  • D. Mäder, H. Höltermann, D. Koser, B. Koubek, K. Kümpel, P. Müller, U. Ratzinger, M. Schwarz, W. Schweizer
    BEVATECH, Frankfurt, Germany
  • C. Angulo, J. Belmans, D. Davin, W. De Cock, P. Della Faille, F. Doucet, A. Gatera, Pompon, F.F. Pompon, D. Vandeplassche
    Studiecentrum voor Kernenergie - Centre d'Étude de l'énergie Nucléaire (SCK•CEN), Mol, Belgium
  • M. Busch, H. Hähnel, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  The MYRRHA project aims at coupling a cw 600 MeV, 4 mA proton linac with a sub-critical reactor as the very first prototype nuclear reactor to be driven by a particle accelerator (ADS). Among several applications, MYRRHA main objective is to demonstrate the principle of partitioning and transmutation (P&T) as a viable solution to drastically reduce the radiotoxicity of long-life nuclear waste. For this purpose, the linac needs an unprecedented level of reliability in terms of allowable beam trips. The normal conducting injector delivers 16.6 MeV protons to the superconducting main linac. The first section of the injector (up to 5.9 MeV) consists of an ECR source, a 4-Rod-RFQ and a rebunching line followed by 7 individual CH-type cavities. This entire section will be set up and operated by SCK·CEN in Louvain-la-Neuve, Belgium, for ample performance and reliability testing. The first CH cavity has been sent for power tests to IAP Frankfurt, Germany. The most recent status of all cavities, couplers and the beam diagnostics of the MYRRHA injector is presented in this paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOPML017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF003 Integrated Prototyping in View of the 100 MeV Linac for Myrrha Phase 1 661
 
  • D. Vandeplassche, J. Belmans
    SCK•CEN, Mol, Belgium
  • C. Angulo, D. Davin, W. De Cock, P. Della Faille, F. Doucet, A. Gatera, Pompon, F.F. Pompon
    Studiecentrum voor Kernenergie - Centre d'Étude de l'énergie Nucléaire (SCK•CEN), Mol, Belgium
  • D. Bondoux, F. Bouly
    LPSC, Grenoble Cedex, France
  • H. Höltermann, D. Mäder
    BEVATECH, Frankfurt, Germany
  • C. Joly, G. Olry, H. Saugnac
    IPN, Orsay, France
  • M. Loiselet, N. Postiau, L. Standaert
    UCL, Louvain-la-Neuve, Belgium
  • H. Podlech, U. Ratzinger
    IAP, Frankfurt am Main, Germany
 
  Funding: Work partially supported by the European Commission H2020 programme MYRTE #662186
The MYRRHA project borne by SCK•CEN, the Belgian Nuclear Research Centre, aims at realizing a pre-industrial Accelerator Driven System (ADS) for exploring the transmutation of long lived nuclear waste. The linac for this ADS will be a High Power Proton Accelerator delivering 2.4 MW CW beam at 600 MeV. It has to satisfy stringent requirements for reliability and availability: a beam-MTBF of 250h is targeted. The reliability goal is pursued through a phased approach. During Phase 1, expected till 2024, the MYRRHA linac up to 100 MeV will be constructed. It will allow to evaluate the reliability potential of the 600 MeV linac. It will also feed a Proton Target Facility in which radioisotopes of interest will be collected through an ISOL system. This contribution will focus on the transition to integrated prototyping, which will emphasize (i) a test platform consisting of the initial section of the normal conducting injector (5.9 MeV), (ii) the realization of a complete cryomodule for the superconducting linac and of its cryogenic valve box. The cryomodule will house two 352 MHz single spoke cavities operated at 2K.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF087 A Two-Stage Splitring-RFQ for High Current Ion Beams at Low Frequencies 941
 
  • M. Baschke, H. Podlech, A. Schempp
    IAP, Frankfurt am Main, Germany
 
  Funding: HIC for FAIR, BMBF Contr. No. 05P15RFRBA
For several accelerator projects RFQs are the first stage of acceleration. To reach high intensities a new Splitring-RFQ is investigated. Not only a high current and high beam quality/brilliance should be achieved, also a good tuning flexibility and comfort for maintenance are part of the study. The RFQ will consist of two stages with 27 MHz and 54 MHz to accelerate ions with an A/q of 60 up to energies of 200 keV/u. RF simulations with CST MWS have been performed to obtain the quality factor, shunt impedance and voltage distribution as well as tuning possibilities. The results and the status of the project will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF087  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF088 Final factory-side Measurements of the Next SC CH-Cavities for the HELIAC-Project 943
 
