MOPA009 Global Decoupling on the RHIC Ramp 659
 
  • Y. Luo, P. Cameron, A. Della Penna, W. Fischer, J.S. Laster, A. Marusic, F.C. Pilat, T. Roser, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC). In the polarized proton run, the betatron tunes are required to keep almost constant on the ramp to avoid spin resonance line crossing and the beam polarization loss. Some possible correction schemes on the ramp, like three-ramp correction, the coupling amplitude modulation and the coupling phase modulaxtion, have been found. The principles of these schemes are shortly reviewed and compared. Operational results of their applications on the RHIC ramps are given.

 
MOPA007 Polarized Proton Collisions at RHIC 600
 
  • M. Bai, L. Ahrens, J.G. Alessi, J. Beebe-Wang, M. Blaskiewicz, A. Bravar, J.M. Brennan, D. Bruno, G. Bunce, J.J. Butler, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fischer, G. Ganetis, C.J. Gardner, J. Glenn, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, J.S. Laster, R.C. Lee, A.U. Luccio, Y. Luo, W.W. MacKay, Y. Makdisi, G.J. Marr, A. Marusic, G.T. McIntyre, R.J. Michnoff, C. Montag, J. Morris, T. Nicoletti, P. Oddo, B. Oerter, O. Osamu, F.C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, K. Smith, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, K. Vetter, M. Wilinski, A. Zaltsman, A. Zelenski, K. Zeno, S.Y. Zhang
    BNL, Upton, Long Island, New York
  • I.G. Alekseev, D. Svirida
    ITEP, Moscow
 
  Funding: The work was performed under the auspices of the U.S. Department of Energy and RIKEN Japan.

The Relativistic Heavy Ion Collider~(RHIC) provides not only collisions of ions but also collisions of polarized protons. In a circular accelerator, the polarization of polarized proton beam can be partially or fully lost when a spin depolarizing resonance is encountered. To preserve the beam polarization during acceleration, two full Siberian snakes were employed in RHIC to avoid depolarizing resonances. In 2003, polarized proton beams were accelerated to 100~GeV and collided in RHIC. Beams were brought into collisions with longitudinal polarization at the experiments STAR and PHENIX by using spin rotators. RHIC polarized proton run experience demonstrates that optimizing polarization transmission efficiency and improving luminosity performance are significant challenges. Currently, the luminosity lifetime in RHIC is limited by the beam-beam effect. The current state of RHIC polarized proton program, including its dedicated physics run in 2005 and efforts to optimize luminosity production in beam-beam limited conditions are reported.

 
MPPE030 Comparison of Off-Line IR Bump and Action-Angle Kick Minimization 2116
 
  • Y. Luo, F.C. Pilat, V. Ptitsyn, D. Trbojevic, J. Wei
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The interaction region bump (IR bump) nonlinear correction method has been used for the sextupole and octupole field error on-line corrections in the Relativistic Heavy Ion Collider (RHIC). Some differences were found for the sextupole and octupole corrector strengths between the on-line IR bump correction and the predictions from the action-angle kick minimization. In this report we compare the corrector strengths from these two methods based on the RHIC Blue ring lattice with the IR nonlinear modeling. The comparison confirms the differences between resulting corrector strengths. And the reason for the differences is found and discussed. It is followed by a further discussion of the operational IR bump applications to the octupole, and skew sextupole and skew quadrupole field error corrections.

 
TPAP051 Principle of Global Decoupling with Coupling Angle Modulation 3132
 
  • Y. Luo, S. Peggs, F.C. Pilat, T. Roser, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The global betatron decoupling on the ramp is an important issue for the operation of the Relativistic Heavy Ion Collider (RHIC). A new scheme coupling phase modulation is found. It introduces a rotating extra coupling into the coupled machine to detect the residual coupling. The eigentune responses are measured with a high resolution phase lock loop (PLL) system. From the minimum and maximum tune splits, the correction strengths are given. The time period occupied by one coupling phase modulation is less than 10 seconds. So it is a very promising solution for the global decoupling on the ramp. In this article the principle of the coupling phase modulation is given. The simulation with the smooth accelerator model is also done. The practical issues concerning its applications are discussed.

 
TPAP053 IR Optics Measurement with Linear Coupling's Action-Angle Parameterization 3218
 
  • Y. Luo, M. Bai, F.C. Pilat, T. Satogata, D. Trbojevic
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by U.S. DOE under contract No. DE-AC02-98CH10886.

