Paper |
Title |
Page |
TUY01 |
Status and Perspectives of the VEPP-2000 Complex |
6 |
|
- Yu. A. Rogovsky, D.E. Berkaev, A.S. Kasaev, I. Koop, A.N. Kyrpotin, A.P. Lysenko, E. Perevedentsev, V.P. Prosvetov, A.L. Romanov, A.I. Senchenko, P.Yu. Shatunov, Y.M. Shatunov, D.B. Shwartz, A.N. Skrinsky, I.M. Zemlyansky, Yu.M. Zharinov
BINP SB RAS, Novosibirsk, Russia
- Yu. A. Rogovsky
NSU, Novosibirsk, Russia
|
|
|
The VEPP-2000 is a modern electron-positron collider at BINP. Last season in 2012–2013 was dedicated to the energy range of 160520 MeV per beam. The application of round colliding beams concept along with the accurate orbit and lattice correction yielded the high peak luminosity of 1.21031 cm-2s−1 at 500 MeV with average luminosity of 0.91031 cm-2s−1 per run. The peak luminosity limited only by beam-beam effects, while average luminosity – by present lack of positrons in whole energy range of 1601000 MeV. To perform high luminosity at high energies with small dead time the top-up injection is needed. At present new electron and positron injection complex at BINP is commissioned and ready to feed VEPP-2000 collider with intensive beams with energy of 450 MeV. Last calendar 2014 year was dedicated to the full/partial upgrade of complex's main parts.
|
|
|
Slides TUY01 [4.152 MB]
|
|
|
FRCA01 |
Cooling Storage Ring CR of the FAIR Facility - Status and Perspectives |
456 |
|
- Yu. A. Rogovsky, D.E. Berkaev, A.S. Kasaev, E.S. Kazantseva, I. Koop, A.A. Krasnov, A.V. Semenov, P.Yu. Shatunov, D.B. Shwartz, A.A. Starostenko
BINP SB RAS, Novosibirsk, Russia
- U. Blell, C. Dimopoulou, A. Dolinskyy, O.E. Gorda, U. Laier, H. Leibrock, S.A. Litvinov, I. Schurig, U. Weinrich
GSI, Darmstadt, Germany
- Yu. A. Rogovsky
NSU, Novosibirsk, Russia
|
|
|
The Collector Ring (CR) is a wide aperture storage ring of the FAIR international facility (Darmstadt, Germany) dedicated to perform the stochastic precooling of secondary particles, rare isotopes or antiprotons. BINP (Novosibirsk) takes responsibility on the design and construction of almost all systems of the CR. The project status, preliminary design of main systems and results of the modelling of beam dynamics are presented.
|
|
|
Slides FRCA01 [2.060 MB]
|
|
|