TUY02 | Status of Injection Complex VEPP-5 | 11 |
|
||
The status of Injection complex VEPP-5 commissioning are presented. | ||
![]() |
Slides TUY02 [1.386 MB] | |
THX01 | Results of LIA-2 Operation | 275 |
|
||
Funding: Supported in part by Russian ministry of science and education. Recent results of LIA-2 operation are presented. High quality of intense electron beam has been achieved in designed intervals of energy and current. All key elements of accelerator based on domestic technology successfully passed though long term operational tests. |
||
![]() |
Slides THX01 [1.271 MB] | |
FRCA01 | Cooling Storage Ring CR of the FAIR Facility - Status and Perspectives | 456 |
|
||
The Collector Ring (CR) is a wide aperture storage ring of the FAIR international facility (Darmstadt, Germany) dedicated to perform the stochastic precooling of secondary particles, rare isotopes or antiprotons. BINP (Novosibirsk) takes responsibility on the design and construction of almost all systems of the CR. The project status, preliminary design of main systems and results of the modelling of beam dynamics are presented. | ||
![]() |
Slides FRCA01 [2.060 MB] | |
FRCA03 | Electron and Positron Beams Transportation Channels to BINP Colliders | 462 |
|
||
Funding: Ministry of Education and Science of the Russian Federation, NSh-4860.2014.2 The overview of electron and positron beams transportation channels from injection complex VEPP-5 to VEPP-4M and VEPP-2000 colliders is presented. The last one is discussed in details. The lattice functions, magnetic elements, beam diagnostic system ans vacuum system are presented. The beam commissioning is scheduled to the end of the year. |
||
![]() |