JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for TU3I04: Comparison of Different Bunch Charge Monitors Used at the ARES Accelerator at DESY

@inproceedings{lensch:ibic2023-tu3i04,
  author       = {T. Lensch and D. Lipka and Re. Neumann and M. Werner},
  title        = {{Comparison of Different Bunch Charge Monitors Used at the ARES Accelerator at DESY}},
% booktitle    = {Proc. IBIC'23},
  booktitle    = {Proc. 12th Int. Beam Instrum. Conf. (IBIC'23)},
  eventdate    = {2023-09-10/2023-09-14},
  pages        = {169--173},
  paper        = {TU3I04},
  language     = {english},
  keywords     = {electron, experiment, vacuum, cavity, FEL},
  venue        = {Saskatoon, Canada},
  series       = {International Beam Instrumentation Conference},
  number       = {12},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {12},
  year         = {2023},
  issn         = {2673-5350},
  isbn         = {978-3-95450-236-3},
  doi          = {10.18429/JACoW-IBIC2023-TU3I04},
  url          = {https://jacow.org/ibic2023/papers/tu3i04.pdf},
  abstract     = {{The SINBAD (Short and INnovative Bunches and Ac-celerators at DESY) facility, also called ARES (Acceler-ator Research Experiment at SINBAD), is a conventional S-band linear RF accelerator allowing the production of lowcharge ultra-short electron bunches within a range of currently 0.01 pC to 250 pC. The R&D accelerator also hosts various experiments. Especially for the medical eFLASH experiment an absolute, non-destructive charge measurement is needed. Therefore different types of monitors are installed along the 45 m long machine: A new Faraday Cup design had been simulated and realized. Further two resonant cavities (Dark Current monitors) and two beam charge transfomers (Toroids) are installed. Both, Dark Current Monitors and Toroids are calibrated independently with laboratory setups. At the end of the accelerator a Bergoz Turbo-ICT is installed. This paper will give an overview of the current installations of charge monitors at ARES and compare their measured linearity and resolution.}},
}