Author: Goddard, B.
Paper Title Page
MOOBA02 Status and Future Perspectives of the HIE-ISOLDE Project at CERN 34
 
  • Y. Kadi, A.P. Bernardes, Y. Blumenfeld, S. Calatroni, R. Catherall, M.A. Fraser, B. Goddard, D. Parchet, E. Siesling, W. Venturini Delsolaro, D. Voulot, L.R. Williams
    CERN, Geneva, Switzerland
 
  The High Intensity and Energy (HIE)-ISOLDE project aims at several important upgrades of the present ISOLDE radioactive beam facility at CERN. The main focus lies in the energy upgrade of the post-accelerated radionuclide beams from 3 MeV/u up to 10 MeV/u through the addition of superconducting cavities. This will open the possibility of many new types of experiments including transfer reactions throughout the nuclear chart. The first stage of this upgrade involves the design, construction, installation and commissioning of two high-β cryomodules downstream of REX-ISOLDE, the existing post-accelerator. Each cryomodule houses five high-β sc cavities and one sc solenoid. Prototypes of the Nb-sputtered Quarter Wave Resonators (QWRs) cavities for the new superconducting linear accelerator have been manufactured and are undergoing RF cold tests. The project also includes a design study of improved production targets to accommodate the future increase of proton intensity delivered by the new LINAC4 proton driver. The project has been approved by CERN and its implementation started in January 2010. An overview of the project and the timeline will be presented.  
slides icon Slides MOOBA02 [7.044 MB]  
 
MOPPC004 Experiments on the Margin of Beam Induced Quenches for LHC Superconducting Quadrupole Magnet in the LHC 124
 
  • C. Bracco, W. Bartmann, M. Bednarek, B. Goddard, E.B. Holzer, A. Nordt, M. Sapinski, R. Schmidt, M. Solfaroli Camillocci, M. Zerlauth, E.N. del Busto
    CERN, Geneva, Switzerland
 
  Protection of LHC equipment relies on a complex system of collimators to capture injected or circulating beam in case of LHC injection kicker magnet failures. However, for specific failures of the injection kicker, the beam can graze the injection protection collimators and induce quenches of downstream superconducting magnets. This occurred twice during 2011 operation and can also not be excluded during further operation. Tests were performed during Machine Development periods of the LHC to assess the quench margin of the quadrupole located just downstream of the last injection protection collimator in point 8. In addition to the existing Quench Protection System, a special monitoring instrumentation was installed at this magnet to detect any resistance increase below the quench limit. The correlation between the magnet and Beam Loss Monitor signals was analysed for different beam intensities and magnet current. The results of the experiments are presented in this paper.  
 
MOPPD057 CERN PSB-to-PS Transfer Modifications for the 2 GeV Upgrade 493
 
  • W. Bartmann, J. Borburgh, S.S. Gilardoni, B. Goddard, A. Newborough, S. Pittet, R. Steerenberg
    CERN, Geneva, Switzerland
  • C.H. Yu
    IHEP, Beijing, People's Republic of China
 
  Within the frame of the CERN PS Booster (PSB) energy upgrade from 1.4 to 2 GeV, the PSB to PS transfer line will be adapted for pulse-to-pulse modulated operation. A modified lattice is presented including a re-design of the switching dipole between ISOLDE and PS and additional collimators to protect the PS injection septum. Optics solutions optimized for small emittance LHC beams as well as for the large emittance high-intensity beams are shown.  
 
MOPPD058 LHC Abort Gap Cleaning Studies during Luminosity Operation 496
 
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
  • W. Bartmann, A. Boccardi, C. Bracco, E. Bravin, B. Goddard, W. Höfle, D. Jacquet, A. Jeff, V. Kain, M. Meddahi, F. Roncarolo, J.A. Uythoven, D. Valuch
    CERN, Geneva, Switzerland
 
  The presence of significant intensities of un-bunched beam is a potentially serious issue in the LHC. Procedures using damper kickers for cleaning both Abort Gap (AG) and buckets targeted for injection, are currently in operation at flat bottom. Recent observations of relatively high population of the AG during physics runs brought up the need for AG cleaning during luminosity operation as well. In this paper the results of experimental studies performed in October 2011 are presented.  
 
