Author: Wang, G.W.
Paper Title Page
MOXA07 Development of the C-ADS SRF Accelerator at IHEP 19
 
  • F. Yan, L. Bian, J.S. Cao, Y. Chen, Y.L. Chi, J.P. Dai, L. Dong, L.L. Dong, Y.Y. Du, H.F.S. Feisi, Y. Gao, R. Ge, H. Geng, D.Z. Guo, D.Y. He, J. He, T.M. Huang, X. Jing, B. Li, H. Li, L. Li, S.P. Li, H.Y. Lin, F. Liu, R.L. Liu, F. Long, Y.H. Lu, H.Z. Ma, Q. Ma, X. Ma, C. Meng, Z.H. Mi, H.F. Ouyang, W.M. Pan, S. Pei, Q.L. Peng, X.H. Peng, P. Sha, H. Shi, P. Su, Y.F. Sui, L.R. Sun, X.T. Sun, G.W. Wang, J.L. Wang, S.C. Wang, G. Wu, O. Xiao, X.C. Yang, Q. Ye, R. Ye, L. Yu, X.Y. Zhang, X.Y. Zhao, Y.L. Zhao, Y. Zhao, Z.H. ZhenHua, N. Zhou, Z.S. Zhou
    IHEP, Beijing, People's Republic of China
  • H.Y. Zhu
    Institute of High Energy Physics (IHEP), People's Republic of China
 
  Funding: CAS Strategic Priority Research Program-Future Advanced Nuclear Fission Energy (Accelerator-Driven Sub-critical System) and National Natural Science Foundation of China, under contract NO. 11405190
The 10 MeV accelerator-driven subcritical system (ADS) Injector I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The ion source was installed since April of 2014, periods of commissioning are regularly scheduled between installation phases of the rest of the injector. Early this year, continuous wave (CW) proton beam has been successfully obtained with energy of 10MeV and average beam current around 2 mA, the single spoke cavities with smallest developed beta (βg=0.12) were applied and successfully commissioned. Single spoke cavities with higher beta (βg=0.21) were also adopted for the last cryomodule of 25MeV proton linac, and 170uA CW proton beam were shooting through recently. This contribution reports the details of the development of the C-ADS SRF accelerator at IHEP and the challenges of the CW machine commissioning
 
slides icon Slides MOXA07 [5.605 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOXA07  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPB070 The Improvement of the Power Coupler for CADS SC Spoke Cavities 220
 
  • T.M. Huang, B. Bing, X. Chen, H.Y. Lin, Q. Ma, F. Meng, W.M. Pan, G.W. Wang
    IHEP, Beijing, People's Republic of China
  • K.X. Gu
    Institute of High Energy Physics (IHEP), Chinese Academy of Sciences, Beijing, People's Republic of China
 
  Twenty superconducting spoke cavities mounted in three cryomodules (CM1, CM2 and CM4) were in-stalled in the CADS, a test facility of 10 mA, 25 MeV CW proton linac. Each cavity was equipped with one coaxial type fundamental power coupler (FPC). Fatal window crack was observed during the test cryomod-ule (TCM) commissioning. A series of experiments were subsequently implemented and eventually at-tributed the window crack to the electron bombard-ment from cavity field emission (FE). Improvements covering the coupler cleaning and assembly proce-dure, the structure and position modifications were thus implemented, aiming to reduce the cavity contam-ination and avoid the window damaged by cavity FE electrons. This paper will describe how the coupler window damaged by cavity field emission and the improve-ments for cure. In addition, the performances of FPCs for CM1, CM2 and CM4 were compared.  
poster icon Poster MOPB070 [0.613 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB070  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPB034 The 166.6 MHz Proof-of-principle SRF Cavity for HEPS-TF 454
 
  • P. Zhang, J. Dai, H.X. Hao, T.M. Huang, Z.Q. Li, H.Y. Lin, Q. Ma, F. Meng, Z.H. Mi, W.M. Pan, Y. Sun, G.W. Wang, Q.Y. Wang, X.Y. Zhang
    IHEP, Beijing, People's Republic of China
 
  Funding: This work has been supported by HEPS-TF project and also partly supported by Pioneer "Hundred Talents Program" of Chinese Academy of Sciences.
The 166.6 MHz superconducting RF cavities have been proposed for the High Energy Photon Source (HEPS), a 6 GeV kilometer-scale light source. The cavity is of quarter-wave type made of bulk niobium with β =1. Each cavity will be operated at 4 K providing 1.2 MV accelerating voltage and 145 kW of power to the electron beam. During the HEPS - Test Facility (HEPS-TF) phase, a proof-of-principle cavity of 166.6 MHz has been designed in IHEP and manufactured in Beijing. The subsequent BCP was conducted in Ningxia, while HPR, cleanroom assembly and 120 degree baking was done in IHEP. The cavity was finally vertical tested at both 4K and 2K in IHEP. The cavity Q0 at nominal gradient at 4 K was measured to be 2.4·109 with Epeak of 42 MV/m and Bpeak of 65 mT. The maximum Epeak and Bpeak reached 86MV/m and 131 mT respectively at both 4 K and 2 K, and the corresponding Q0 was measured to be 5.108 (4 K) and 3.3·109 (2 K). The residual surface resistance was measured to be 2.3 nOhm.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-TUPB034  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEYA04
The R&D on TEM-type SRF Cavities for High-current Applications at IHEP  
 
  • F.S. He, J.P. Dai, J. Dai, N. Gan, H.X. Hao, H. Huang, T.M. Huang, X. Huang, Z.Q. Li, H.Y. Lin, R.L. Liu, Q. Ma, X. Ma, F. Meng, Z.H. Mi, W.M. Pan, X.H. Peng, P. Sha, Y. Shao, G.W. Wang, Q.Y. Wang, Z. Xue, P. Zhang, X.Y. Zhang
    IHEP, Beijing, People's Republic of China
 
  Funding: This work has been supported partly by Pioneer 'Hundred Talents Program' of Chinese Academy of Science.
The recent SRF R&D efforts on TEM-type cavities at IHEP have been strongly linked to two large projects: high current proton linac for ADS and High Energy Photon Source (HEPS). A CW 10 MeV proton injector and part of the 25 MeV main linac for the CADS project are developed at IHEP. 14 SRF spoke012 cavities for the injector have been commissioned with 10.6mA proton beam at 10.67MeV; while 6 SRF spoke021 cavities for the main linac have been assembled into cryomodule in Lanzhou. 166.6 MHz quarter-wave β=1 cavities were proposed for HEPS storage ring, required by the planned on-axis beam accumulation injection scheme. Each 166.6 MHz cavity will be operated at 4 K providing 1.2 MV accelerating voltage and 145 kW of power to the electron beam. A proof-of-principle cavity has been manufactured and vertical tested recently with a success. HOM damping is currently being designed. The development progress of the 6 types of spoke, HWR, QWR cavities, and their ancillaries, as well as the spoke cavity performance during beam operation, will be addressed.
 
slides icon Slides WEYA04 [2.904 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)