The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
TY - CONF AU - Torregrosa, C. AU - Ahdida, C. AU - Bouvard, A. AU - Broche, A. AU - Burger, S. AU - Butcher, M.E.J. AU - Calviani, M. AU - Clerc, V. AU - De Macedo, A. AU - De Man, S. AU - Deslande, F.A. AU - Di Castro, M. AU - Dobers, T. AU - Espadanal, J.C. AU - Feniet, T. AU - Ferriere, R. AU - Fornasiere, E. AU - Franqueira Ximenes, R. AU - Giles, T.J. AU - Grenard, J.L. AU - Grenier-Boley, E. AU - Gräwer, G. AU - Guinchard, M. AU - Jedrychowski, M.D. AU - Kershaw, K. AU - Lefort, B. AU - Lopez Sola, E. AU - Martin Ruiz, J.M. AU - Martínez Sellés, A. AU - Matulenaite, G. AU - Mucher, C.Y. AU - Newborough, A. AU - Perez Ornedo, M. AU - Perez-Duenas, E. AU - Perillo-Marcone, A. AU - Ponce, L. AU - Solieri, N. AU - Szewczyk, M.B. AU - Thonet, P.A. AU - Timmins, M.A. AU - Tursun, A. AU - Van den Broucke, W. AU - Velotti, F.M. AU - Vendeuvre, C. AU - Vlachoudis, V. ED - Liu, Lin ED - Byrd, John M. ED - Neuenschwander, Regis T. ED - Picoreti, Renan ED - Schaa, Volker R. W. TI - Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation J2 - Proc. of IPAC2021, Campinas, SP, Brazil, 24-28 May 2021 CY - Campinas, SP, Brazil T2 - International Particle Accelerator Conference T3 - 12 LA - english AB - Antiprotons are produced at CERN at the Antiproton Decelerator (AD) Target Area by impacting 26 GeV/c proton beams onto a fixed target. Further collection, momentum selection, and transport of the secondary particles - including antiprotons - towards the AD ring is realised by a 400 kA pulsed magnetic horn and a set of magnetic dipoles and quadrupoles. A major consolidation of the area - in operation since the 80s - has taken place during the CERN Long Shutdown 2 (2019-2021). Among other activities, such upgrade included: (i) Installation of a new air-cooled target design and manufacturing of a new batch of magnetic horns, including a surface pulsing test-bench for their validation and fine-tuning (ii) Installation of a new positioning and maintenance system for the target and horn (iii) Refurbishment and decontamination of the Target Area and its equipment, (iv) Construction of a new surface service building to house new nuclear ventilation systems. This contribution presents an overview of such activities and lesson learnt. In addition, it provides the latest results from refractory metals R&D for the antiproton target and a summary of the recommissioning and optimization plans. PB - JACoW Publishing CP - Geneva, Switzerland SP - 3563 EP - 3566 KW - target KW - proton KW - antiproton KW - operation KW - MMI DA - 2021/08 PY - 2021 SN - 2673-5490 SN - 978-3-95450-214-1 DO - doi:10.18429/JACoW-IPAC2021-WEPAB366 UR - https://jacow.org/ipac2021/papers/wepab366.pdf ER -