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher, W.A. Barth, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, F.D. Dziuba, M. Heilmann, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  Funding: Work supported by the EU Framework Programme H2020 662186 (MYRTE); Work supported by BMBF Contr. No. 05P15RFBA;
The upcoming FAIR project (Facility for Antiproton and Ion Research) at GSI will use the existing UNILAC (UNIversal Linear Accelerator) as an injector to provide high intensity heavy ion beams at low repetition rates. As a consequence a new superconducting (sc) continous wave (cw) high intensity heavy ion Linac is required to provide ion beams above the coulomb barrier to keep the Super Heavy Element (SHE) physics program at GSI competitive on an international level. The fundamental Linac design comprises a high performance ion source, the High Charge State Injector (HLI) upgraded for cw-operation and a matching line (1.4 MeV/u) followed by a sc Drift Tube Linac (DTL). Four cryo modules each equipped with three Crossbar-H-mode (CH) structures provide for acceleration up to 7.3 MeV/u. The first section of this ambitious accelerator project has been successfully commissioned and tested with heavy ion beam from the HLI in 2017. It comprises two sc 9.3 T solenoids and a sc 217 MHz CH-cavity with 15 equidistant gaps as a demonstrator. The construction of the next two sc 217 MHz 8 gap CH-cavities is nearly finished and final factory-side measurements will be presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF088  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF089 Initial Measurements on a New 108 MHz 4-Rod CW RFQ Prototype for the HLI at GSI 946
 
  • D. Koser, K. Kümpel, H. Podlech
    IAP, Frankfurt am Main, Germany
  • P. Gerhard
    GSI, Darmstadt, Germany
  • O.K. Kester
    TRIUMF, Vancouver, Canada
 
  Funding: Work supported by BMBF Contr. No. 05P15RFBA and HIC for FAIR
The High Charge State Injector (HLI) at the GSI Helmholtz Centre for Heavy Ion Research in Darmstadt, Germany, is one of the two injector linacs for the Universal Linear Accelerator (UNILAC) and is also planned to serve as dedicated injector for a proposed superconducting CW linac for heavy element research. Within the scope of an intended CW upgrade of the HLI front end, a replacement for the existing 4-rod RFQ is desirable since its stable operation and performance is severely impeded by mechanical vibrations of the electrodes and a high thermal sensitivity*. With the aim of suppressing mechanical vibrations and providing efficient cooling considering high power CW operation, a completely new and improved 4-rod design was developed** with a focus on structural mechanical simulations using ANSYS. In order to validate the simulated RF performance, thermal behavior and structural mechanical characteristics, a 6-stem prototype was manufactured***. Initial low power RF measurements and basic piezo actuated mechanical investigations were done and the anticipated properties could be confirmed prior to planned high power RF tests and further mechanical vibration studies.
* D. Koser et al., THPIK021, Proc. of IPAC2017
** D. Koser et al., MOPOY020, Proc. of IPAC2016
*** D. Koser et al., TUPLR057, Proc. of LINAC2016
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF089  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAF090 Measurements of the MYRRHA-RFQ at the IAP Frankfurt 949
 
  • K. Kümpel, D. Koser, S. Lamprecht, N.F. Petry, H. Podlech, A. Schempp, D. Strecker
    IAP, Frankfurt am Main, Germany
  • A. Bechtold
    NTG Neue Technologien GmbH & Co KG, Gelnhausen, Germany
  • C. Zhang
    GSI, Darmstadt, Germany
 
  Funding: Work supported by the EU Framework Programme H2020 662186 (MYRTE)
The MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) Project is a planned accelerator driven system (ADS) which aims to demonstrate the feasibility of large scale transmutation. The first RF structure of the 600 MeV MYRRHA Linac will be a 176.1 MHz 4-Rod RFQ that will accelerate up to 4 mA protons in cw operation from 30 keV up to 1.5 MeV. The voltage along the approximately 4 m long electrodes has been chosen to 44 kV which limits the RF losses to about 25 kW/m. During the design of the structure a new method of dipole compensation has been applied. This paper describes the status of the RFQ and shows the results of the measurements done at IAP Frankfurt such as dipole and flatness measurement, vacuum tests and power tests up to 11 kW.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAF090  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK002 Advanced Approach for Beam Matching along the Multi-Cavity SC CW Linac at GSI 955
 
