Paper | Title | Page |
---|---|---|
MOPEA028 | Present Status of the KEK PF-Ring and PF-AR | 136 |
|
||
In KEK, two synchrotron light sources have been operated. One is the 2.5 GeV Photon Factory storage ring (PF-ring) and the other is the 6.5 GeV Photon Factory advanced ring (PF-AR). In this paper, present operational status and recent R&D activities such as fast local bump system for helicity switching undulator, hybrid injection system, pulsed-sextupole injection, etc. Futhermore, upgrade plan towards the top-up injection of 6.5 GeV PF-AR ring is underway. Construction of the straight injection tunnel from linac to PF-AR will be started next fiscal year. Design detail and strategy for the injection scheme will be reported. | ||
MOPFI019 | Beam Generation from a 500 kV DC Photoemission Electron Gun | 321 |
|
||
Funding: This work is supported by MEXT Quantum Beam Technology Program and partially supported by JSPS Grants-in-Aid for Scientific Research in Japan (23540353). The next generation light source such as X-ray FEL oscillator requires high brightness electron gun with megahertz repetition rate. We have developed a DC photoemission electron gun at JAEA for the compact energy recovery linac (cERL) light source under construction at KEK. This DC gun employs a segmented insulator with guard rings to protect the insulator from field emission generated from central stem electrode. We have successfully applied 500-kV on the ceramics with a cathode electrode in place and generated beam from the 500kV DC photoemission gun in October 2012. Details of the beam generation test will be presented. |
||
MOPME058 | DEVELOPMENT OF A CAVITY-TYPE BEAM POSITION MONITORS WITH HIGH RESOLUTION FOR ATF2 | 604 |
|
||
We have developed a high resolution beam position monitors for ATF2 at KEK, which is an accelerator test facility for International Linear Collider(ILC). The main goals of ATF2 are achievement of 37nm beam size and 2nm beam position resolution for beam stabilization. For these goals, low-Q IP-BPM(Interaction Point Beam Position Monitor) with latency of 20 ns are being developed. In this paper, we will describe about design of Low-Q IP-BPM, the basics test results as RF test and BPM sensitivity test. Electronics for Low-Q IP-BPM will be also described. | ||
MOPWA058 | Cavity Beam Position Monitor at Interaction Point Region of Accelerator Test Facility 2 | 807 |
|
||
Nanometre resolution cavity beam position monitors (BPMs) have been developed to measure the beam position and linked to a feedback system control the beam position stability within few nanometres in the vertical direction at the focus, or interaction point (IP), of Accelerator Test Facility 2 (ATF2). In addition, for feedback applications a lower-Q and hence faster decay time system is desirable. Two IPBPMs have been installed inside of IP chamber at the ATF2 focus area. To measure the resolution of IPBPMs two additional C-band cavity BPMs have been installed one upstream and one downstream of the IP. One cavity BPM has been installed at an upstream image point of IP. The performance of the BPMs is discussed and the correlation between IP and image point positions is presented along with a discussion of using these BPMs for position stabilisation at the IP. | ||
WEPWA015 | Progress in Construction of the 35 MeV Compact Energy Recovery Linac at KEK | 2159 |
|
||
The 35-MeV Compact Energy Recovery Linac (the Compact ERL or cERL) is under construction at the High Energy Accelerator Research Organization (KEK) in Japan. With the Compact ERL, we aim at establishing cutting-edge technologies for the GeV-class ERL-based synchrotron light source. To install the accelerator components of the cERL, we have constructed a shielding room having an area of about 60 m x 20 m. We have then installed a 500-kV DC photocathode gun, a 5-MV superconducting (SC) cryomodule for the injector, a 30-MV SC cryomodule for the main linac, and some of the other components. High-power test on the main SC cryomodule is underway in December, 2012. High-power or high-voltage tests on the injector cryomodule and on the DC gun are planned during January to March, 2013. An injector of the Compact ERL will be commissioned in April, 2013. We report the newest status of its construction. | ||
WEPWA017 | Development of Laser-Compton X-ray Source using Optical Storage Cavity | 2165 |
|
||
Funding: Work supported by the Quantum Beam Technology Program of MEXT and JSPS Grant-in-Aid for Young Scientists (B) 23740203 We have been developing a pulsed-laser storage technique in a super-cavity for a compact x-ray sources. The pulsed-laser super-cavity enables to make high peak power and small waist laser at the collision point with the electron beam. We already obtained a pulse-train x-rays through the laser-Compton scattering between a multi-bunch electron beam and an optical super-cavity. And also, we performed a X-ray imaging via laser-Compton X-ray. On these successful results, we decided to upgrade our system for increasing X-ray flux by 3-order of magnitudes for practical use. For an optical cavity, we designed 4-mirrors bow-tie cavity in order to increase the power. On the other hand, electron accelerator was also upgraded to increase the bunch number in the train. We use 3.6cells rf-gun and 12cell standing wave booster linac. As a result, 2-order increase of X-ray flux was achieved. Design of upgraded our laser-Compton X-ray source, the results of X-ray experiments and future prospective will be presented at the conference. |
||