A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Trbojevic, D.

Paper Title Page
MOPA009 Global Decoupling on the RHIC Ramp 659
 
  • Y. Luo, P. Cameron, A. Della Penna, W. Fischer, J.S. Laster, A. Marusic, F.C. Pilat, T. Roser, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC). In the polarized proton run, the betatron tunes are required to keep almost constant on the ramp to avoid spin resonance line crossing and the beam polarization loss. Some possible correction schemes on the ramp, like three-ramp correction, the coupling amplitude modulation and the coupling phase modulaxtion, have been found. The principles of these schemes are shortly reviewed and compared. Operational results of their applications on the RHIC ramps are given.

 
MOPA007 Polarized Proton Collisions at RHIC 600
 
  • M. Bai, L. Ahrens, J.G. Alessi, J. Beebe-Wang, M. Blaskiewicz, A. Bravar, J.M. Brennan, D. Bruno, G. Bunce, J.J. Butler, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fischer, G. Ganetis, C.J. Gardner, J. Glenn, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, J.S. Laster, R.C. Lee, A.U. Luccio, Y. Luo, W.W. MacKay, Y. Makdisi, G.J. Marr, A. Marusic, G.T. McIntyre, R.J. Michnoff, C. Montag, J. Morris, T. Nicoletti, P. Oddo, B. Oerter, O. Osamu, F.C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, K. Smith, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, K. Vetter, M. Wilinski, A. Zaltsman, A. Zelenski, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York
  • I.G. Alekseev, D. Svirida
    ITEP, Moscow
 
  Funding: The work was performed under the auspices of the U.S. Department of Energy and RIKEN Japan.

The Relativistic Heavy Ion Collider~(RHIC) provides not only collisions of ions but also collisions of polarized protons. In a circular accelerator, the polarization of polarized proton beam can be partially or fully lost when a spin depolarizing resonance is encountered. To preserve the beam polarization during acceleration, two full Siberian snakes were employed in RHIC to avoid depolarizing resonances. In 2003, polarized proton beams were accelerated to 100~GeV and collided in RHIC. Beams were brought into collisions with longitudinal polarization at the experiments STAR and PHENIX by using spin rotators. RHIC polarized proton run experience demonstrates that optimizing polarization transmission efficiency and improving luminosity performance are significant challenges. Currently, the luminosity lifetime in RHIC is limited by the beam-beam effect. The current state of RHIC polarized proton program, including its dedicated physics run in 2005 and efforts to optimize luminosity production in beam-beam limited conditions are reported.

 
MPPE030 Comparison of Off-Line IR Bump and Action-Angle Kick Minimization 2116
 
  • Y. Luo, F.C. Pilat, V. Ptitsyn, D. Trbojevic, J. Wei
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The interaction region bump (IR bump) nonlinear correction method has been used for the sextupole and octupole field error on-line corrections in the Relativistic Heavy Ion Collider (RHIC). Some differences were found for the sextupole and octupole corrector strengths between the on-line IR bump correction and the predictions from the action-angle kick minimization. In this report we compare the corrector strengths from these two methods based on the RHIC Blue ring lattice with the IR nonlinear modeling. The comparison confirms the differences between resulting corrector strengths. And the reason for the differences is found and discussed. It is followed by a further discussion of the operational IR bump applications to the octupole, and skew sextupole and skew quadrupole field error corrections.

 
TPAP051 Principle of Global Decoupling with Coupling Angle Modulation 3132
 
  • Y. Luo, S. Peggs, F.C. Pilat, T. Roser, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC). A new scheme coupling phase modulation is found. It introduces a rotating extra coupling into the coupled machine to detect the residual coupling. The eigentune responses are measured with a high resolution phase lock loop (PLL) system. From the minimum and maximum tune splits, the correction strengths are given. The time period occupied by one coupling phase modulation is less than 10 seconds. So it is a very promising solution for the global decoupling on the ramp. In this article the principle of the coupling phase modulation is given. The simulation with the smooth accelerator model is also done. The practical issues concerning its applications are discussed.

