MPPT070 Construction and Power Test of the Extraction Kicker Magnet for the Spallation Neutron Source Accumulator Ring 3831
 
  • C. Pai, H. Hahn, H.-C. Hseuh, Y.Y. Lee, W. Meng, J.-L. Mi, D. Raparia, J. Sandberg, R.J. Todd, N. Tsoupas, J.E. Tuozzolo, D.S. Warburton, J. Wei, D. Weiss, W. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

Two extraction kicker magnet assemblies that contain seven individual pulsed magnet modules each will kick the proton beam vertically out of the SNS accumulator ring into the aperture of the extraction lambertson septum magnet. The proton beam then travels to the 1.4 MW SNS target assembly. The 14 kicker magnets and major components of the kicker assembly have been fabricated in BNL. The inner surfaces of the kicker magnets were coated with TiN to reduce the secondary electron yield. All 14 PFN power supplies have been built, tested and delivered to ORNL. Before final installation, a partial assembly of the kicker system with three kicker magnets was assembled to test the functions of each critical component in the system. In this paper we report the progress of the construction of the kicker components, the TiN coating of the magnets, the installation procedure of the magnets and the full power test of the kicker with the PFN power supply.

 
MPPT071 The Lambertson Septum Magnet of the Spallation Neutron Source 3847
 
  • J. Rank, Y.Y. Lee, W.J. McGahern, G. Miglionico, D. Raparia, N. Tsoupas, J.E. Tuozzolo, J. Wei
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under contract for SNS, managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 with the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

In the Spallation Neutron Source, at Oak Ridge National Laboratory in Tennessee, multiple-stage injections to an accumulator ring increase intensity until a final extraction delivers the full proton beam to the target via transfer line. This extraction is achieved by a series of kicker elements and a thin septum Extraction Lambertson Septum Magnet. Here we discuss the lattice geometry, beam dynamics and optics, and the vacuum, electromagnetic and electromechanical design aspects of the SNS Extraction Lambertson Septum Magnet. Relevant datums are established. Beam optics is studied. Vector calculus is solved for pitch and roll angles. Fundamental magnet sections are depicted schematically. Coil, pole and yoke design calculations and electromagnetics optimization are presented.

 
MOPB004 Progress on Test EBIS and the Design of an EBIS-Based RHIC Preinjector 363
 
  • J.G. Alessi, E.N. Beebe, O. Gould, A. Kponou, R. Lockey, A.I. Pikin, K. Prelec, D. Raparia, J. Ritter, L. Snydstrup
    BNL, Upton, Long Island, New York
 
  Funding: Work supported under the auspices of the U.S. DOE.

Following the successful development of the Test EBIS at BNL,* we now have a design for an EBIS-based heavy ion preinjector which would serve as an alternative to the Tandem Van de Graaffs in providing beams for RHIC and the NASA Space Radiation Laboratory. This baseline design includes an EBIS producing mA-level currents of heavy ions (ex. Au 32+) in ~ 10-20 microsecond pulses, injecting into an RFQ which accelerates the beams to 300 keV/amu, followed by an IH linac accelerating to 2 MeV/amu. Some details of this design will be presented, as well recent experimental results on the Test EBIS.

*E.N. Beebe et al., Proc. Ninth International Symposium on Electron Beam Ion Sources and Traps, Journal of Physics: Conference Series 2 (2004) 164–173.

 
TOAA007 SNS Injection and Extraction Devices 553
 
  • D. Raparia
    BNL, Upton, Long Island, New York
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

The Spallation Neutron Source (SNS) is a second generation pulsed neutron source (1.5 MW) and is presently in the sixth year of a seven-year construction cycle at Oak Ridge National Laboratory. The operation of the facility will begin in 2006. The most stringent requirement for the SNS accelerator complex is to allow hands-on maintenance. Operational experiences show that the most losses occur in the injection and extraction. SNS accumulator ring injection and extraction has been design with grate care to reduce uncontrolled losses. Injection systems consist of fast programmable kicker magnets and DC dump magnets to paint the beam in transverse phase space. Extraction systems consist of fast kicker magnets and a Lamberton magnet to extract beam in single turn. Paper will discuss design, construction and testing of these devices.

 
TPPE007 Energy Correction for High Power Proton/H Minus Linac Injectors 1075
 
  • D. Raparia, Y.Y. Lee, J. Wei
    BNL, Upton, Long Island, New York
 
  High-energy proton/H minus (> GeV) linear accelerators suffer from energy jitter due to RF amplitude and phase stability. For high-power operations, such energy jitter often results in beam losses at more than 1 W/m level required for hands-on maintenance. Depending upon the requirements for next accelerator in the chain, this energy jitter may or may not require correction. This paper discusses the sources of energy jitter and correction feasibility with specific examples of the Spallation Neutron Source linac and a higher-energy H minus linac.  
WPAE035 SNS Ring Injection Stripped Electron Collection: Design Analysis and Technical Issues 2384
 
  • Y.Y. Lee, G.J. Mahler, W. Meng, D. Raparia, L. Wang, J. Wei
    BNL, Upton, Long Island, New York
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

This paper describes the simulation studies on the motions of stripped electrons generated in the injection section of the Spallation Neutron Source (SNS) accumulator ring and the effective collection mechanism. Such studies are important for high intensity machines, in order to reduce beam loss and protect other components in the vicinity. The magnetic field is applied to guide electrons to a collector, which is located at the bottom of the beam chamber. Part of the study results with and without considering the interactions between electrons and materials are presented and discussed. The final engineering design of the electron collector (catcher) is also presented and described.

