Keyword: linac
Paper Title Other Keywords Page
WEAO01 Recent Developments with the GTS-LHC ECR Ion Source at CERN ion, ion-source, operation, ECR 50
 
  • V. Toivanen, G. Bellodi, C. Fichera, D. Küchler, A.M. Lombardi, M. Maintrot, A.I. Michet, M. O'Neil, S. Sadovich, F.J.C. Wenander
    CERN, Geneva, Switzerland
  • O.A. Tarvainen
    JYFL, Jyväskylä, Finland
 
  Linac3 is the first link in the chain of accelerators providing highly charged heavy ion beams for the CERN experimental program. The beams, predominantly lead, are produced with the GTS-LHC 14.5 GHz Electron Cyclotron Resonance (ECR) ion source, operated in afterglow mode. In the framework of the LHC Injector Upgrade program (LIU), several activities have been carried out to improve the GTS-LHC and Linac3 performance, in terms of delivered beam current. The extraction region of the GTS-LHC has been upgraded with redesigned apertures and the addition of an einzel lens, yielding improved Linac3 output. Also, a series of measurements has been performed to study the effects of two-frequency heating on the performance of the GTS-LHC. A Traveling Wave Tube Amplifier (TWTA) with variable frequency and pulse pattern was utilized as a secondary microwave source. The two-frequency effect commonly reported with CW operation of ECR ion sources boosting high charge state ion production was also observed in afterglow mode. Lastly, for studies of metal ion beam production, a dedicated test stand has been assembled to characterize the GTS-LHC resistively heated miniature oven performance.  
slides icon Slides WEAO01 [9.832 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ECRIS2016-WEAO01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPP03 Never Run Your ECR Ion Source with Argon in Afterglow for 6 Months! ion, operation, plasma, extraction 89
 
  • D. Küchler, A.I. Michet, J.A.F. Somoza, V. Toivanen
    CERN, Geneva, Switzerland
 
  The fixed target experiment NA61 in the North Area of the SPS at CERN studies phase transitions in strongly interacting matter using the primary beams available from the CERN accelerator complex (protons and lead ions). In order to explore a wider range of energies and densities a primary argon beam was requested for the physics run in 2015. The GTS-LHC ECR ion source was running for many months during 2013 and 2014 to study the source behaviour and to setup the accelerator chain with argon ions. This paper reports the long term effects of the argon operation on the GTS-LHC ion source and the Low Energy Beam Transport (LEBT). Heavy sputtering inside the source caused a degradation of the plasma chamber and metal coating of insulators inside the beam extraction system. Iron ions could be found in the extracted beam. Also the pumping performance of ion getter pumps in the LEBT degraded significantly. Additional preventive maintenance was necessary to be able to run for long periods without risking serious damage to the ion source.  
poster icon Poster WEPP03 [28.231 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ECRIS2016-WEPP03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)