 
TPAP052 Possible Phase Loop for the Global Decoupling 3182
 
  • Y. Luo, P. Cameron, A. Della Penna, A. Marusic, S. Peggs, T. Roser, D. Trbojevic
    BNL, Upton, Long Island, New York
  • O.R. Jones
    CERN, Geneva
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

Besides two eigentunes Q1 and Q2 , two amplitude ratios r1 and r2 and two phase differences ∆ φ1 and ∆ φ2 are introduced for the global coupling observation. Simulations are carried out to check their behaviors in the process of the skew quadrupole strength scans. Some attractive features of the phase differences ∆ φ1,2 have been found, which are possibly useful for the global decoupling phase loop, or future global decoupling feedback. Analytical descriptions to these 6 quantities are described in the Twiss parameters through the linear coupling's action-angle parameterization, or in coupling coefficient through the linear coupling's Hamiltonian perturbation theory. Dedicated beam experiments are carried out at the Relativistic Heavy Ion Collider (RHIC) to check the global coupling observables from the phase lock loop (PLL) system. The six observables are measured under PLL driving oscillations during the 1-D and 2-D skew quadrupole scans. The experimental results are reported and discussions are given.

 
TPAP053 IR Optics Measurement with Linear Coupling's Action-Angle Parameterization 3218
 
  • Y. Luo, M. Bai, F.C. Pilat, T. Satogata, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The interaction region (IP) optics are measured with the two DX/BPMs close to the IPs at the Relativistic Heavy Ion Collider (RHIC). The beta functions at IP are measured with the two eigenmodes' phase advances between the two BPMs. And the beta waists are also determined through the beta functions at the two BPMs. The coupling parameters at the IPs are also given through the linear coupling's action-angle parameterization. All the experimental data are taken during the driving oscillations with the AC dipole. The methods to do these measurements are discussed. And the measurement results during the beta* squeezings are also presented.

 
TPAT094 Luminescence Beam Profile Monitor for the RHIC Polarized Hydrogen Jet Polarimeter 4293
 
  • N.P. Luciano, Y. Makdisi, A.N. Nass, P. Thieberger, D. Trbojevic, A. Zelenski
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under Contract Number DE-AC02-98CH10886 with the auspicies of the US Deparment of Energy.

This is the second polarized proton run in Relativistic Heavy Ion Collider (RHIC) with a new polarized proton jet target used to provide accurate polarization measurements. The interactions between the stored polarized protons with the polarized jet target will produce, in addition to polarization, optical signals due to exited states of Hydrogen or other molecules, ions, or atoms. Additional lenses, optical window, optical analyzer, and the CCD camera are added to the system to allow transfer and detection of optical signals from the interaction chamber. Oxygen or other elements (impurities) could be mixed within the jet target and affect the accuracy of the polarization measurements. It is important to have continuous information of the jet content without affecting the polarization measurements. The optical signals coming from the exited states of molecules, ions, and atoms from the polarized proton beam interaction with the jet will provide that. In addition, the beam profile might be obtained.

 
RPAP020 Fixed Field Alternating Gradient Accelerators (FFAG) for Fast Hadron Cancer Therapy 1667
 
  • E. Keil
    CERN, Geneva
  • A. Sessler
    LBNL, Berkeley, California
  • D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: * AMS supported by the U.S. Department of Energy under Contract No. DE-AC03-76SF0009

Cancer accelerator therapy continues to be ever more prevalent with new facilities being constructed at a rapid rate. Some of these facilities are synchrotrons, but many are cyclotrons and, of these, a number are FFAG cyclotrons. The therapy method of "spot scanning” requires many pulses per second (typically 200 Hz), which can be accomplished with a cyclotron (in contrast with a synchrotron). We briefly review commercial scaling FFAG machines and then discuss recent work on non-scaling FFAGs, which may offer the possibility of reduced physical aperture and a large dynamic aperture. However, a variation of tune with energy implies the crossing of resonances during the acceleration process. A design can be developed such as to avoid intrinsic resonances, although imperfection resonances must still be crossed. Parameters of two machines are presented; a 250 MeV proton therapy accelerator and a 400 MeV carbon therapy machine.

 
TPAP043 Electron Cooling of RHIC 2741
 
  • I. Ben-Zvi, D.S. Barton, D.B. Beavis, M. Blaskiewicz, J.M. Brennan, A. Burrill, R. Calaga, P. Cameron, X.Y. Chang, R. Connolly, Yu.I. Eidelman, A.V. Fedotov, W. Fischer, D.M. Gassner, H. Hahn, M. Harrison, A. Hershcovitch, H.-C. Hseuh, A.K. Jain, P.D.J. Johnson, D. Kayran, J. Kewisch, R.F. Lambiase, V. Litvinenko, W.W. MacKay, G.J. Mahler, N. Malitsky, G.T. McIntyre, W. Meng, K.A.M. Mirabella, C. Montag, T.C.N. Nehring, T. Nicoletti, B. Oerter, G. Parzen, D. Pate, J. Rank, T. Rao, T. Roser, T. Russo, J. Scaduto, K. Smith, D. Trbojevic, G. Wang, J. Wei, N.W.W. Williams, K.-C. Wu, V. Yakimenko, A. Zaltsman, Y. Zhao
    BNL, Upton, Long Island, New York
  • D.T. Abell, D.L. Bruhwiler
    Tech-X, Boulder, Colorado
  • H. Bluem, A. Burger, M.D. Cole, A.J. Favale, D. Holmes, J. Rathke, T. Schultheiss, A.M.M. Todd
    AES, Princeton, New Jersey
  • A.V. Burov, S. Nagaitsev
    Fermilab, Batavia, Illinois
  • J.R. Delayen, Y.S. Derbenev, L. W. Funk, P. Kneisel, L. Merminga, H.L. Phillips, J.P. Preble
    Jefferson Lab, Newport News, Virginia
  • I. Koop, V.V. Parkhomchuk, Y.M. Shatunov, A.N. Skrinsky
    BINP SB RAS, Novosibirsk
  • I.N. Meshkov, A.O. Sidorin, A.V. Smirnov, G.V. Troubnikov
    JINR, Dubna, Moscow Region
  • J.S. Sekutowicz
    DESY, Hamburg
 
  We report progress on the R&D program for electron-cooling of the Relativistic Heavy Ion Collider (RHIC). This electron cooler is designed to cool 100 GeV/nucleon at storage energy using 54 MeV electrons. The electron source will be a superconducting RF photocathode gun. The accelerator will be a superconducting energy recovery linac. The frequency of the accelerator is set at 703.75 MHz. The maximum electron bunch frequency is 9.38 MHz, with bunch charge of 20 nC. The R&D program has the following components: The photoinjector and its photocathode, the superconducting linac cavity, start-to-end beam dynamics with magnetized electrons, electron cooling calculations including benchmarking experiments and development of a large superconducting solenoid. The photoinjector and linac cavity are being incorporated into an energy recovery linac aimed at demonstrating ampere class current at about 20 MeV. A Zeroth Order Design Report is in an advanced draft state, and can be found on the web at http://www.agsrhichome.bnl.gov/eCool/.

Under contract with the U.S. Department of Energy, Contract Number DE-AC02-98CH10886.

 
TPAT093 Operations and Performance of RHIC as a Cu-Cu Collider 4281
 
  • F.C. Pilat, L. Ahrens, M. Bai, D.S. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fischer, G. Ganetis, C.J. Gardner, J. Glenn, M. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R.C. Lee, V. Litvinenko, Y. Luo, W.W. MacKay, G.J. Marr, A. Marusic, R.J. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, V. Ptitsyn, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, K. Vetter, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

The 5th year of RHIC operations, started in November 2004 and expected to last till June 2005, consists of a physics run with Cu-Cu collisions at 100 GeV/u followed by one with polarized protons at 100 GeV. We will address here overall performance of the RHIC complex used for the first time as a Cu-Cu collider, and compare it with previous operational experience with Au, PP and asymmetric d-Au collisions. We will also discuss operational improvements, such as a ?* squeeze to 85cm in the high luminosity interaction regions from the design value of 1m, system improvements and machine performance limitations, such as vacuum pressure rise, intra-beam scattering, and beam beam interaction.