MOPPD059 Proposal of a Dummy Septum to Mitigate Ring Irradiation for the CERN PS Multi-Turn Extraction 499
 
  • M. Giovannozzi, H. Bartosik, D. Bodart, J. Borburgh, R.J. Brown, S. Damjanovic, S.S. Gilardoni, B. Goddard, C. Hernalsteens, M. Hourican, M. Widorski
    CERN, Geneva, Switzerland
 
  High activation of the magnetic extraction septum of the CERN PS machine was observed due to the losses of the continuous beam extracted via the Multi-Turn Extraction (MTE) method. The resulting activation is however incompatible with safe operation so a mitigation measure was required and found, namely the installation of a passive dummy septum to protect the actual one seems to provide the required reduction in activation in the extraction area. The shielded dummy septum is intended to absorb particles during the rise time of the MTE extraction kickers, avoiding the beam impact on the blade of the active magnetic extraction septum. The principle of the proposed modifications of the PS layout will be presented together with the studies aimed at finalising the new configuration.  
 
MOPPD081 Upgrade of the LHC Beam Dumping Protection Elements 556
 
  • W.J.M. Weterings, T. Antonakakis, B. Balhan, J. Borburgh, B. Goddard, C. Maglioni, R. Versaci
    CERN, Geneva, Switzerland
 
  The Beam Dumping System for the Large Hadron Collider comprises for each ring a set of horizontally deflecting extraction kicker magnets, vertically deflecting steel septa, dilution kickers and finally, a couple of hundred meters further downstream, an absorber block. A mobile diluter (TCDQ) protects the superconducting quadrupole immediately downstream of the extraction as well as the arc at injection energy and the triplet aperture at top energy from bunches with small impact parameters, in case of a beam dump that is not synchronized with the particle free gap or a spontaneous firing of the extraction kickers. Simulations have shown that an asynchronous dump of a 7 TeV nominal beam into the TCDQ absorber blocks could damage it. This paper describes the proposed changes to this device in order to maintain the protection for the downstream elements while reducing the risk of damaging the TCDQ in case of such a beam loss.  
 
TUXA02 Upgrade Plans for the LHC Injector Complex 1010
 
  • R. Garoby, H. Damerau, S.S. Gilardoni, B. Goddard, K. Hanke, A.M. Lombardi, M. Meddahi, B. Mikulec, E.N. Shaposhnikova, M. Vretenar
    CERN, Geneva, Switzerland
 
  Challenging beams with much higher brightness than today are required for the LHC to achieve its high luminosity objective after the year 2020. It is the purpose of the LHC Injectors Upgrade (LIU) Project to achieve this result, consolidating and upgrading the existing set of ageing synchrotrons (PSB, PS and SPS), and using the new linac presently in construction (Linac4). The anticipated beam characteristics are described and compared to the known limitations in the different accelerators. The foreseen solutions are outlined as well as the planning for their implementation.  
slides icon Slides TUXA02 [72.367 MB]  
 
TUPPR068 The Achromatic Telescopic Squeezing Scheme: Basic Principles and First Demonstration at the LHC 1978
 
  • S.D. Fartoukh, R. De Maria, B. Goddard, W. Höfle, M. Lamont, G.J. Müller, L. Ponce, S. Redaelli, R.J. Steinhagen, M. Strzelczyk, R. Tomás, G. Vanbavinckhove, J. Wenninger
    CERN, Geneva, Switzerland
  • R. Miyamoto
    ESS, Lund, Sweden
 
  The Achromatic Telescopic Squeezing (ATS) scheme [1] is a novel squeezing mechanism enabling the production of very low β* in circular colliders. The basic principles of the ATS scheme will be reviewed together with its strong justification for the High-Luminosity LHC Project. In this context, a few dedicated beam experiments were meticulously prepared and took place at the LHC in 2011. The results obtained will be highlighted, demonstrating already the potential of the ATS scheme for any upgrade project relying on a strong reduction of β*.
[1] S. Fartoukh, "An Achromatic Telescopic Squeezing (ATS) Scheme For The LHC Upgrade," IPAC'11, WEPC037, p. 2088 (2001).
 
 
TUPPR090 Analysis of Ferrite Heating of the LHC Injection Kickers and Proposals for Future Reduction of Temperature 2038
 
  • M.J. Barnes, L. Ducimetière, N. Garrel, B. Goddard, V. Mertens, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The two LHC injection kicker magnet (MKI) systems produce a kick of 1.3 T-m with a flattop duration variable up to 7860 ns, and rise and fall times of less than 900 ns and 3000 ns, respectively. A beam screen, consisting of a ceramic tube with conductors on the inner wall, is placed in the aperture of the magnets. The conductors provide a path for the image current of the, high intensity, LHC beam and screen the ferrite against wake fields. The conductors initially used gave adequately low beam coupling impedance however inter-conductor discharges occurred during pulsing of the magnet; hence an alternative design was implemented to meet the often conflicting requirements for low beam coupling impedance, fast magnetic field rise-time and good high voltage behaviour. During 2011 the LHC has been operated with high intensity beam, coasting for many hours at a time, resulting in heating of both the ferrite yoke and beam impedance reduction ferrites, of the MKIs. This paper presents an analysis of thermal measurement data and an extrapolation of the heating for future operation; in addition means are discussed for reducing ferrite heating and improving cooling.  
 
