A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Tavares, P.F.

Paper Title Page
MPPE041 Orbit Stability at the Brazilian Synchrotron Light Source 2687
 
  • L. Liu, P.F. Tavares
    LNLS, Campinas
 
  A task force has been implemented at the Brazilian Synchrotron Light Laboratory to improve the beam orbit stability in the 1.37 GeV electron storage ring. The main problems faced during this year (2004) were due to the installation of a second RF cavity in the machine. We describe the main problems and the solutions that were implemented.  
MPPP020 RF Phase Modulation at the LNLS Electron Storage Ring 1686
 
  • N.P. Abreu, N.P. Abreu
    UNICAMP, Campinas, São Paulo
  • R.H.A. Farias, P.F. Tavares
    LNLS, Campinas
 
  Funding: FAPESP

In the Brazilian Electron Storage Ring, we observed that modulating the phase of accelerating fields at twice the synchrotron frequency suppressed remarkably well a longitudinal coupled-bunch mode of the beam driven by one of the RF cavities. We present results of a set of systematic measurements, in single and multi-bunch mode, aimed at characterizing the effects of the modulation on the beam. We also compare those experiments with the results of tracking simulations.

 
WOAB003 The Brazilian Synchrotron Light Source 325
 
  • P.F. Tavares, J.A. Brum
    LNLS, Campinas
 
  The Brazilian Synchrotron Radiation Laboratory has been operating the only light source in the southern hemisphere since July 1997. Over this 7 year period, approximately 22000 hours of beam time were delivered to users from all over Brazil as well as from 10 other countries. In this article, we report on the present configuration of the 1.37 GeV electron storage ring and associated instrumentation, describe recent improvements to the light source and analyze future prespectives including the installation of insertion devices and additional beamlines.  
WPAE007 Commissioning of the LNLS 2 T Hybrid Wiggler 1072
 
  • R.H.A. Farias, J.F. Citadini, M.J. Ferreira, J.G.R.S. Franco, A.F.A. Gouveia, L.C. Jahnel, L. Liu, R.T. Neuenschwander, X.R. Resende, P.F. Tavares, G. Tosin
    LNLS, Campinas
  • N.P. Abreu
    UNICAMP, Campinas, São Paulo
 
  Funding: MCT-CNPq, FAPESP.

We present the results of the commissioning of a 28-pole 2 T Hybrid Wiggler at the 1.37 GeV electron storage ring of the Brazilian Synchrotron Light Source. The wiggler will be used mainly for protein crystallography and was optimized for the production of 12 keV photons. The very high field and relatively large gap (22 mm) of this insertion device led to a magnetic design that includes large main and side magnets and heavily saturated poles. We present the results of the commissioning with beam, with special attention to the correction of the large linear tune-shift perturbations produced by the wiggler as well as on the reduction of beam lifetime at full energy. Since the injection at the LNLS storage ring is performed at 500 MeV we also focus on the effects of non-linearities and their impact on injection efficiency.