Paper |
Title |
Page |
WEPAB364 |
Third-Generation CERN n_TOF Spallation Target: Final Design and Examinations of Irradiated Prototype |
3555 |
|
- R. Esposito, O. Aberle, M. Calviani, T. Coiffet, M.D. Crouvizier, R. Franqueira Ximenes, V. Maire, A.T. Perez Fontenla, M.A. Timmins
CERN, Geneva, Switzerland
|
|
|
The new neutron spallation target for the CERN neutron Time-Of-Flight (n_TOF) facility is based on a nitrogen-cooled Pb core impacted by short high-intensity proton beam pulses. An extensive material characterization campaign has been carried out to define the constitutive behavior of lead and assess its response under pulsed proton beam irradiation. The activities carried out include a beam irradiation test in the CERN HiRadMat facility. The tests and inspections performed show a robust behavior of the core material during operation and prominent static hardening recovery already at room temperature.
|
|
|
Poster WEPAB364 [1.011 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB364
|
|
About • |
paper received ※ 18 May 2021 paper accepted ※ 11 June 2021 issue date ※ 20 August 2021 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEPAB366 |
Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation |
3563 |
|
- C. Torregrosa, C. Ahdida, A. Bouvard, A. Broche, S. Burger, M.E.J. Butcher, M. Calviani, V. Clerc, A. De Macedo, S. De Man, F.A. Deslande, M. Di Castro, T. Dobers, T. Feniet, R. Ferriere, E. Fornasiere, R. Franqueira Ximenes, T.J. Giles, J.L. Grenard, E. Grenier-Boley, G. Gräwer, M. Guinchard, M.D. Jedrychowski, K. Kershaw, B. Lefort, E. Lopez Sola, J.M. Martin Ruiz, A. Martínez Sellés, G. Matulenaite, C.Y. Mucher, A. Newborough, M. Perez Ornedo, E. Perez-Duenas, A. Perillo-Marcone, L. Ponce, N. Solieri, M.B. Szewczyk, P.A. Thonet, M.A. Timmins, A. Tursun, W. Van den Broucke, F.M. Velotti, C. Vendeuvre, V. Vlachoudis
CERN, Meyrin, Switzerland
- J.C. Espadanal
LIP, Lisboa, Portugal
|
|
|
Antiprotons are produced at CERN at the Antiproton Decelerator (AD) Target Area by impacting 26 GeV/c proton beams onto a fixed target. Further collection, momentum selection, and transport of the secondary particles - including antiprotons - towards the AD ring is realised by a 400 kA pulsed magnetic horn and a set of magnetic dipoles and quadrupoles. A major consolidation of the area - in operation since the 80s - has taken place during the CERN Long Shutdown 2 (2019-2021). Among other activities, such upgrade included: (i) Installation of a new air-cooled target design and manufacturing of a new batch of magnetic horns, including a surface pulsing test-bench for their validation and fine-tuning (ii) Installation of a new positioning and maintenance system for the target and horn (iii) Refurbishment and decontamination of the Target Area and its equipment, (iv) Construction of a new surface service building to house new nuclear ventilation systems. This contribution presents an overview of such activities and lesson learnt. In addition, it provides the latest results from refractory metals R&D for the antiproton target and a summary of the recommissioning and optimization plans.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2021-WEPAB366
|
|
About • |
paper received ※ 18 May 2021 paper accepted ※ 21 June 2021 issue date ※ 01 September 2021 |
|