  • S. Yaramyshev, W.A. Barth, M. Heilmann
    GSI, Darmstadt, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  A multi-stage program for the development of a heavy ion superconducting (sc) continuous wave (cw) linac is in progress at HIM (Mainz, Germany) and GSI (Darmstadt, Germany) under support of IAP (Frankfurt, Germany). In 2017 the first section of the CW-Linac has been successfully commissioned at GSI. Beam acceleration at the CW-Linac is foreseen to be performed by up to twelve multi-gap CH cavities. The linac should provide the beam for physics experiments, smoothly varying the output particle energy from 3.5 to 7.3 MeV/u, simultaneously keeping high beam quality. Due to a wide variation of the input- and output -beam energy for each cavity, a longitudinal beam matching to every cavity is of high importance. An advanced algorithm for an optimization of matched beam parameters under variable rf-voltage and rf-phase of each cavity has been developed. The description of the method and the obtained results are presented in the paper.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK002  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK003 Beam Dynamics Simulations for the New Superconducting CW Heavy Ion LINAC at GSI 959
 
  • M. Schwarz, M. Basten, M. Busch, H. Podlech
    IAP, Frankfurt am Main, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, W.A. Barth, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
 
  Funding: Work supported by BMBF Contr. No. 05P15RFBA and EU Framework Programme H2020 662186 (MYRTE)
For future experiments with heavy ions near the coulomb barrier within the super-heavy element (SHE) research project a multi-stage R&D program of GSI/HIM and IAP is currently in progress. It aims for developing a supercon-ducting (sc) continuous wave (CW) LINAC with multiple CH cavities as key components downstream the High Charge State Injector (HLI) at GSI. The LINAC design is challenging due to the requirement of intense beams in CW mode up to a mass-to-charge ratio of 6, while covering a broad output energy range from 3.5 to 7.3 MeV/u with unchanged minimum energy spread. Testing of the first CH-cavity in 2016 demonstrated a promising maximum accelerating gradient of Ea = 9.6 MV/m; the worldwide first beam test with this sc multi-gap CH-cavity in 2017 was a milestone in the R&D work of GSI/HIM and IAP. In the light of experience gained in this research so far, the beam dynamics layout for the entire LINAC has recently been updated and optimized.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPAK004 Superconducting CH-Cavity Heavy Ion Beam Testing at GSI 962
 
  • W.A. Barth, M. Heilmann, A. Rubin, A. Schnase, S. Yaramyshev
    GSI, Darmstadt, Germany
  • K. Aulenbacher
    IKP, Mainz, Germany
  • K. Aulenbacher, F.D. Dziuba, V. Gettmann, T. Kürzeder, M. Miski-Oglu
    HIM, Mainz, Germany
  • M. Basten, M. Busch, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
 
  Recently the first section of a standalone superconducting (sc) continuous wave (cw) heavy ion Linac as a demonstration of the capability of 217 MHz multi gap Crossbar H-mode structures (CH) has been commissioned and extensively tested with beam from the GSI- High Charge State Injector. The demonstrator set up reached acceleration of heavy ions up to the design beam energy and beyond. The required acceleration gain was achieved with heavy ion beams even above the design mass to charge ratio at high beam intensity and full beam transmission. This contribution presents systematic beam measurements with varying RF-amplitudes and phases of the CH-cavity, as well as versatile phase space measurements for heavy ion beams with different mass to charge ratio. The worldwide first and successful beam test with a superconducting multi gap CH-cavity is a milestone of the R&D work of Helmholtz Institute Mainz (HIM) and GSI in collaboration with Goethe University Frankfurt (GUF) in preparation of the sc cw heavy ion Linac project and other cw-ion beam applications.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-TUPAK004  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML040 Further Tests on the Final State of the SC 325 MHz CH-Cavity and Coupler Test Bench Update 2783
 
  • M. Busch, M. Basten, J. List, P. Müller, H. Podlech, M. Schwarz
    IAP, Frankfurt am Main, Germany
  • W.A. Barth, J. List
    GSI, Darmstadt, Germany
  • W.A. Barth
    HIM, Mainz, Germany
  • W.A. Barth
    MEPhI, Moscow, Russia
 