 
RPPE031 Target and Horn Cooling for the Very Long Baseline Neutrino Experiment 2209
 
  • S. Bellavia, S.A. Kahn, H.G. Kirk, H. Ludewig, D. Raparia, N. Simos
    BNL, Upton, Long Island, New York
 
  Funding: This work is performed under the auspices of the US DOE.

Thermodynamic studies have been performed for the beam target and focusing horn system to be used in a very long baseline neutrino oscillation experiment. A 2mm rms beam spot with power deposition of over 18 KW presents challenging material and engineering solutions to this project. Given that the amount of heat transferred by radiation alone from the target to the horn is quite small, the primary mechanism is heat removal by forced convection in the annular space between the target and the horn. The key elements are the operating temperature of the target, the temperature of the cooling fluid and the heat generation rate in the volume of the target that needs to be removed. These working parameters establish the mass flow rate and velocity of the coolant necessary to remove the generated heat. Several cooling options were explored using a carbon-carbon target and aluminum horn. Detailed analysis, trade studies and simulations were performed for cooling the horn and target with gaseous helium as well as water.

 
RPPE048 Physical and Electromagnetic Properties of Customized Coatings for SNS Injection Ceramic Chambers and Extraction Ferrite Kickers 3028
 
  • H.-C. Hseuh, M. Blaskiewicz, P. He, Y.Y. Lee, C. Pai, D. Raparia, R.J. Todd, L. Wang, J. Wei, D. Weiss
    BNL, Upton, Long Island, New York
  • S. Henderson
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

The inner surfaces of the 248 m SNS accumulator ring vacuum chambers are coated with ~100 nm of titanium nitride (TiN) to reduce the secondary electron yield (SEY) of the chamber walls. All the ring inner surfaces are made of stainless or inconel, except those of the injection and extraction kickers. Ceramic vacuum chambers are used for the 8 injection kickers to avoid shielding of a fast-changing kicker field and to reduce eddy current heating. The internal diameter was coated with Cu to reduce the beam coupling impedance and provide passage for beam image current, and a TiN overlayer to reduce SEY. The ferrite surfaces of the 14 extraction kicker modules were coated with TiN to reduce SEY. Customized masks were used to produce coating strips of 1 cm x 5 cm with 1 to 1.5 mm separation among the strips. The masks maximized the coated area to more than 80%, while minimizing the eddy current effect to the kicker rise time. The coating method, as well as the physical and electromagnetic properties of the coatings for both types of kickers will be summarized, with emphasis on the effect to the beam and the electron cloud buildup.

†Corresponding author email: hseuh@bnl.gov.

 
RPPT065 Beam Loss Estimates and Control for the BNL Neutrino Facility 3647
 
  • W.-T. Weng, J. Beebe-Wang, Y.Y. Lee, D. Raparia, N. Tsoupas, J. Wei, S.Y. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: This work is performed under the auspices of the US DOE.

BNL plans to upgrade the AGS proton beam from the current 0.14 MW to higher than 1.0 MW for a very long baseline neutrino oscillation experiment. This increase in beam power is mainly due to the faster repetition rate of the AGS by a new 1.5 GeV superconductiong linac as injector, replacing the existing booster. The requirement for low beam loss is very important both to protect the beam component, and to make the hands-on maintenance possible. In this report, the design considerations for achieving high intensity and low loss will be presented. We start by specifying the beam loss limit at every physical process followed by the proper design and parameters for realising the required goals. The process considered in this paper include the emittance growth in the linac, the H- injection, the transition crossing, the ecectron cloud effect, the coherent instabilities, and the extraction losses. Collimation and shielding are also presented.

 
FPAE050 Injector Linac for the BNL Super Neutrino Beam Project 3129
 
  • D. Raparia, J.G. Alessi, A. Ruggiero, W.-T. Weng
    BNL, Upton, Long Island, New York
 
  Funding: This work was performed under the auspices of the U.S. DOE, Contract No. DE-AC02-98H10886.

BNL plans to upgrade the AGS proton beam from the current 0.14 MW to higher than 1.0 MW and beyond for such a neutrino facility. We have examined possible upgrades to the AGS complex that would meet the requirements of the proton beam for a 1.0 MW neutrino superbeam facility. We are proposing to replace part of the existing 200 MeV linac with coupled cavity structure from 116 MeV to 400 MeV and then add additional 1.1 GeV superconducting linac to reach a final energy of 1.5 GeV for direct H- injection into the AGS. We will present possible choices for the upgrade and our choice and its design.

 
FPAP024 Electron Cloud in the Collimator- and Injection- Region of the Spallation Neutron Source's Accumulator Ring 1865
 
  • L. Wang, H.-C. Hseuh, Y.Y. Lee, D. Raparia, J. Wei
    BNL, Upton, Long Island, New York
  • S.M. Cousineau, S. Henderson
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

The beam loss along the Spallation Neutron Source’s (SNS’s) accumulator ring is mainly located at the collimator region. From the ORBIT simulation, the peak power deposition at the three collimators is about 500, 350 and 240 W/m, respectively. Therefore, a sizeable number of electrons may be accumulated at this region due to the great beam loss. This paper simulated the electron cloud at the collimator region and the possible remedy.