TUP018 New SRF Structures Processed at the ANL Cavity Processing Facility 434
 
  • T. Reid, Z.A. Conway, B.M. Guilfoyle, M. Kedzie, M.P. Kelly, M.K. Ng
    ANL, Lemont, Illinois, USA
 
  Argonne National Laboratory (ANL) has extended high quality cavity processing techniques based on those developed for the International Linear Collider to several more complex superconducting RF cavities. Recently, these include a bunch lengthening harmonic cavity, a crabbing rf-dipole cavity, a compact half-wave cavity, and both medium and high frequency elliptical cavities. These systems are an improved version of the one originally developed for 1.3 GHz 9-cell cavities and include a second rotating electrical contact that can support multiple cathodes, necessary for optimum polishing in difficult cavity geometries. All include the possibility for external water cooling.  
poster icon Poster TUP018 [4.322 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP018  
About • paper received ※ 28 June 2019       paper accepted ※ 12 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP102 Superconducting Harmonic Cavity for Bunch Lengthening in the APS Upgrade 715
 
  • M.P. Kelly, Z.A. Conway, M. Kedzie, S.W.T. MacDonald, T. Reid, U. Wienands, G.P. Zinkann
    ANL, Lemont, Illinois, USA
 
  A superconducting cavity based Bunch Lengthening System is under construction for the Argonne’s Advanced Photon Source (APS) Upgrade. The system will reduce the undesirable effects of Touschek scattering on the beam lifetime by providing bunch lengthening in the longitudinal direction by 2-4 times. The major technical components for the beam-driven 1.4 GHz fourth harmonic superconducting cryomodule are in hand and have been tested. These include a superconducting cavity, cw rf power couplers, a pneumatic cavity slow tuner and beamline higher-order mode absorbers. Initial assembly and engineering testing of the cryomodule is underway. Final integrated testing will be complete in 2021. Transportation to and commissioning in the APS is planned for 2022-23.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP102  
About • paper received ※ 08 July 2019       paper accepted ※ 12 July 2019       issue date ※ 14 August 2019  