WPAT057 Overview of the Spallation Neutron Source Linac Low-Level RF Control System 3396
 
  • M. Champion, M.T. Crofford, K.-U. Kasemir, H. Ma, M.F. Piller
    ORNL, Oak Ridge, Tennessee
  • L.R. Doolittle, A. Ratti
    LBNL, Berkeley, California
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.

The design and production of the Spallation Neutron Source Linac Low-Level RF control system is complete, and installation will be finished in Spring 2005. The warm linac beam commissioning run in Fall 2004 was the most extensive test to date of the LLRF control system, with fourteen (of an eventual 96) systems operating simultaneously. In this paper we present an overview of the LLRF control system, the experience in designing, building and installing the system, and operational results.

 
WPAT058 Operational Experience with the Spallation Neutron Source High Power Protection Module 3411
 
  • M.T. Crofford, M. Champion, K.-U. Kasemir, H. Ma, M.F. Piller
    ORNL, Oak Ridge, Tennessee
 
  The Spallation Neutron Source (SNS) High Power Protection Module provides protection for the High Power RF Klystron and Distribution System and interfaces with the Low-Level Radio-Frequency (LLRF) Field Control Module (FCM). The fault detection logic is implemented in a single FPGA allowing modifications and upgrades to the logic as we gain operational experience with the LINAC RF systems. This paper describes the integration and upgrade issues we have encountered during the initial operations of the SNS systems.  
WPAT060 SNS Low-Level RF Control System: Design and Performance 3479
 
  • H. Ma, M. Champion, M.T. Crofford, K.-U. Kasemir, M.F. Piller
    ORNL, Oak Ridge, Tennessee
  • L.R. Doolittle, A. Ratti
    LBNL, Berkeley, California
 
  Funding: ORNL managed by UT-Battelle for US DOE.

A full digital Low-Level RF controller has been developed for SNS LINAC. Its design is a good example of a modern digital implementation of the classic control theory. The digital hardware for all the control and DSP functionalities, including the final vector modulation, is implemented on a single high-density FPGA. Two models for the digital hardware have been written in VHDL and Verilog respectively, based on a very low latency control algorithm, and both have been being used for supporting the testing and commissioning the LINAC to the date. During the commissioning, the flexibility and ability for precise controls that only digital design on a larger FPGA can offer has proved to be a necessity for meeting the great challenge of a high-power pulsed SCL.

 
WPAT062 The Spallation Neutron Source RF Reference System 3573
 
  • M.F. Piller, M. Champion, M.T. Crofford, H. Ma
    ORNL, Oak Ridge, Tennessee
  • L.R. Doolittle
    LBNL, Berkeley, California
 
  The Spallation Neutron Source (SNS) RF Reference System includes the master oscillator (MO), local oscillator(LO) distribution, and Reference RF distribution systems. Coherent low noise Reference RF signals provide the ability to control the phase relationships between the fields in the front-end and linear accelerator (linac) RF cavity structures. The SNS RF Reference System requirements, implementation details, and performance are discussed.  
TPPT039 Installation and Testing for Commissioning of Normal Conducting RF Linac Segment in the SNS 2571
 
  • Y.W. Kang, A.V. Aleksandrov, D.E. Anderson, M.M. Champion, M. Champion, M.T. Crofford, C. Deibele, G.W. Dodson, R.E. Fuja, P.E. Gibson, P.A. Gurd, T.W. Hardek, G.A. Johnson, P. Ladd, H. Ma, M.P. McCarthy, M.F. Piller, J.Y. Tang, A.V. Vassioutchenko, D.C. Williams
    ORNL, Oak Ridge, Tennessee
  • J.A. Billen, J.T. Bradley, D. Rees, W. Roybal, J. Stovall, K.A. Young, L.M. Young
    LANL, Los Alamos, New Mexico
 
  The Spallation Neutron Source (SNS) linac employs both normal conducting and superconducting linac cavities that will inject a 1.0 GeV proton beam into its accumulator ring. The normal conducting segment of this linac accelerates the beam to 185 MeV and employs one RFQ and six DTL cavities powered by seven 2.5 MW, 402.5 MHz klystrons and four CCL modules powered by four 5.0 MW, 805 MHz klystrons. Installation and RF conditioning of the RF equipment for normal conducting linac segment have been completed at ORNL with the support of LANL experts. After conditioning the accelerating structures, the linac has been successfully commissioned with beam. This paper reviews the experience in installation, RF conditioning, and commissioning of the normal conducting linac accelerating structures and RF subsystems. Checkout and operation of the RF systems and structures including conditioning procedure establishment and test results compared to the RF design specifications will be discussed.

SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos, and Oak Ridge.

 
WPAT085 4.2 K Operation of the SNS Cryomodules 4173
 
  • I.E. Campisi, S. Assadi, F. Casagrande, M. Champion, C. Chu, S.M. Cousineau, M.T. Crofford, C. Deibele, J. Galambos, P.A. Gurd, D.R. Hatfield, M.P. Howell, D.-O. Jeon, Y.W. Kang, K.-U. Kasemir, Z. Kursun, H. Ma, M.F. Piller, D. Stout, W.H. Strong, A.V. Vassioutchenko, Y. Zhang
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos and Oak Ridge.

The Spallation Neutron Source being built at the Oak Ridge National Laboratory employs eighty one 805 MHz superconducting cavities operated at 2.1 K for the H- beam to gain energy in the main linac from 187 MeV to about 1 GeV. The superconducting cavities and cryomodules with two different values of beta .61 and .81 have been designed and constructed at Jefferson Lab for operation at 2.1 K with unloaded Q’s in excess of 5x109. To gain experience in testing cryomodules in the SNS tunnel before the final commissioning of the 2.1 K Central Helium Liquefier, integration tests were conducted on a medium beta (.61) cryomodule at 4.2 K. This is the first time that a superconducting cavity system specifically designed for 2.1 K operation has been extensively tested at 4.2 K without superfluid helium. Even at 4.2 K it was possible to test all of the functional properties of the cryomodule and of the cavities. In particular, at a nominal BCS Qo˜7x108, simultaneous pulse operation of all three cavities in the cryomodule was achieved at accelerating gradients in excess of 12 MV/m. These conditions were maintained for several hours at a repetition rate of 30 pps. Details of the tests will be presented and discussed.