Paper | Title | Page |
---|---|---|
MOY02 | NICA Ion Coolider at JINR | 12 |
|
||
The Nuclotron-based Ion Collider fAcility (NICA) is under construction in JINR. The NICA goals are providing of colliding beams for studies of hot and dense strongly interacting baryonic matter and spin physics. The accelerator facility of collider NICA consists of following elements: acting Alvarez-type linac LU-20 of light ions at energy 5 MeV/u, constructed a new light ion linac of light ions at energy 7 MeV/n and protons at energy 13 MeV, new acting heavy ion linac HILAC with RFQ and IH DTL sections at energy 3.2 MeV/u, new acting superconducting booster synchrotron at energy up 600 MeV/u, acting superconducting synchrotron Nuclotron at gold ion energy 4.5 GeV/n and mounted two Collider storage rings with two interaction points. The status of acceleration complex NICA is under discussion. | ||
![]() |
Slides MOY02 [15.467 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-MOY02 | |
About • | Received ※ 24 September 2021 — Revised ※ 25 September 2021 — Accepted ※ 07 October 2021 — Issued ※ 12 October 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPSA01 |
The New Light-Ion Linac for the NICA Injection Complex | |
|
||
A joint team from JINR (Dubna, Russia) and Bevatech GmbH (Frankfurt-am-Main, Germany) is now realizing the new light ion linac LILac for the realization of the NICA project. The resonator design, the beam dynamics calculations, the vacuum system, RF system are presented. | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEA01 | Beam Transfer Systems of NICA Facility: from HILAC to Booster | 61 |
|
||
New accelerator complex is being constructed by Joint Institute for Nuclear Research (Dubna, Russia) in frame of Nuclotron-based Ion Collider fAcility (NICA) project. The NICA layout includes new Booster and existing Nuclotron synchrotrons as parts of the heavy ion injection chain of the NICA Collider as well as beam transport lines which are the important link for the whole accelerator facility. Designs and current status of beam transfer systems in the beginning part of the NICA complex, which are partially commissioned, are presented in this paper. | ||
![]() |
Slides WEA01 [26.886 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-WEA01 | |
About • | Received ※ 07 October 2021 — Revised ※ 08 October 2021 — Accepted ※ 13 October 2021 — Issued ※ 22 October 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEA02 | Acceleration the Beams of He⁺ and Fe14+ Ions by HILAC and its Injection into NICA Booster in its Second Run | 65 |
|
||
Injector of NICA accelerating facility based on the Heavy Ion Linear Accelerator (HILAC) is aimed to inject the heavy ions having atomic number A~200 and ratio A/Z - 6.25 produced by ESIS ion source accelerated up to the 3.2 MeV for the injection into superconducting synchrotron (SC) Booster. The project output energy of HILAC was verified on commissioning in 2018 using the beams of carbon ions produced with the Laser Ion Source and having ratio A/Z=6 that is close to the project one. Beams of He1+ ions were injected into Booster in its first run and accelerated in 2020. In 2021 ions of Fe14+ produced with the LIS were injected and accelerated up to 200 MeV/u. Beam formation of Fe ions and perspectives of using LIS for the production the ions with high atomic mass A and ratio A/Z matching to HILAC input parameters are described. | ||
![]() |
Slides WEA02 [12.908 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-RuPAC2021-WEA02 | |
About • | Received ※ 07 October 2021 — Revised ※ 08 October 2021 — Accepted ※ 13 October 2021 — Issued ※ 14 October 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |