MOPB031 Fabrication and Cold Test Result of FRIB β=0.53 Pre-production Cryomodule 120
 
  • H. Ao, J. Asciutto, B. Bird, N.K. Bultman, E.E. Burkhardt, F. Casagrande, C. Compton, K.D. Davidson, K. Elliott, A. Ganshyn, I. Grender, W. Hartung, L. Hodges, I.M. Malloch, S.J. Miller, D.G. Morris, P.N. Ostroumov, J.T. Popielarski, L. Popielarski, M.A. Reaume, K. Saito, M. Shuptar, S. Stark, J.D. Wenstrom, M. Xu, T. Xu, Z. Zheng
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
The driver linac for the Facility for Rare Isotope Beams (FRIB) comprises four kinds of cavities (β=0.041, 0.085, 0.29, and 0.53) and six types of cryomodules including matching modules. FRIB has completed the fabrication and the cold test of a β=0.53 pre-production cryomodule, which is the first prototype for a half-wave (β=0.29 and 0.53) cavity. This paper describes the fabrication and the cold test result of the β=0.53 pre-production cryomodule including lessons learned.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB031  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THYA01 Performance Testing of FRIB Early Series Cryomodules 715
 
  • J.T. Popielarski, C. Compton, A. Ganshyn, W. Hartung, D. Luo, S.J. Miller, D.G. Morris, P.N. Ostroumov, L. Popielarski, K. Saito, S. Shanab, S. Stark, T. Xu, S. Zhao, Z. Zheng
    FRIB, East Lansing, USA
 
  Funding: U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661.
Construction of a new accelerator for nuclear physics research, the Facility for Rare Isotope Beams (FRIB), is underway at Michigan State University (MSU). The FRIB linac will use superconducting resonators at an operating temperature of 2 K to accelerate ions to 200 MeV per nucleon. The linac requires 106 quarter wave resonators (80.5 MHz, β = 0.043 and 0.086) and 248 half wave resonators (322 MHz, β = 0.29 and 0.54), all made from sheet Nb. Production resonators being delivered to MSU by cavity vendors. At MSU, the resonators are etched, rinsed, and tested in MSU's certification test facility. Certification testing is done before the installation of the high-power input coupler and the tuner. After certification, the resonators are tested in the cryomodule before installation into the FRIB tunnel. The cryomodule test goals are to verify integrated operation of the resonators, RF couplers, tuners, RF controls, and superconducting solenoids. To date, 10 cryomodules out of 48 have been fabricated, and 8 of the cryomodules have been certified. Cryomodule test results are presented in this paper.
 
slides icon Slides THYA01 [31.165 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-THYA01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)