Paper | Title | Page |
---|---|---|
MOPB031 | Fabrication and Cold Test Result of FRIB β=0.53 Pre-production Cryomodule | 120 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 The driver linac for the Facility for Rare Isotope Beams (FRIB) comprises four kinds of cavities (β=0.041, 0.085, 0.29, and 0.53) and six types of cryomodules including matching modules. FRIB has completed the fabrication and the cold test of a β=0.53 pre-production cryomodule, which is the first prototype for a half-wave (β=0.29 and 0.53) cavity. This paper describes the fabrication and the cold test result of the β=0.53 pre-production cryomodule including lessons learned. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB031 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUXAA03 | Progress of FRIB SRF Production | 345 |
|
||
Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661 The Facility for Rare Isotope Beams (FRIB), under construction at Michigan State University, will utilize a driver linac to accelerate stable ion beams from protons to uranium up to energies of >200 MeV per nucleon with a beam power of up to 400 kW. The FRIB linac consists of 46 cryomodules containing a total of 324 superconducting radio-frequency (SRF) resonators and 69 superconducting solenoids. The design of all six type cryomodules has been completed. The critical SRF components are tested as subsystem and validated in the pre-production cryomodules. The mass production of SRF cryomodules is underway. Here we report on the progress of the technical construction of FRIB superconducting linac. |
||
![]() |
Slides TUXAA03 [4.006 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-TUXAA03 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THYA01 | Performance Testing of FRIB Early Series Cryomodules | 715 |
|
||
Funding: U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661. Construction of a new accelerator for nuclear physics research, the Facility for Rare Isotope Beams (FRIB), is underway at Michigan State University (MSU). The FRIB linac will use superconducting resonators at an operating temperature of 2 K to accelerate ions to 200 MeV per nucleon. The linac requires 106 quarter wave resonators (80.5 MHz, β = 0.043 and 0.086) and 248 half wave resonators (322 MHz, β = 0.29 and 0.54), all made from sheet Nb. Production resonators being delivered to MSU by cavity vendors. At MSU, the resonators are etched, rinsed, and tested in MSU's certification test facility. Certification testing is done before the installation of the high-power input coupler and the tuner. After certification, the resonators are tested in the cryomodule before installation into the FRIB tunnel. The cryomodule test goals are to verify integrated operation of the resonators, RF couplers, tuners, RF controls, and superconducting solenoids. To date, 10 cryomodules out of 48 have been fabricated, and 8 of the cryomodules have been certified. Cryomodule test results are presented in this paper. |
||
![]() |
Slides THYA01 [31.165 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-THYA01 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |