JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


RIS citation export for THPOST012: Achievement of 200, 000 Hours of Operation at KEK 7-GeV Electron 4-GeV Positron Injector Linac

TY  - CONF
AU  - Furukawa, K.
AU  - Akemoto, M.
AU  - Arakawa, D.A.
AU  - Arakida, Y.
AU  - Bando, Y.
AU  - Ego, H.
AU  - Enomoto, Y.
AU  - Higo, T.
AU  - Honma, H.
AU  - Iida, N.
AU  - Kakihara, K.
AU  - Kamitani, T.
AU  - Katagiri, H.
AU  - Kawamura, M.
AU  - Matsumoto, S.
AU  - Matsumoto, T.
AU  - Matsushita, H.
AU  - Mikawa, K.
AU  - Miura, T.
AU  - Miyahara, F.
AU  - Nakajima, H.
AU  - Natsui, T.
AU  - Ogawa, Y.
AU  - Ohsawa, S.
AU  - Okayasu, Y.
AU  - Oogoe, T.
AU  - Rehman, M.A.
AU  - Satake, I.
AU  - Satoh, M.
AU  - Seimiya, Y.
AU  - Shidara, T.
AU  - Shirakawa, A.
AU  - Someya, H.
AU  - Suwada, T.
AU  - Tanaka, M.
AU  - Wang, D.
AU  - Yano, Y.
AU  - Yokoyama, K.
AU  - Yoshida, M.
AU  - Yoshimoto, T.
AU  - Zhang, R.
AU  - Zhou, X.
ED  - Zimmermann, Frank
ED  - Tanaka, Hitoshi
ED  - Sudmuang, Porntip
ED  - Klysubun, Prapong
ED  - Sunwong, Prapaiwan
ED  - Chanwattana, Thakonwat
ED  - Petit-Jean-Genaz, Christine
ED  - Schaa, Volker R.W.
TI  - Achievement of 200, 000 Hours of Operation at KEK 7-GeV Electron 4-GeV Positron Injector Linac
J2  - Proc. of IPAC2022, Bangkok, Thailand, 12-17 June 2022
CY  - Bangkok, Thailand
T2  - International Particle Accelerator Conference
T3  - 13
LA  - english
AB  - KEK electron positron injector linac initiated the injection operation into Photon Factory (PF) light source in 1982. Since then for 39 years, it has served for multiple projects, namely, TRISTAN, PF-AR, KEKB, and SuperKEKB. Its total operation time has accumulated 200 thousand hours on May 7, 2020. We are extremely proud of the achievement following continuous efforts by our seniors. The construction of the injector linac started in 1978, and it was commissioned for PF with 2.5 GeV electron in 1982. In parallel, the positron generator linac was constructed for the TRISTAN collider project. The slow positron facility was also commissioned in 1992. After the KEKB asymmetric-energy collider project was commissioned in 1998 with direct energy injections, the techniques such as two-bunch acceleration and simultaneous injection were developed. As the soft structure design of the linac was too weak against the great east Japan earthquake, it took three years to recover. Then the construction and commissioning for the SuperKEKB project went on, and the simultaneous top-up injection into four storage rings contributes to the both elementary particle physics and photon science.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 2465
EP  - 2468
KW  - injection
KW  - linac
KW  - positron
KW  - operation
KW  - electron
DA  - 2022/07
PY  - 2022
SN  - 2673-5490
SN  - 978-3-95450-227-1
DO  - doi:10.18429/JACoW-IPAC2022-THPOST012
UR  - https://jacow.org/ipac2022/papers/thpost012.pdf
ER  -