Author: Kako, E.
Paper Title Page
MOPOY025 Electromagnetic Design of β=0.13, f=325 Mhz Half-Wave Resonator for Future High Power, High Intensity Proton Driver at KEK 902
 
  • G.-T. Park, E. Kako, Y. Kobayashi, T. Koseki, S. Michizono, F. Naito, H. Nakai, K. Umemori, S. Yamaguchi
    KEK, Ibaraki, Japan
  • T. Maruta
    KEK/JAEA, Ibaraki-Ken, Japan
 
  At KEK, a proposal is being prepared for a new linac-based proton driver that can accelerate the proton beam up to 9 GeV with 9 MW beam power and 100 mA peak current. In this report, we present the study on the front end design of the linac, which will accelerate the beam to 1.2 GeV: The baseline layout, the acceleration energy structure, RF characteristics of components, cryomodule configurations, and the detailed design of half-wave resonator 1.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-MOPOY025  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOW036 Recent Developments and Operational Status of the Compact ERL at KEK 1835
 
  • T. Obina, M. Adachi, S. Adachi, T. Akagi, M. Akemoto, D.A. Arakawa, S. Araki, S. Asaoka, M. Egi, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, A. Ishii, X.J. Jin, E. Kako, Y. Kamiya, H. Katagiri, R. Kato, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondo, T. Konomi, A. Kosuge, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, H. Miyauchi, S. Nagahashi, H. Nakai, H. Nakajima, N. Nakamura, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sakanaka, S. Sasaki, K. Satoh, Y. Seimiya, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Tahara, T. Takahashi, R. Takai, H. Takaki, T. Takenaka, O. Tanaka, Y. Tanimoto, N. Terunuma, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, J. Urakawa, K. Watanabe, M. Yamamoto, N. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
  • R. Hajima, M. Mori, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
    QST, Tokai, Japan
  • M. Kuriki
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima, Japan
 
  The Compact Energy Recovery Linac (cERL) at KEK is a test accelerator in order to develop key components to realize remarkable ERL performance as a future light source. After the beam commissioning in December 2013, the legal current limit has been increased step-by-step like 1 uA, 10 uA, and 100 uA. Survey for the source of beam losses has been conducted in each step, and the study on beam dynamics and tuning has also been carried out. As a next step, 1 mA operation is scheduled in February 2016. In parallel to the increase in beam current, a laser Compton scattering (LCS) system which can provide high-flux X-ray to a beamline has been successfully commissioned. We report recent progress in various kinds of beam tuning: improvement of electron gun performance, high bunch charge operation, mitigation of beam losses, LCS optics tuning and bunch compression for THz radiation.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-TUPOW036  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB013 Long Term Cavity Performance in Compact-ERL Injector Cryomodule 2145
 
  • E. Kako, T. Konomi, T. Miura, H. Sakai, K. Umemori
    KEK, Ibaraki, Japan
 
  Degradation of cavity performance due to heavy field emission was observed in three 2-cell cavities after beam operation at 5 MeV for 2 years.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB013  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB014 Cavity Performance of the Prototype KEK Superconducting RF Gun 2148
 
  • T. Konomi, E. Kako, E. Kako, Y. Kobayashi, Y. Kobayashi, K. Umemori, K. Umemori, S. Yamaguchi
    KEK, Ibaraki, Japan
  • R. Matsuda
    Mitsubishi Heavy Industries Ltd. (MHI), Takasago, Japan
  • T. Yanagisawa
    MHI, Hiroshima, Japan
 
  A superconducting RF (SRF) gun can generate a high current and high energy beam. It has a possibility to achieve requirement from high performance ERL and high repetition FEL. Target values of the L-band KEK SRF gun are that beam repetition is 1.3 GHz, beam current is 100 mA, beam energy is 2 MeV, emittance is 1 mm mrad or less. The number of cell is 1.5. Accelerating energy of 2 MeV corresponds to 42 MV/m of maximum surface field. The photocathode is designed to be illuminated by excitation laser from backside. The SRF gun cavity consists of the 1.5 cell accelerating cavity, cathode plug and choke filter for protecting the heating of cathode plug. To evaluate these parts individually, these parts are added step by step. High gradient test of the accelerating cell without cathode plug and choke filter was done. The surface peak electric field reached 66 MV/m, and this meet the target value 42 MV/m sufficiently. Next high gradient test will be done after adding the choke filter. The choke filter is designed to be simple to wash choke cell easier. In this conference, we will report the design, fabrication and high gradient performance of the SRF gun cavity with choke filter.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB014  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB015 Construction and 2K Cooling Test of Horizontal Test Cryostat at KEK 2151
 
  • K. Umemori, K. Hara, E. Kako, Y. Kobayashi, Y. Kondo, H. Nakai, H. Sakai, S. Yamaguchi
    KEK, Ibaraki, Japan
 