  Funding: Work supported by BMBF Contr. No. 05P15RFBA
At the Institute for Applied Physics, Goethe-University Frankfurt, a sc 325 MHz CH-cavity has been developed and successfully tested up to 14.1 mV/m and has now reached the final production stage with the helium vessel welded to the frontal joints of the cavity and final processing steps have been performed. Further tests in a vertical and horizontal environment are being prepared for intensive studies. This cavity is a prototype for envisaged beam tests with a pulsed ion beam at 11.4 AMeV. In this contribution the results of the performed RF tests are being presented. Furthermore, first measurements of the recently installed 217 MHz coupler test bench are shown.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML040  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML043 RF Simulations of the Injector Section from CH8 to CH15 for MYRRHA 2790
 
  • P. Müller, M. Busch, H. Hähnel, K. Kümpel, D. Mäder, N.F. Petry, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  Funding: Work supported by the EU Framework Programme H2020 662186 (MYRTE) and HIC for FAIR
MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) is the first prototype of an accelerator driven nuclear reactor dealing with the transmutation of long-living nuclear waste. Beam quality and reliability are crucial for the reactor. The injector design is done by IAP, Goethe-University, and has been adapted to the final magnet design and voltage distributions. The energy section from 5.87 MeV up to 16.6 MeV has been changed to normal conducting CH cavities as in the lower energy part of the injector. For beam adjustment a 5-gap CH cavity rebuncher at 5.87 MeV as well as two doublet magnets forming the new MEBT-2 section between CH7 and CH8 have been added. Starting parameters for the RF simulations have been given by beam dynamics results calculated with LORASR. RF simulations of these structures consisting of flatness and tuning optimizations will be presented within this contribution.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML043  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPML044 Design of HOM Couplers for Superconducting 400 MHz RF Cavities 2793
 
  • N.F. Petry, M. Busch, K. Kümpel, O. Meusel, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  The Future Circular Collider (FCC) is one possible future successor of the Large Hadron Collider (LHC). The proton-proton collider center-of-mass collision energy is set to 100 TeV with a beam current of 0.5 A. To reach this goal a stable acceleration is critical and therefore higher order modes (HOM) need to be damped. To avoid a high power level in the HOM dampers, further described as couplers, the loaded Q-factor should be below 1000 for the cavity with mounted HOM couplers. Besides a low Q-factor the R/Q value should also be in the range of 1 Ω or below. Two different types of couplers are used to achieve a high damping. The two types are a narrowband Hook-type HOM coupler and a broadband Probe-type HOM coupler. The recent results of the design of the HOM couplers attached to a superconducting 400 MHz RF cavity will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML044  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAF082 Frequency Jump at Low Energies 3176
 
  • C. Zhang
    GSI, Darmstadt, Germany
  • H. Podlech
    IAP, Frankfurt am Main, Germany
 
  One or more radio-frequency jumps are usually necessary for realizing a ≥100 AMeV/u proton or ion driver linac. Typically, such jumps happen in the range of β = 0.2-0.6 between the resonator structures fitting to this β-range, e.g. DTL, HWR, CCL or elliptical cavities. We propose to perform the first frequency jump already at low energies (β ≤ 0.1) between two RFQ accelerators, which can bring some unique advantages. First studies have been performed and the results proved that this idea is feasible and promising. Many efforts have been and are being made to address the most critical issue for the jumps i.e. the beam matching at the transition.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAF082  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPAF083 LINAC-Multitool - an Open Source Java-Toolkit 3179
 
  • M. Schwarz, D. Bade, J. Corbet, H. Podlech
    IAP, Frankfurt am Main, Germany
 
  Funding: Work supported by BMBF contr. No. 05P15RFRBA and HIC for FAIR.
Dedicating more precious time to advanced research instead of spending it towards time-consuming routine tasks is a desirable goal in particle accelerator simulation and development. Requirements engineering was started at IAP in order to identify routine processes at our institute's R&D that can be automated or simplified. Results indicated that there were several areas to consider: Bead pull measurements, data processing and visualization for the beam dynamics code LORASR, CST field map processing for the use with TraceWin, conversion between different particle distribution data formats and more. Subsequently development of the LINAC-Multitool started to rationalize these processes and replace preexisting scripts also to ensure consistency of results and increase transparency and reliability of computation. In order to guarantee maintainability, expandability and platform independence, LINAC-Multitool is programmed using Java and will be open source. This contribution presents the current state of development.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPAF083  