Paper | Title | Page |
---|---|---|
MOXA07 | Development of the C-ADS SRF Accelerator at IHEP | 19 |
|
||
Funding: CAS Strategic Priority Research Program-Future Advanced Nuclear Fission Energy (Accelerator-Driven Sub-critical System) and National Natural Science Foundation of China, under contract NO. 11405190 The 10 MeV accelerator-driven subcritical system (ADS) Injector I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The ion source was installed since April of 2014, periods of commissioning are regularly scheduled between installation phases of the rest of the injector. Early this year, continuous wave (CW) proton beam has been successfully obtained with energy of 10MeV and average beam current around 2 mA, the single spoke cavities with smallest developed beta (βg=0.12) were applied and successfully commissioned. Single spoke cavities with higher beta (βg=0.21) were also adopted for the last cryomodule of 25MeV proton linac, and 170uA CW proton beam were shooting through recently. This contribution reports the details of the development of the C-ADS SRF accelerator at IHEP and the challenges of the CW machine commissioning |
||
![]() |
Slides MOXA07 [5.605 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOXA07 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPB054 | Design of Fundamental Power Coupler for High Intensity Heavy-ion Accelerator | 183 |
|
||
A single-window coaxial coupler at warm has been designed for high intensity heavy-ion accelerator. The coupler is designed to handle 100 kW CW power of 325 MHz and is currently being fabricated. T-bend transition and doorknob have been taken into account. The length of the T-bend short circuit is sensitive to S parameters and contributes to the online adjustment of VSWR in RF conditioning. The doorknob type is adopted to realize the transition from a half-height WR 2300 waveguide to a coaxial line ended with a coupling antenna. This paper describes the RF design, thermal stress and heat load analysis of the coupler as well as multipacting simula-tions. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB054 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPB070 | The Improvement of the Power Coupler for CADS SC Spoke Cavities | 220 |
|
||
Twenty superconducting spoke cavities mounted in three cryomodules (CM1, CM2 and CM4) were in-stalled in the CADS, a test facility of 10 mA, 25 MeV CW proton linac. Each cavity was equipped with one coaxial type fundamental power coupler (FPC). Fatal window crack was observed during the test cryomod-ule (TCM) commissioning. A series of experiments were subsequently implemented and eventually at-tributed the window crack to the electron bombard-ment from cavity field emission (FE). Improvements covering the coupler cleaning and assembly proce-dure, the structure and position modifications were thus implemented, aiming to reduce the cavity contam-ination and avoid the window damaged by cavity FE electrons. This paper will describe how the coupler window damaged by cavity field emission and the improve-ments for cure. In addition, the performances of FPCs for CM1, CM2 and CM4 were compared. | ||
![]() |
Poster MOPB070 [0.613 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB070 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPB071 | The Recent Research of HOM Damper for Superconducting Cavity in IHEP | 223 |
|
||
Funding: This study was supported by National Key Programme for S&T Research and Development (Grant NO.: 2016YFA0400400) For high current accelerator, the efficient higher-order mode (HOM) damping is always an important issue. HOM damper with microwave absorbing material is a key component for high power and broadband HOM damping application. To pursue the high damping efficiency, some ideal material with good microwave absorbing capacity is essential during the RF design and fabrication phase. Sometimes the selection and test of material is the first step and also a long step. This paper will present the recent work on HOM dampers for BEPCII 500MHz cavity and CEPC 650MHz cavity in IHEP. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB071 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPB005 | Developed Spoke Cavity Module for Main Linac of China ADS HOM Simulations and Damping Scheme for CEPC Cavities | 393 |
|
||
During past five year, two kind of spoke of Beta equal 0.21 and 0.40 were developed at IHEP CAS, the spoke cavity of beta 0.21 was adopted to accelerate proton from 10 to 32MeV, and 32 to 160MeV for beta 0.40 spoke cavity. Up to now, two kind of naked spoke cavities have been test in vertical, also the module of beta 0.21 spoke cavity, which equipped the liquid helium jacket, magnetic shield layer and frequency tuner has been fulfilled and test, the performance of all of components reach the design requirements. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-TUPB005 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPB034 | The 166.6 MHz Proof-of-principle SRF Cavity for HEPS-TF | 454 |
|
||
Funding: This work has been supported by HEPS-TF project and also partly supported by Pioneer "Hundred Talents Program" of Chinese Academy of Sciences. The 166.6 MHz superconducting RF cavities have been proposed for the High Energy Photon Source (HEPS), a 6 GeV kilometer-scale light source. The cavity is of quarter-wave type made of bulk niobium with β =1. Each cavity will be operated at 4 K providing 1.2 MV accelerating voltage and 145 kW of power to the electron beam. During the HEPS - Test Facility (HEPS-TF) phase, a proof-of-principle cavity of 166.6 MHz has been designed in IHEP and manufactured in Beijing. The subsequent BCP was conducted in Ningxia, while HPR, cleanroom assembly and 120 degree baking was done in IHEP. The cavity was finally vertical tested at both 4K and 2K in IHEP. The cavity Q0 at nominal gradient at 4 K was measured to be 2.4·109 with Epeak of 42 MV/m and Bpeak of 65 mT. The maximum Epeak and Bpeak reached 86MV/m and 131 mT respectively at both 4 K and 2 K, and the corresponding Q0 was measured to be 5.108 (4 K) and 3.3·109 (2 K). The residual surface resistance was measured to be 2.3 nOhm. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-TUPB034 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEYA04 |
The R&D on TEM-type SRF Cavities for High-current Applications at IHEP | |
|
||
Funding: This work has been supported partly by Pioneer 'Hundred Talents Program' of Chinese Academy of Science. The recent SRF R&D efforts on TEM-type cavities at IHEP have been strongly linked to two large projects: high current proton linac for ADS and High Energy Photon Source (HEPS). A CW 10 MeV proton injector and part of the 25 MeV main linac for the CADS project are developed at IHEP. 14 SRF spoke012 cavities for the injector have been commissioned with 10.6mA proton beam at 10.67MeV; while 6 SRF spoke021 cavities for the main linac have been assembled into cryomodule in Lanzhou. 166.6 MHz quarter-wave β=1 cavities were proposed for HEPS storage ring, required by the planned on-axis beam accumulation injection scheme. Each 166.6 MHz cavity will be operated at 4 K providing 1.2 MV accelerating voltage and 145 kW of power to the electron beam. A proof-of-principle cavity has been manufactured and vertical tested recently with a success. HOM damping is currently being designed. The development progress of the 6 types of spoke, HWR, QWR cavities, and their ancillaries, as well as the spoke cavity performance during beam operation, will be addressed. |
||
![]() |
Slides WEYA04 [2.904 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |