Paper | Title | Page |
---|---|---|
MOYA04 |
Set of RF Parameters for the FCC-ee Machines | |
|
||
The FCC-ee RF system must handle beams at different energies and beam intensities ranging from the high energy case of a few mA at 175 GeV to the heavily beam loaded situation at 1.45 A and 45.5 GeV. Higher order mode power will be a major issue at the highest beam intensities. A conceptual design of the FCC RF system is proposed along with highlights of specific R&D topics to reach the design performance. Challenges related to RF structure design, RF powering and higher order modes are addressed. Breakeven point between bulk Nb and Nb/Cu technologies are discussed. | ||
![]() |
Slides MOYA04 [6.209 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUXAA02 | HIE Isolde Cavity Production & Cryomodule Commissioning, Lessons Learned | 338 |
|
||
The lessons learned during the HIE Isolde Cavity Production, the Cryo Module Assembly and Commissioning will be presented | ||
![]() |
Slides TUXAA02 [8.191 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-TUXAA02 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |