Keyword: rfq
Paper Title Other Keywords Page
MOP047 Progress of IFMIF/EVEDA Project and Prospects for A-FNS neutron, radiation, SRF, cavity 159
 
  • S. Ishida, A. Kasugai, K. Sakamoto
    QST, Aomori, Japan
  • P. Cara
    IFMIF/EVEDA, Rokkasho, Japan
  • H. Dzitko
    F4E, Germany
 
  International Fusion Materials Irradiation Facility (IFMIF) is an accelerator-based D-Li neutron source, in which two 40 MeV Deuteron(D) beams with a total current 250 mA impact on a liquid Li stream flowing at 15 m/s. In the IFMIF/EVEDA project under the Broader Approach (BA) agreement, the Li target was continuously operated with the cold trap and satisfied the stability requirement throughout the continuous operation. The Linear IFMIF Prototype Accelerator (LIPAc) is currently under development in Rokkasho, Japan, to demonstrate the 9 MeV/125 mA D+ beam acceleration. Recently, the first proton beam was injected into the RFQ with more than 90 % of transmission, followed by the first D+ beam accelerated at 5 MeV. The SRF linac necessary for the 9-MeV D+ beam is nearing completion of the manufacturing phase and will be assembled in Rokkasho. Based on these results, a conceptual design of the Advanced Fusion Neutron Source (A-FNS) for its construction in Rokkasho is underway to obtain material irradiation data for a DEMO reactor. The A-FNS is designed to be composed of an accelerator facility with a 40 MeV/125 mA D+ beam, a test facility including a liquid Li target system and a post irradiation examination facility, and to enable multipurpose utilization for neutron application.  
poster icon Poster MOP047 [2.327 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOP047  
About • paper received ※ 29 June 2019       paper accepted ※ 12 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOP080 Latest Progress in Designs and Testings of PIP-II Power Couplers cavity, vacuum, multipactoring, cryogenics 263
 
  • S. Kazakov, B.M. Hanna, O.V. Pronitchev, N. Solyak
    Fermilab, Batavia, Illinois, USA
 
  Proton Improvement Plan – II (PIP-II) project is under go in Fermi National Laboratory. Main part of the project is 800 MeV proton superconducting accelerator which includes 116 superconducting cavities of 5 different types and three 162.5, 325 and 650 MHz frequencies. Key elements of accelerator which determine a reliable operation are main couplers for superconducting cavities. This paper describes the latest progress in design and testing of main couplers for PIP-II projects.  
poster icon Poster MOP080 [0.881 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-MOP080  
About • paper received ※ 18 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)