Keyword: SRF
Paper Title Other Keywords Page
TUA2WC02 Status of R&D on New Superconducting Injector Linac for Nuclotron-NICA cavity, linac, proton, rfq 83
 
  • S.M. Polozov, M. Gusarova, T. Kulevoy, M.V. Lalayan, T.A. Lozeeva, S.V. Matsievskiy, R.E. Nemchenko, A.V. Samoshin, V.L. Shatokhin, N.P. Sobenin, D.V. Surkov, K.V. Taletskiy, V. Zvyagintsev
    MEPhI, Moscow, Russia
  • A.A. Bakinowskaya, V.S. Petrakovsky, I.L. Pobol, A.I. Pokrovsky, D.A. Shparla, A. Shvedau, S.V. Yurevich, V.G. Zaleski
    Physical-Technical Institute of the National Academy of Sciences of Belarus, Minsk, Belarus
  • M.A. Baturitski, S.A. Maksimenko
    INP BSU, Minsk, Belarus
  • A.V. Butenko, N. Emelianov, A.O. Sidorin, E. Syresin, G.V. Trubnikov
    JINR, Dubna, Moscow Region, Russia
  • S.E. Demyanov
    Scientific-Practical Materials Research Centre of the National Academy of Sciences of Belarus, Minsk, Belarus
  • V.A. Karpovich
    BSU, Minsk, Belarus
  • T. Kulevoy
    ITEP, Moscow, Russia
  • V.N. Rodionova
    Belarussian State University, Scientific Research Institute of Nuclear Problems, Minsk, Belarus
  • V. Zvyagintsev
    TRIUMF, Vancouver, Canada
 
  The progress in R&D of QWR and HWR superconducting cavities will be discussed. These cavities are designed for the new injection linac constructed for Nuclotron-NICA complex at JINR. The goal of new linac is to accelerate protons up to 25 MeV (and up to 50 MeV at the second stage) and light ions to ~7.5 MeV/u for Nuclotron-NICA injection. Current results of beam dynamics simulations, SC cavities design and SRF technology development will be presented in this report.  
slides icon Slides TUA2WC02 [3.782 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HB2018-TUA2WC02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUA2WC03 Studies on Superconducting Deuteron Driver Linac for BISOL cavity, linac, ISOL, emittance 88
 
  • F. Zhu, M. Chen, A.Q. Cheng, J.K. Hao, H.P. Li, S.W. Quan, F. Wang
    PKU, Beijing, People's Republic of China
 
  Funding: Work supported by National Basic Research Project (No. 2014CB845504)
Beijing isotope separation on line type rare ion beam facility (BISOL) for both basic science and applications is a project proposed by China Institute of Atomic Energy and Peking University. Deuteron driver accelerator of BISOL would adopt superconducting half wave resonators (HWRs) with low beta and high current. The HWR cavity performance and the beam dynamic simulation of the superconducting deuteron driver accelerator will be presented in this paper.
 
slides icon Slides TUA2WC03 [10.028 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HB2018-TUA2WC03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)