Author: Assmann, R.W.     [Aßmann, R.W.]
Paper Title Page
MOODB202 Simulations and Measurements of Cleaning with 100 MJ Beams in the LHC 52
 
  • R. Bruce, R.W. Aßmann, V. Boccone, C. Bracco, M. Cauchi, F. Cerutti, D. Deboy, A. Ferrari, L. Lari, A. Marsili, A. Mereghetti, E. Quaranta, S. Redaelli, G. Robert-Demolaize, A. Rossi, B. Salvachua, E. Skordis, G. Valentino, V. Vlachoudis, Th. Weiler, D. Wollmann
    CERN, Geneva, Switzerland
  • L. Lari
    IFIC, Valencia, Spain
  • E. Quaranta
    Politecnico/Milano, Milano, Italy
  • G. Valentino
    University of Malta, Information and Communication Technology, Msida, Malta
 
  The CERN Large Hadron Collider is routinely storing proton beam intensities of more than 100 MJ, which puts extraordinary demands on the control of beam losses to avoid quenches of the superconducting magnets. Therefore, a detailed understanding of the LHC beam cleaning is required. We present tracking and shower simulations of the LHC's multi-stage collimation system and compare with measured beam losses, which allow us to conclude on the predictive power of the simulations.  
slides icon Slides MOODB202 [6.343 MB]  
 
MOPWO029 Remote Estimate of Collimator Jaw Damages with Sound Measurements during Beam Impacts 951
 
  • D. Deboy, O. Aberle, R.W. Aßmann, F. Carra, M. Cauchi, J. Lendaro, A. Masi, S. Redaelli
    CERN, Geneva, Switzerland
 
  Irregular hits of high-intensity LHC beams on collimators can lead to severe damage of the collimator jaws. The identification of damaged collimator jaws by observation of beam measurements is challenging: online loss measurements at the moment of the impacts can be tricky and degradation of the overall performance from single collimator damage can be difficult to measure. Visual inspections are excluded because collimator jaws are enclosed in vacuum tanks without windows. However, the sound generated during the beam impact can be used to give an estimate of the damage level. In 2012, high-intensity beam comparable to a full nominal LHC bunch at 7 TeV was shot on a tertiary type LHC collimator at the HiRadMat test facility at CERN. The paper presents results from sound recordings of this experiment.  
 
MOPWO031 High Energy Beam Impact Tests on a LHC Tertiary Collimator at CERN HiRadMat Facility 954
 
  • M. Cauchi, O. Aberle, R.W. Aßmann, A. Bertarelli, F. Carra, A. Dallocchio, D. Deboy, L. Lari, S. Redaelli, A. Rossi
    CERN, Geneva, Switzerland
  • M. Cauchi, P. Mollicone
    UoM, Msida, Malta
  • L. Lari
    IFIC, Valencia, Spain
  • N.J. Sammut
    University of Malta, Information and Communication Technology, Msida, Malta
 
  The correct functioning of the collimation system is crucial to safely operate the LHC. The requirements to handle high intensity beams can be demanding. In this respect, investigating the consequences of LHC particle beams hitting tertiary collimators (TCTs) in the experimental regions is a fundamental issue for machine protection. An experimental test was designed to investigate the robustness and effects of beam accidents on a fully assembled collimator, based on accident scenarios in the LHC. This experiment, carried out at the CERN HiRadMat (High Irradiation to Materials) facility, involved 440 GeV beam impacts of different intensities on the jaws of a horizontal TCT. This paper presents the experimental setup and the preliminary results obtained together with some first outcomes from visual inspection.  
 
MOPWO048 Cleaning Performance of the LHC Collimation System up to 4 TeV 1002
 
  • B. Salvachua, R.W. Aßmann, R. Bruce, M. Cauchi, D. Deboy, L. Lari, A. Marsili, D. Mirarchi, E. Quaranta, S. Redaelli, A. Rossi, G. Valentino
    CERN, Geneva, Switzerland
  • M. Cauchi
    UoM, Msida, Malta
  • L. Lari
    IFIC, Valencia, Spain
  • D. Mirarchi
    The Imperial College of Science, Technology and Medicine, London, United Kingdom
  • G. Valentino
    University of Malta, Information and Communication Technology, Msida, Malta
 
  Funding: Research supported by EU FP7 HiLumi LHC (Grant agreement 284404)
In this paper we review the performance of the LHC collimation system during 2012 and compare it with previous years. During 2012, the so-called tight settings were deployed for a better cleaning and improved beta-star reach. As a result, a record cleaning efficiency below a few 0.0001 was achieved in the cold regions where the highest beam losses occur. The cleaning in other cold locations is typically a factor of 10 better. No quenches were observed during regular operation with up to 140 MJ stored beam energy. The system stability during the year, monitored regularly to ensure the system functionality for all machine configurations, and the performance of the alignment tools are also reviewed.
 
