Author: Werner, M.
Paper Title Page
MOP019 First Test with MicroTCA Based Cavity BPM Electronics for the European XFEL and FLASH 70
 
  • B. Lorbeer, H.T. Duhme, I. Krouptchenkov, T. Lensch, D. Lipka, M. Werner
    DESY, Hamburg, Germany
 
  The European X-ray free-electron laser (E-XFEL) and the FLASH2020+ project for the free electron laser Hamburg (FLASH) at DESY in Hamburg, Germany foresee several machine upgrades in the years to come. At FLASH a whole undulator section in a shutdown starting in summer 2024 and finishing in autumn 2025 is going to be rebuild. Existing button beam position monitors installed in this section of the machine do not deliver sufficient signal strength for future required resolution specification and orbit feedback optimization for machine operation. The resolution limitations will be overcome by replacing the button-based beam position monitors with in-house developed cavity beam position monitors and compact microTCA based radio frequency receiver read-out electronics. The measurement system has been tested and evaluated in a test setup at FLASH.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-MOP019  
About • Received ※ 05 September 2023 — Revised ※ 08 September 2023 — Accepted ※ 21 September 2023 — Issue date ※ 30 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TU3I04 Comparison of Different Bunch Charge Monitors Used at the ARES Accelerator at DESY 169
 
  • T. Lensch, D. Lipka, Re. Neumann, M. Werner
    DESY, Hamburg, Germany
 
  The SINBAD (Short and INnovative Bunches and Ac-celerators at DESY) facility, also called ARES (Acceler-ator Research Experiment at SINBAD), is a conventional S-band linear RF accelerator allowing the production of lowcharge ultra-short electron bunches within a range of currently 0.01 pC to 250 pC. The R&D accelerator also hosts various experiments. Especially for the medical eFLASH experiment an absolute, non-destructive charge measurement is needed. Therefore different types of monitors are installed along the 45 m long machine: A new Faraday Cup design had been simulated and realized. Further two resonant cavities (Dark Current monitors) and two beam charge transfomers (Toroids) are installed. Both, Dark Current Monitors and Toroids are calibrated independently with laboratory setups. At the end of the accelerator a Bergoz Turbo-ICT is installed. This paper will give an overview of the current installations of charge monitors at ARES and compare their measured linearity and resolution.  
slides icon Slides TU3I04 [4.553 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-TU3I04  
About • Received ※ 01 September 2023 — Revised ※ 11 September 2023 — Accepted ※ 12 September 2023 — Issue date ※ 29 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP037 Charge Measurement with Resonators at ARES 273
 
  • D. Lipka, T. Lensch, Re. Neumann, M. Werner
    DESY, Hamburg, Germany
 
  The ARES facility (Accelerator Research Experiment at SINBAD) is an accelerator to produce low charge ultra-short electron bunches within a range of currently 0.5 pC to 200 pC. Especially for eFLASH experiments at ARES an absolute, non-destructive charge measurement is required. To measure an absolute charge of individual bunches different types of monitors are installed. A destructive Faraday Cup is used as reference charge measurement device. To measure the charge non-destructively 2 Toroids, 1 Turbo-ICT and 2 cavity monitors are installed. The latter system consists of the cavity, front-end electronics with logarithmic detectors and µTCA ADCs. The laboratory calibration of the cavity system is performed by using an arbitrary waveform generator which generate the same waveform like the cavity with beam. This results in a non-linear look-up table used to calculate the ADC amplitude in charge values independent of beam-based calibration. The measured charges from the cavity monitors agree very well within few percent in comparison with the Faraday Cup results.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-TUP037  
About • Received ※ 01 September 2023 — Revised ※ 08 September 2023 — Accepted ※ 14 September 2023 — Issue date ※ 02 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)