TUPPR091 Status of the 160 MeV H Injection into the CERN PSB 2041
 
  • W.J.M. Weterings, B. Balhan, E. Benedetto, J. Borburgh, C. Bracco, C. Carli, B. Goddard, K. Hanke, B. Mikulec, A. Newborough, R. Noulibos, J. Tan
    CERN, Geneva, Switzerland
 
  The 160 MeV H beam from the LINAC4 will be injected into the 4 superimposed rings of the PS Booster (PSB) with an new H charge-exchange injection system. This entails a massive upgrade of the injection region. The hardware requirements and constraints, the performance specifications and the design of the H injection region are described.  
 
TUPPR092 Transient Beam Losses in the LHC Injection Kickers from Micron Scale Dust Particles 2044
 
  • B. Goddard, P. Adraktas, T. Baer, M.J. Barnes, F. Cerutti, A. Ferrari, N. Garrel, A.H.J. Gerardin, M. Guinchard, A. Lechner, A. Masi, V. Mertens, R. Morón Ballester, S. Redaelli, J.A. Uythoven, V. Vlachoudis, F. Zimmermann
    CERN, Geneva, Switzerland
 
  Transient beam losses on a time scale of a few ms have been observed in the LHC injection kickers, occurring mainly shortly after beam injection with a strong correlation in time to the kicker pulsing. The beam losses, which have at times affected LHC availability, are attributed to micron scale ceramic dust particles detached from the alumina beam pipe and accelerated into the beam. The beam related observations are described, together with laboratory measurements of beam pipe contamination and kicker vibration, simulations of electric field in the beam pipe and the basic dynamic model. Energy deposition simulations modelling the beam losses are presented and compared to measurement. Extrapolations to future LHC operation at higher intensities and energies are made, and prospects for mitigation are discussed.  
 
TUPPR093 Sources and Solutions for LHC Transfer Line Stability Issues 2047
 
  • L.N. Drosdal, W. Bartmann, C. Bracco, B. Goddard, V. Kain, G. Le Godec, M. Meddahi, J.A. Uythoven
    CERN, Geneva, Switzerland
 
  The LHC is filled through two 3km transfer lines from the last pre-injector, the SPS. Safe injection into the LHC requires stable trajectories in the transfer lines. During the LHC proton operations 2011 instabilities were observed. In particular shot-by-shot and bunch-by-bunch variations cause difficulties for steering of the beam and can potentially cause high beam losses at injection. The causes of these instabilities have been studied and will be presented in this paper. Based on the studies solutions will be proposed and finally the effects of the solutions will be studied.  
 
TUPPR094 SPS Transverse Beam Scraping and LHC Injection Losses 2050
 
  • L.N. Drosdal, W. Bartmann, C. Bracco, K. Cornelis, B. Goddard, V. Kain, M. Meddahi, E. Veyrunes
    CERN, Geneva, Switzerland
 
  Machine protection sets strict requirements for the quality of the injected beam, in particular in the transverse plane. Losses at aperture restrictions and protection elements have to be kept at a minimum. Particles in the beam tails are lost at the tight transfer line collimators and can trigger the LHC beam abort system. These particles have to be removed by scrapers in the vertical and horizontal plane in the SPS. Scraping has become vital for high intensity LHC operation. This paper shows the dependence of injection quality on the SPS scraping and discusses an improved scraper setting up strategy for better reproducibility with the current scraper system.  
 
TUPPR096 Angular Alignment of the LHC Injection Protection Stopper 2056
 
  • C. Bracco, R.W. Assmann, W. Bartmann, B. Goddard, V. Kain, J.A. Uythoven
    CERN, Geneva, Switzerland
 
  Machine safety depends critically on the correct setup of the protection elements. One of the injection protection collimators is constituted by exceptionally long jaws (4 m). For this element, an angular offset of the jaws could affect significantly the measured beam size and, as a consequence, the correct setup with respect to the beam. Dedicated studies and cross-calibrations have been performed to quantify the effect of tilts and offsets on the setup of this collimator and to check the provided passive protection.  
 