 
MOPWO049 Lifetime Analysis at High Intensity Colliders Applied to the LHC 1005
 
  • B. Salvachua, R.W. Aßmann, R. Bruce, F. Burkart, S. Redaelli, G. Valentino, D. Wollmann
    CERN, Geneva, Switzerland
  • G. Valentino
    University of Malta, Information and Communication Technology, Msida, Malta
 
  The beam lifetime is one of the main parameters to define the performance of a collider. In a super-conducting machine like the LHC, the lifetime determines the intensity reach for a given collimation cleaning. The beam lifetime can be calculated from the direct measurement of beam current. However, due to the noise in the beam current signal only an average lifetime over several seconds can be calculated. We propose here an alternative method, which uses the signal of the beam loss monitors in the vicinity of the primary collimators to get the instantaneous beam lifetime at the collimators. In this paper we compare the lifetime from the two methods and investigate the minimum lifetime over the LHC cycle for all the physics fills in 2011 and 2012. These data provide a reference for estimates of performance reach from collimator cleaning.  
 
TUPFI030 LHC Machine Developments in 2011-12 1406
 
  • G. Papotti, R.W. Aßmann, F. Zimmermann
    CERN, Geneva, Switzerland
 
  In 2011 and 2012 LHC machine development (MD) sessions were performed during dedicated slots of beam time. These MD studies were scheduled and planned well in advance. Study topics reflected the previously agreed priorities, such as further optimizing machine performance, exploring beam parameters beyond design targets, assessing machine limitations, testing new concepts and machine settings, preparing future LHC running in view of the 2013/14 LHC shutdown and the re-commissioning of the LHC at nominal beam energy in 2014/15. We describe the planning, preparation, execution, review, and documentation of these LHC beam studies and highlight some key results.  
 
TUPME031 Considerations for a Higgs Facility Based on Laser Wakefield Acceleration 1643
 
  • S. Hillenbrand, A.-S. Müller
    KIT, Karlsruhe, Germany
  • R.W. Aßmann, S. Hillenbrand, D. Schulte
    CERN, Geneva, Switzerland
 
  Laser Wakefield Accelerators have seen tremendous progress over the last decades. It is hoped that they will allow to significantly reduce the size and cost of a future liner collider. Based on scaling laws, laser-driven plasma accelerators are investigated as drivers for smaller scale facilities capable of producing Z and Higgs bosons.  
 
TUPME032 Update on Beam Induced RF Heating in the LHC 1646
 
  • B. Salvant, O. Aberle, G. Arduini, R.W. Aßmann, V. Baglin, M.J. Barnes, W. Bartmann, P. Baudrenghien, O.E. Berrig, A. Bertarelli, C. Bracco, E. Bravin, G. Bregliozzi, R. Bruce, F. Carra, F. Caspers, G. Cattenoz, S.D. Claudet, H.A. Day, M. Deile, J.F. Esteban Müller, P. Fassnacht, M. Garlaschè, L. Gentini, B. Goddard, A. Grudiev, B. Henrist, S. Jakobsen, O.R. Jones, O. Kononenko, G. Lanza, L. Lari, T. Mastoridis, V. Mertens, N. Mounet, E. Métral, A.A. Nosych, J.L. Nougaret, S. Persichelli, A.M. Piguiet, S. Redaelli, F. Roncarolo, G. Rumolo, B. Salvachua, M. Sapinski, R. Schmidt, E.N. Shaposhnikova, L.J. Tavian, M.A. Timmins, J.A. Uythoven, A. Vidal, J. Wenninger, D. Wollmann, M. Zerlauth
    CERN, Geneva, Switzerland
  • H.A. Day
    UMAN, Manchester, United Kingdom
  • L. Lari
    IFIC, Valencia, Spain
 
  Since June 2011, the rapid increase of the luminosity performance of the LHC has come at the expense of increased temperature and pressure readings on specific near-beam LHC equipment. In some cases, this beam induced heating has caused delays whilie equipment cools down, beam dumps and even degradation of these devices. This contribution gathers the observations of beam induced heating attributable to beam coupling impedance, their current level of understanding and possible actions that are planned to be implemented during the long shutdown in 2013-2014.  
 