 
TPAT095 Beam Induced Pressure Rise at RHIC 4308
 
  • S.Y. Zhang, J.G. Alessi, M. Bai, M. Blaskiewicz, P. Cameron, K.A. Drees, W. Fischer, J. Gullotta, P. He, H.-C. Hseuh, H. Huang, U. Iriso, R.C. Lee, V. Litvinenko, W.W. MacKay, T. Nicoletti, B. Oerter, S. Peggs, F.C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, L. Smart, L. Snydstrup, P. Thieberger, D. Trbojevic, L. Wang, J. Wei, K. Zeno
    BNL, Upton, Long Island, New York
 
  Beam induced pressure rise in RHIC warm sections is currently one of the machine intensity and luminosity limits. This pressure rise is mainly due to electron cloud effects. The RHIC warm section electron cloud is associated with longer bunch spacings compared with other machines, and is distributed non-uniformly around the ring. In addition to the countermeasures for normal electron cloud, such as the NEG coated pipe, solenoids, beam scrubbing, bunch gaps, and larger bunch spacing, other studies and beam tests toward the understanding and counteracting RHIC warm electron cloud are of interest. These include the ion desorption studies and the test of anti-grazing ridges. For high bunch intensities and the shortest bunch spacings, pressure rises at certain locations in the cryogenic region have been observed during the past two runs. Beam studies are planned for the current 2005 run and the results will be reported.

Work performed under the auspices of the US Department of Energy.

 
TPPP022 The eRHIC Ring-Ring Collider Design 1766
 
  • F. Wang, M. Farkhondeh, W.A. Franklin, W. Graves, R. Milner, C. Tschalaer, D. Wang, A. Zolfaghari, T. Zwart, J. van der Laan
    MIT, Middleton, Massachusetts
  • D.P. Barber
    DESY, Hamburg
  • J. Beebe-Wang, A. Deshpande, V. Litvinenko, W.W. MacKay, C. Montag, S. Ozaki, B. Parker, S. Peggs, V. Ptitsyn, T. Roser, S. Tepikian, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  The eRHIC ring-ring collider is the main design option of the future lepton-ion collider at Brookhaven National Laboratory. We report the revisions of the ring-ring collider design features to the baseline design presented in the eRHIC Zeroth Design Report (ZDR). These revisions have been made during the past year. They include changes of the interaction region which are required from the modifications in the design of the main detector. They also include changes in the lepton storage ring for high current operations as a result of better understandings of beam-beam interaction effects. The updated collider luminosity and beam parameters also take into account a more accurate picture of current and future operational aspects of RHIC.  
TPPP043 ERL Based Electron-Ion Collider eRHIC 2768
 
  • V. Litvinenko, L. Ahrens, M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, J.M. Brennan, R. Calaga, X.Y. Chang, A.V. Fedotov, W. Fischer, D. Kayran, J. Kewisch, W.W. MacKay, C. Montag, B. Parker, S. Peggs, V. Ptitsyn, T. Roser, A. Ruggiero, T. Satogata, B. Surrow, S. Tepikian, D. Trbojevic, V. Yakimenko, S.Y. Zhang
    BNL, Upton, Long Island, New York
  • A. Deshpande
    Stony Brook University, Stony Brook
  • M. Farkhondeh
    MIT, Middleton, Massachusetts
 
  Funding: Work performed under Contract Number DE-AC02-98CH10886 with the auspices of the US Department of Energy.

We present the designs of a future polarized electron-hadron collider, eRHIC* based on a high current super-conducting energy-recovery linac (ERL) with energy of electrons up to 20 GeV. We plan to operate eRHIC in both dedicated (electron-hadrons only) and parallel(with the main hadron-hadron collisions) modes. The eRHIC has very large tunability range of c.m. energies while maintaining very high luminosity up to 1034 cm-2 s-1 per nucleon. Two of the most attractive features of this scheme are full spin transparency of the ERL at all operational energies and the capability to support up to four interaction points. We present two main layouts of the eRHIC, the expected beam and luminosity parameter, and discuss the potential limitation of its performance.

*http://www.agsrhichome.bnl.gov/eRHIC/, Appendix A: Linac-Ring Option.