The interaction region (IP) optics are measured with the two DX/BPMs close to the IPs at the Relativistic Heavy Ion Collider (RHIC). The beta functions at IP are measured with the two eigenmodes' phase advances between the two BPMs. And the beta waists are also determined through the beta functions at the two BPMs. The coupling parameters at the IPs are also given through the linear coupling's action-angle parameterization. All the experimental data are taken during the driving oscillations with the AC dipole. The methods to do these measurements are discussed. And the measurement results during the beta* squeezings are also presented.

 
TPAT093 Operations and Performance of RHIC as a Cu-Cu Collider 4281
 
  • F.C. Pilat, L. Ahrens, M. Bai, D.S. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fischer, G. Ganetis, C.J. Gardner, J. Glenn, M. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R.C. Lee, V. Litvinenko, Y. Luo, W.W. MacKay, G.J. Marr, A. Marusic, R.J. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, V. Ptitsyn, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, K. Vetter, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

The 5th year of RHIC operations, started in November 2004 and expected to last till June 2005, consists of a physics run with Cu-Cu collisions at 100 GeV/u followed by one with polarized protons at 100 GeV. We will address here overall performance of the RHIC complex used for the first time as a Cu-Cu collider, and compare it with previous operational experience with Au, PP and asymmetric d-Au collisions. We will also discuss operational improvements, such as a ?* squeeze to 85cm in the high luminosity interaction regions from the design value of 1m, system improvements and machine performance limitations, such as vacuum pressure rise, intra-beam scattering, and beam beam interaction.

 
WOAC007 Beam-Based Nonlinear Optics Corrections in Colliders 601
 
  • F.C. Pilat, Y. Luo, N. Malitsky, V. Ptitsyn
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the US Department of Energy

A method has been developed to measure and correct operationally the non-linear effects of the final focusing magnets in colliders, which gives access to the effects of multi-pole errors by applying closed orbit bumps, and analyzing the resulting tune and orbit shifts. This technique has been tested and used during 3 years of RHIC (the Relativistic Heavy Ion Collider at BNL) operations. I will discuss here the theoretical basis of the method, the experimental set-up, the correction results, the present understanding of the machine model, the potential and limitations of the method itself as compared with other non linear correction techniques.

 
TPAT095 Beam Induced Pressure Rise at RHIC 4308
 
  • S.Y. Zhang, J.G. Alessi, M. Bai, M. Blaskiewicz, P. Cameron, K.A. Drees, W. Fischer, J. Gullotta, P. He, H.-C. Hseuh, H. Huang, U. Iriso, R.C. Lee, V. Litvinenko, W.W. MacKay, T. Nicoletti, B. Oerter, S. Peggs, F.C. Pilat, V. Ptitsyn, T. Roser, T. Satogata, L. Smart, L. Snydstrup, P. Thieberger, D. Trbojevic, L. Wang, J. Wei, K. Zeno
    BNL, Upton, Long Island, New York
 
  Beam induced pressure rise in RHIC warm sections is currently one of the machine intensity and luminosity limits. This pressure rise is mainly due to electron cloud effects. The RHIC warm section electron cloud is associated with longer bunch spacings compared with other machines, and is distributed non-uniformly around the ring. In addition to the countermeasures for normal electron cloud, such as the NEG coated pipe, solenoids, beam scrubbing, bunch gaps, and larger bunch spacing, other studies and beam tests toward the understanding and counteracting RHIC warm electron cloud are of interest. These include the ion desorption studies and the test of anti-grazing ridges. For high bunch intensities and the shortest bunch spacings, pressure rises at certain locations in the cryogenic region have been observed during the past two runs. Beam studies are planned for the current 2005 run and the results will be reported.

Work performed under the auspices of the US Department of Energy.

 
FPAT003 Joining the RHIC Online and Offline Models 880
 
  • N. Malitsky, K.A. Brown, N. D'Imperio, A.V. Fedotov, J. Kewisch, A.U. Luccio, F.C. Pilat, V. Ptitsyn, T. Satogata, S. Tepikian, J. Wei
    BNL, Upton, Long Island, New York
  • R.M. Talman
    Cornell University, Laboratory for Elementary-Particle Physics, Ithaca, New York
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

The paper presents an interface encompassing the RHIC online ramp model and the UAL offline simulation framework. The resulting consolidated facility aims to minimize the gap between design and operational data, and to facilitate analysis of RHIC performance and future upgrades in an operational context. The interface is based on the Accelerator Description Exchange Format (ADXF), and represents a snapshot of the RHIC online model which is in turn driven by machine setpoints. This approach is also considered as an intermediate step towards integrating the AGS and RHIC modeling environments to produce a unified online and offline AGS model for operations.