TUPWA042 Lessons Learned and Mitigation Measures for the CERN LHC Equipment with RF Fingers 1802
 
  • E. Métral, O. Aberle, R.W. Aßmann, V. Baglin, M.J. Barnes, O.E. Berrig, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Carra, F. Caspers, H.A. Day, M. Ferro-Luzzi, M.A. Gallilee, C. Garion, M. Garlaschè, A. Grudiev, J.M. Jimenez, O.R. Jones, O. Kononenko, R. Losito, J.L. Nougaret, V. Parma, S. Redaelli, B. Salvant, P.M. Strubin, R. Veness, C. Vollinger, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  Beam-induced RF heating has been observed in several LHC components when the bunch/beam intensity was increased and/or the bunch length reduced. In particular eight bellows, out of the ten double-bellows modules present in the machine in 2011, were found with the spring, which should keep the RF fingers in good electrical contact with the central insert, broken. Following these observations, the designs of all the components of the LHC equipped with RF fingers have been reviewed. The lessons learnt and mitigation measures are presented in this paper.  
 
WEPEA012 Study of Laser Wakefield Accelerators as Injectors for Synchrotron Light Sources 2519
 
  • S. Hillenbrand, V. Judin, A.-S. Müller
    KIT, Karlsruhe, Germany
  • R.W. Aßmann, S. Hillenbrand
    CERN, Geneva, Switzerland
  • O. Jansen, A.M. Pukhov
    HHUD, Dusseldorf, Germany
 
  Short bunch lengths, high beam energies, and small facility footprint make Laser Wakefield Accelerators (LWFA) very interesting as injectors for Synchrotron Light Sources. In this paper, we describe exemplary investigations for the ANKA storage ring.  
 
THPFI046 First Results of an Experiment on Advanced Collimator Materials at CERN HiRadMat Facility 3391
 
  • A. Bertarelli, O. Aberle, R.W. Aßmann, E. Berthomé, V. Boccone, M. Calderón Cueva, F. Carra, F. Cerutti, N. Charitonidis, C. Charrondière, A. Dallocchio, M. Donzé, P. Francon, M. Garlaschè, L. Gentini, M. Guinchard, N. Mariani, A. Masi, P. Moyret, S. Redaelli, A. Rossi, S.D.M. dos Santos
    CERN, Geneva, Switzerland
  • M. Calderón Cueva
    Universidad San Francisco de Quito, Cumbayá, Colombia
  • N. Charitonidis
    EPFL, Lausanne, Switzerland
  • L. Peroni, M. Scapin
    Politecnico di Torino, Torino, Italy
 
  Funding: The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures project EuCARD, grant agreement no. 227579
A comprehensive, first-of-its-kind experiment (HRMT-14) has been recently carried out at CERN HiRadMat facility on six different materials of interest for Beam Intercepting Devices (collimators, targets, dumps). Both traditional materials (Mo, W and Cu alloys) as well as advanced metal/diamond and metal/graphite composites were tested under extreme conditions as to pressure, density and temperature, leading to the development of highly dynamic phenomena as shock-waves, spallation, explosions. Experimental data were acquired, mostly in real time, relying on extensive embarked instrumentation (strain gauges, temperature and vacuum sensors) and on remote acquisition devices (laser Doppler vibrometer and high speed camera). The experiment was a success under all points of view in spite of the technological challenges and harsh environment. First measurements are in good agreement with results of complex simulations, confirming the effectiveness of the acquisition system and the reliability of advanced numerical methods when material constitutive models are completely available. Interesting information has been collected as to thermal shock robustness of tested materials.
 
 
THPFI054 Preliminary Comparison of the Response of LHC Tertiary Collimators to Proton and Ion Beam Impacts 3412
 
  • M. Cauchi, R.W. Aßmann, A. Bertarelli, F. Carra, F. Cerutti, L. Lari
    CERN, Geneva, Switzerland
  • M. Cauchi, P. Mollicone
    UoM, Msida, Malta
  • L. Lari
    IFIC, Valencia, Spain
  • N.J. Sammut
    University of Malta, Information and Communication Technology, Msida, Malta
 
  The CERN Large Hadron Collider is designed to bring into collision protons as well as heavy ions. Accidents involving impacts on collimators can happen for both species. The interaction of lead ions with matter differs to that of protons, thus making this scenario a new interesting case to study as it can result in different damage aspects on the collimator. This paper will present a preliminary comparison of the response of collimators to proton and ion beam impacts.  
 
