Progress of IFMIF/EVEDA Project and Prospects for A-FNS |
neutron, radiation, SRF, cavity |
159 |
|
- S. Ishida, A. Kasugai, K. Sakamoto
QST, Aomori, Japan
- P. Cara
IFMIF/EVEDA, Rokkasho, Japan
- H. Dzitko
F4E, Germany
|
|
|
International Fusion Materials Irradiation Facility (IFMIF) is an accelerator-based D-Li neutron source, in which two 40 MeV Deuteron(D) beams with a total current 250 mA impact on a liquid Li stream flowing at 15 m/s. In the IFMIF/EVEDA project under the Broader Approach (BA) agreement, the Li target was continuously operated with the cold trap and satisfied the stability requirement throughout the continuous operation. The Linear IFMIF Prototype Accelerator (LIPAc) is currently under development in Rokkasho, Japan, to demonstrate the 9 MeV/125 mA D+ beam acceleration. Recently, the first proton beam was injected into the RFQ with more than 90 % of transmission, followed by the first D+ beam accelerated at 5 MeV. The SRF linac necessary for the 9-MeV D+ beam is nearing completion of the manufacturing phase and will be assembled in Rokkasho. Based on these results, a conceptual design of the Advanced Fusion Neutron Source (A-FNS) for its construction in Rokkasho is underway to obtain material irradiation data for a DEMO reactor. The A-FNS is designed to be composed of an accelerator facility with a 40 MeV/125 mA D+ beam, a test facility including a liquid Li target system and a post irradiation examination facility, and to enable multipurpose utilization for neutron application.
|
|
|
Poster MOP047 [2.327 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2019-MOP047
|
|
About • |
paper received ※ 29 June 2019 paper accepted ※ 12 July 2019 issue date ※ 14 August 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOP080 |
Latest Progress in Designs and Testings of PIP-II Power Couplers |
cavity, vacuum, multipactoring, cryogenics |
263 |
|
- S. Kazakov, B.M. Hanna, O.V. Pronitchev, N. Solyak
Fermilab, Batavia, Illinois, USA
|
|
|
Proton Improvement Plan – II (PIP-II) project is under go in Fermi National Laboratory. Main part of the project is 800 MeV proton superconducting accelerator which includes 116 superconducting cavities of 5 different types and three 162.5, 325 and 650 MHz frequencies. Key elements of accelerator which determine a reliable operation are main couplers for superconducting cavities. This paper describes the latest progress in design and testing of main couplers for PIP-II projects.
|
|
|
Poster MOP080 [0.881 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2019-MOP080
|
|
About • |
paper received ※ 18 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 |
|