring. The beam energy instability of 0.01% rms had been achieved by the following stabilization: RF amplitude and phase stabilization, synchronization of beam timing and linac's 2856 MHz RF and introduction of an energy compensation system (ECS). Feedback controls of steering magnets compensate long-term variation of beam trajectories at ends of beam transport lines. The presentation will include also recent improvements.