MOPWO039 Experience with High-intensity Beam Scraping and Tail Populations at the Large Hadon Collider 978
 
  • S. Redaelli, R. Bruce, F. Burkart, D. Mirarchi, B. Salvachua, G. Valentino, D. Wollmann
    CERN, Geneva, Switzerland
  • R.W. Aßmann
    DESY, Hamburg, Germany
  • G. Valentino
    University of Malta, Information and Communication Technology, Msida, Malta
 
  The population of beam tails at the LHC is source of concern because even small fractions of the total beam intensity could represent a potential danger is case of slow or fast losses, e.g. caused by orbit transients or by collimator movements. Different studies have been performed using the technique of collimator scans to probe the beam tail population, for different beam energies and beam intensities. The experience accumulated during the operation at 3.5 TeV and 4 TeV is reviewed and extrapolations to higher energies are considered.  
 
WEPWA009 RF Bunch Compression Studies for FLUTE 2144
 
  • M. Schuh, E. Huttel, S. Marsching, A.-S. Müller, S. Naknaimueang, M.J. Nasse, R. Rossmanith, R. Ruprecht, M. Schreck, M. Schwarz, M. Weber, P. Wesolowski
    KIT, Karlsruhe, Germany
  • R.W. Aßmann, K. Flöttmann, H. Schlarb
    DESY, Hamburg, Germany
 
  FLUTE is a planned 40 to 50 MeV accelerator test facility consisting, in the first phase, of an electron gun with an output energy of about 7 MeV, a traveling wave linac and a magnet chicane bunch compressor. The machine will serve as a source of intense THz radiation using coherent synchrotron radiation (CSR), coherent transition radiation (CTR), and coherent edge radiation (CER) as generation mechanisms. It is planned to operate the machine in the charge regime from a few pC up to several nC in order to study bunch compression schemes as well as the THz radiation generation. In this contribution the effect of velocity bunching by using a dedicated buncher cavity at low energy and operating the linac off-crest is studied in order to deliver RMS bunch lengths in the femtosecond range at low charge.  
 
WEPWA010 FLUTE: A Versatile Linac-based THz Source Generating Ultra-short Pulses 2147
 
  • M.J. Nasse, E. Huttel, S. Marsching, A.-S. Müller, S. Naknaimueang, R. Rossmanith, R. Ruprecht, M. Schreck, M. Schuh, M. Schwarz, P. Wesolowski
    KIT, Karlsruhe, Germany
  • R.W. Aßmann, M. Felber, K. Flöttmann, M. Hoffmann, H. Schlarb
    DESY, Hamburg, Germany
  • H.-H. Braun, R. Ganter, L. Stingelin
    PSI, Villigen PSI, Switzerland
 
  FLUTE is a linac-based accelerator test facility and a THz source currently being constructed at KIT with an electron beam energy of ~41 MeV. It is designed to cover a large charge range from a few pC to ~3 nC. FLUTE is optimized to provide ultra-short electron bunches with an RMS length down to a few fs. In this contribution, we focus on the layout of the machine from the RF gun & gun laser over the linac and the compressor to the THz beamline for the generation of coherent synchrotron, transition and edge radiation (CSR, CTR, CER).  
poster icon Poster WEPWA010 [0.802 MB]  
 
THPFI063 Development and Beam Tests of an Automatic Algorithm for Alignment of LHC Collimators with Embedded BPMs 3439
 
  • G. Valentino
    University of Malta, Information and Communication Technology, Msida, Malta
  • R.W. Aßmann
    DESY, Hamburg, Germany
  • R. Bruce, M. Gasior, D. Mirarchi, A.A. Nosych, S. Redaelli, B. Salvachua, N.J. Sammut
    CERN, Geneva, Switzerland
 
  Collimators with embedded Beam Position Monitor (BPM) buttons will be installed in the LHC during the upcoming long shutdown period. During the subsequent operation, the BPMs will allow the collimator jaws to be kept centered around the beam trajectory. In this manner, the best possible beam cleaning efficiency and machine protection can be provided at unprecedented higher beam energies and intensities. A collimator alignment algorithm is proposed to center the jaws automatically around the beam. The algorithm is based on successive approximation, as the BPM measurements are affected by non-linearities, which vary with the distance between opposite buttons, as well as the difference between the beam and the jaw centers. The successful test results, as well as some considerations for eventual operation in the LHC are also presented.