  A horizontal test cryostat was designed and constructed at AR East building on KEK. Main purposes of test stand are improvement of module assembly technique and effective development of module components. Diameter of vacuum chamber is 1 m and its length is 3 m, which is enough to realize performance test of L-band 9-cell cavity with full assembly, including input couplers, HOM dampers/couplers and frequency tuners. On the sides, several ports are prepared to access to components, such as coupler and tuners. A cold box is placed on the top of the chamber. Liquid He is filled in a 4K-pod and 2K He is supplied through a J-T valve. A He pumping system is prepared. Inside of the chamber was covered with 80K shield, which is cooled by Liquid nitrogen. A cavity is supported on 5K table, which is also used as 5K thermal anchors. After cooling down to 80K using liquid Nitrogen, 4K He was stored and pumped down to 2K. The cooling test was successful. In this presentation, details of design and construction of the horizontal test cryostat is described and results of the cooling tests are shown. High power tests will be realized in near future.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB015  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB016 Vertical Test Results of Nitrogen Doped SRF Cavities at KEK 2154
 
  • K. Umemori, H. Inoue, E. Kako, T. Konomi, T. Kubo, H. Sakai, H. Shimizu, M. Yamanaka
    KEK, Ibaraki, Japan
  • H. Hara, K. Sennyu, T. Yanagisawa
    MHI-MS, Kobe, Japan
 
  Recently Nitrogen doping(N-doping) technique was proposed and drastic improvements of Q-values were reported. Since high-Q operation of SRF cavities are very attractive for CW machine, we started investigation on performance of Nitrogen doped SRF cavities. Nitrogen doping systems were prepared on two vacuum furnaces, which have been used for annealing of SRF cavities. Two fine grain single cell cavities have been used for the study. After 800 degree, 3 hours annealing, N-doping were carried out under several Pa of Nitrogen pressure and followed by post annealing. Three kind of different conditions, pressure and duration time, were attempted. After applying EP-2, cavity performances were evaluated by vertical tests. Against our expectations, we observed lower Q-values, at every measurements, than those measured without N-doping. In this presentation, we describe details about N-doping system and parameters and results obtained by vertical tests. Some discussions are also given against our results.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB016  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB017 High Gradient Cavity Performance in STF-2 Cryomodule for the ILC at KEK 2158
 
  • Y. Yamamoto, T. Honma, E. Kako, Y. Kojima, T. Matsumoto, H. Nakai, T. Shishido
    KEK, Ibaraki, Japan
 
  The high power test for STF-2 cryomodule has completed successfully in 2015. Before cooldown of cryomodule, at first, the input coupler conditioning at room temperature is done with detuned cavities. After cooldown, the cavity conditioning, which is the main part in the performance test, is done by monitoring the radiation level measured at three locations around the cryomodule, and the heating and RF output at two HOM (Higher Order Mode) couplers. Consequently, it became clear the average accelerating gradient is 30 MV/m for STF-2 cryomodule (39 MV/m at max. and 15 MV/m at min.), and the second cavity string with four cavities had the significant performance degradation by heavy field emission due to the additional clean room work in the STF tunnel. As the following next steps, there are the LFD (Lorenz Force Detuning) measurement, LFD compensation by piezo, and long run for check of stable operation at high gradient. In the long run around 32 MV/m, each cavity without degradation showed the stable operation with the successful LFD compensation by piezo and RF feedback system. In this paper, the detailed test result will be presented.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB017  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB026 MHI-MS's Production Activities of Superconducting Cavity 2180
 
  • H. Hara, A. Miyamoto, K. Sennyu, T. Yanagisawa
    MHI-MS, Kobe, Japan
  • E. Kako, T. Konomi, H. Nakai, K. Umemori
    KEK, Ibaraki, Japan
 
  Mitsubishi Heavy Industries Mechatronics Systems, Ltd. (MHI-MS), a subsidiary of MHI, took over MHI's accelerator business on October 1, 2015, and has been developing the business since that time. MHI-MS has developed manufacturing process of superconducting cavities continuously. In this presentation, recent progress will be reported.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB026  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPMB032 Fabrication and Testing Status of IHEP03 2194
 
  • T.X. Zhao, J. Gao, S. Jin, Z.Q. Li, Y.L. Liu, Z.C. Liu, Y. Wang, J.Y. Zhai, H.J. Zheng
    IHEP, Beijing, People's Republic of China
  • M. Asano, E. Kako
    KEK, Ibaraki, Japan
  • H. Yu, H. Yuan
    BIAM, Beijing, People's Republic of China
 
  After the successful development of the IHEP01 and IHEP02 1.3GHz 9cell superconducting cavity, we developed a 1.3GHz Tesla-Like 9cell superconducting cavities in collaboration with KEK. The cavity was made by niobium material produced in OTIC, Ningxia, China. After completeing welding, leakage check, BCP, HPR, we sent the cavity to KEK and used the standard procedures of ILC cavity for processing. These include electron polishing, vacuum furnace outgassing, tuning for field flatness and frequency, light EP, baking and vertical test. We target to have a high Q0 cavity for this experiment. In this paper, we will report the experimental status of the IHEP03 cavity.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IPAC2016-WEPMB032  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)