WEPPR065 Electromagnetic Simulations of the Impedance of the LHC Injection Protection Collimator 3075
 
  • B. Salvant, V. Baglin, B. Goddard, A. Grudiev, E. Métral, M.A. Timmins
    CERN, Geneva, Switzerland
 
  During the 2011 LHC run, significant vacuum and temperature increase were observed at the location of the LHC injection protection collimators (TDI) during the physics fills. Besides, measurements of the LHC transverse tune shift while changing the TDI gap showed that the impedance of the TDI was significantly higher than the LHC impedance model prediction based on multilayer infinite length theory. This contribution details the electromagnetic simulations performed with a full 3D model of the TDI to obtain both longitudinal and transverse impedances and their comparison with measured observables.  
 
THPPP050 HIE-ISOLDE SC Linac: Operational Aspects and Commissioning Preparation 3853
 
  • D. Voulot, E. Bravin, M.A. Fraser, B. Goddard, Y. Kadi, D. Lanaia, A.S. Parfenova, M. Pasini, A.G. Sosa, F. Zocca
    CERN, Geneva, Switzerland
 
  In the framework of the HIE-ISOLDE project, the REX linac will be upgraded in stages to 5.5 MeV/u and 10 MeV/u using superconducting (SC) quarter-wave cavities. The linac lattice is now frozen and the beam dynamics has been checked. The beam properties at the output of the NC linac for the different stages have been measured and are compatible with the SC linac acceptance. The high-energy beam transfer design is being finalised and a study has been launched for a buncher/chopper system allowing 100 ns bunch spacing for time-of-flight measurements. A compact diagnostic box for the inter-cryomodule region is under development and a new Si-detector based monitor for energy and phase measurements has been tested.  
 
THPPP086 UFOs in the LHC: Observations, Studies and Extrapolations 3936
 
  • T. Baer, M.J. Barnes, F. Cerutti, A. Ferrari, N. Garrel, B. Goddard, E.B. Holzer, S. Jackson, A. Lechner, V. Mertens, M. Misiowiec, E. Nebot Del Busto, A. Nordt, J.A. Uythoven, V. Vlachoudis, J. Wenninger, C. Zamantzas, F. Zimmermann
    CERN, Geneva, Switzerland
  • T. Baer
    University of Hamburg, Hamburg, Germany
  • N. Fuster Martinez
    Valencia University, Atomic Molecular and Nuclear Physics Department, Valencia, Spain
 
  Unidentified falling objects (UFOs) are potentially a major luminosity limitation for nominal LHC operation. They are presumably micrometer sized dust particles which lead to fast beam losses when they interact with the beam. With large-scale increases and optimizations of the beam loss monitor (BLM) thresholds, their impact on LHC availability was mitigated from mid 2011 onwards. For higher beam energy and lower magnet quench limits, the problem is expected to be considerably worse, though. In 2011/12, the diagnostics for UFO events were significantly improved: dedicated experiments and measurements in the LHC and in the laboratory were made and complemented by FLUKA simulations and theoretical studies. The state of knowledge, extrapolations for nominal LHC operation and mitigation strategies are presented.  
 
THPPR040 First Operational Experience with the LHC Machine Protection System when Operating with Beam Energies Beyond the 100 MJ Range 4062
 
  • M. Zerlauth, R.W. Assmann, B. Dehning, M. Ferro-Luzzi, B. Goddard, M. Lamont, R. Schmidt, A.P. Siemko, J.A. Uythoven, J. Wenninger
    CERN, Geneva, Switzerland
 
  The LHC made a remarkable progress in luminosity production during 2011 operation. This was made possible by a progressive increase of beam intensities by more than 5 orders of magnitude, reaching stored beam energies beyond 100MJ at the end of the year. The correct functioning of the machine protection systems was vital during initial operation and even more when approaching nominal beam parameters, where an uncontrolled loss of a small fraction of the beam is already sufficient to damage accelerator equipment or the large experimental detectors The machine protection system depends on the interplay of many different elements: beam dumping system, beam interlocks, beam instrumentation, equipment monitoring, collimators and absorbers, etc. The strategy applied during 2011 to allow for an efficient but yet safe increase of the beam intensities is presented along with the associated risks and drawbacks of a too aggressive approach. The experience gained with the key systems will be discussed along with possibilities to further enhance machine availability whilst maintaining the current level of safety.