JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for WEPAB366: Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation

TY  - CONF
AU  - Torregrosa, C.
AU  - Ahdida, C.
AU  - Bouvard, A.
AU  - Broche, A.
AU  - Burger, S.
AU  - Butcher, M.E.J.
AU  - Calviani, M.
AU  - Clerc, V.
AU  - De Macedo, A.
AU  - De Man, S.
AU  - Deslande, F.A.
AU  - Di Castro, M.
AU  - Dobers, T.
AU  - Espadanal, J.C.
AU  - Feniet, T.
AU  - Ferriere, R.
AU  - Fornasiere, E.
AU  - Franqueira Ximenes, R.
AU  - Giles, T.J.
AU  - Grenard, J.L.
AU  - Grenier-Boley, E.
AU  - Gräwer, G.
AU  - Guinchard, M.
AU  - Jedrychowski, M.D.
AU  - Kershaw, K.
AU  - Lefort, B.
AU  - Lopez Sola, E.
AU  - Martin Ruiz, J.M.
AU  - Martínez Sellés, A.
AU  - Matulenaite, G.
AU  - Mucher, C.Y.
AU  - Newborough, A.
AU  - Perez Ornedo, M.
AU  - Perez-Duenas, E.
AU  - Perillo-Marcone, A.
AU  - Ponce, L.
AU  - Solieri, N.
AU  - Szewczyk, M.B.
AU  - Thonet, P.A.
AU  - Timmins, M.A.
AU  - Tursun, A.
AU  - Van den Broucke, W.
AU  - Velotti, F.M.
AU  - Vendeuvre, C.
AU  - Vlachoudis, V.
ED  - Liu, Lin
ED  - Byrd, John M.
ED  - Neuenschwander, Regis T.
ED  - Picoreti, Renan
ED  - Schaa, Volker R. W.
TI  - Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation
J2  - Proc. of IPAC2021, Campinas, SP, Brazil, 24-28 May 2021
CY  - Campinas, SP, Brazil
T2  - International Particle Accelerator Conference
T3  - 12
LA  - english
AB  - Antiprotons are produced at CERN at the Antiproton Decelerator (AD) Target Area by impacting 26 GeV/c proton beams onto a fixed target. Further collection, momentum selection, and transport of the secondary particles - including antiprotons - towards the AD ring is realised by a 400 kA pulsed magnetic horn and a set of magnetic dipoles and quadrupoles. A major consolidation of the area - in operation since the 80s - has taken place during the CERN Long Shutdown 2 (2019-2021). Among other activities, such upgrade included: (i) Installation of a new air-cooled target design and manufacturing of a new batch of magnetic horns, including a surface pulsing test-bench for their validation and fine-tuning (ii) Installation of a new positioning and maintenance system for the target and horn (iii) Refurbishment and decontamination of the Target Area and its equipment, (iv) Construction of a new surface service building to house new nuclear ventilation systems. This contribution presents an overview of such activities and lesson learnt. In addition, it provides the latest results from refractory metals R&D for the antiproton target and a summary of the recommissioning and optimization plans.
PB  - JACoW Publishing
CP  - Geneva, Switzerland
SP  - 3563
EP  - 3566
KW  - target
KW  - proton
KW  - antiproton
KW  - operation
KW  - MMI
DA  - 2021/08
PY  - 2021
SN  - 2673-5490
SN  - 978-3-95450-214-1
DO  - doi:10.18429/JACoW-IPAC2021-WEPAB366
UR  - https://jacow.org/ipac2021/papers/wepab366.pdf
ER  -