Author: Zhang, R.
Paper Title Page
THPOST012 Achievement of 200, 000 Hours of Operation at KEK 7-GeV Electron 4-GeV Positron Injector Linac 2465
 
  • K. Furukawa, M. Akemoto, D.A. Arakawa, Y. Arakida, H. Ego, Y. Enomoto, T. Higo, H. Honma, N. Iida, K. Kakihara, T. Kamitani, H. Katagiri, M. Kawamura, S. Matsumoto, T. Matsumoto, H. Matsushita, K. Mikawa, T. Miura, F. Miyahara, H. Nakajima, T. Natsui, Y. Ogawa, S. Ohsawa, Y. Okayasu, T. Oogoe, M.A. Rehman, I. Satake, M. Satoh, Y. Seimiya, T. Shidara, A. Shirakawa, H. Someya, T. Suwada, M. Tanaka, D. Wang, Y. Yano, K. Yokoyama, M. Yoshida, T. Yoshimoto, R. Zhang, X. Zhou
    KEK, Ibaraki, Japan
  • Y. Bando
    Sokendai, Ibaraki, Japan
 
  KEK electron positron injector linac initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector linac started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the linac was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOST012  
About • Received ※ 20 May 2022 — Revised ※ 15 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 08 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPOTK059 Laser System for SuperKEKB RF Gun in Phase III Commissioning 2914
 
  • R. Zhang, M. Yoshida, X. Zhou
    KEK, Ibaraki, Japan
  • H.K. Kumano, N. Toyotomi
    Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
 
  In order to generate high quality electron beam with high charge in Phase III commissioning of SuperKEKB, some improvements have been done in Ytterbium doped fiber and Neodymium doped YAG (Nd:YAG) hybrid laser system. Spatial reshaping part for the 4th harmonic laser beam at 266 nm has been adopted to realize low emittance electron beam. In addition, for achieving continuous and stable laser operation, position feedback system has also been used to improve the pointing stability of laser beam. In 2021 commissioning of SuperKEKB, stable 2 nC electron beam is generated for high energy ring (HER) injection. Meanwhile, we achieved the best emittance results at B-sector of linac injector and BT line for comparable low injection background and higher injection efficiency. With the aim of generating higher charge electron beam with good quality in the following commissioning, a perspective towards the next step update for current laser system is also introduced.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THPOTK059  
About • Received ※ 08 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 04 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)