Author: Song, Y.-G.
Paper Title Page
MOPC032 Improvement of the RF System for the PEFP 100 MeV Proton Linac* 139
 
  • K.T. Seol, Y.-S. Cho, H.S. Kim, H.-J. Kwon, Y.-G. Song
    KAERI, Daejon, Republic of Korea
 
  Funding: This work is supported by the Ministry of Education, Science and Technology of the Korean Government.
The 100 MeV proton linear accelerator of the Proton Engineering Frontier Project (PEFP) has been developed and will be installed in Gyeong-ju site. The 20 MeV accelerator operated in Korea Atomic Energy Research Institute (KAERI) site will be also moved and reinstalled. The LLRF control systems for the 20 MeV accelerator were improved and have been operated within the stability of ±1% in RF amplitude and ±1 degree in RF phase. 7 sets of the extra LLRF control system will be installed with a RF reference system for the 100 MeV accelerator. Waveguide layout was also improved to install HPRF systems for the 100 MeV accelerator. Some of the HPRF components including klystrons, circulators, and RF windows are under purchase. The waveguide sections penetrating into the tunnel, which are fixed in a concrete floor with the bending structure for radiation shielding, were fabricated into a piece of waveguide to prevent the moisture and any foreign debris inside the concrete block. The details of the RF system improvement are presented.
 
 
WEPC146 Design and Implementation of Distributed Control System for PEFP 100-MeV Proton Accelerator* 2334
 
  • Y.-G. Song, Y.-S. Cho, J.-H. Jang, H.-J. Kwon
    KAERI, Daejon, Republic of Korea
 
  Funding: This work is supported by the Ministry of Education, Science and Technology of the Korean Government.
The Proton Engineering Frontier Project (PEFP) has been developing the control system for 100-MeV proton accelerator. The PEFP control system should be designed to fit control conditions based on networked and distributed real-time system composed of several sub-systems such as machine control, diagnostic control, timing, and interlock. In order to implement the distributed control system, the Experimental Physics and Industrial Control System (EPICS) has been chosen as the middleware of PEFP control system. The EPICS software provides a distributed architecture that supports a wide range of solution such as independent programming tool, operator interface tool, database and web-based archiving tools. In this paper, we will present the details of the design and implementation issues of the PEFP control system.
 
 
WEPS100 Status of 100-MeV Proton Linac Development for PEFP 2742
 
  • Y.-S. Cho, S. Cha, I.-S. Hong, J.-H. Jang, D.I. Kim, H.S. Kim, H.-J. Kwon, K. Min, B.-S. Park, J.Y. Ryu, K.T. Seol, Y.-G. Song, S.P. Yun
    KAERI, Daejon, Republic of Korea
  • J.S. Hong
    KAPRA, Cheorwon, Republic of Korea
 
  Funding: This wok was supported through the Proton Engineering Frontier Project by the Ministry of Education, Science and Technology of Korea.
The Proton Engineering Frontier Project (PEFP) is developing a 100-MeV high-duty-factor proton linac, which consists of a 50-keV microwave ion source, a 3-MeV radio frequency quadrupole, a 100-MeV drift tube linac, a 20-MeV beam transport line, and a 100-MeV beam transport line. It will supply proton beams of 20-MeV and 100-MeV with peak current of 20 mA to users for proton beam applications. The beam duty factor will be 24% and 8% respectively. The 20-MeV front-end accelerator has been installed and operated at the KAERI Daejeon test stand for user service, and the rest part of the accelerator has been fabricated and will be installed at the new site of Gyeongju City in 2011. The detailed status of the 100-MeV proton linac will be presented.
 
 
THPS022 Improvement of the 20 MeV Proton Accelerator at KAERI 3466
 
  • H.-J. Kwon, Y.-S. Cho, J.-H. Jang, D.I. Kim, H.S. Kim, K.T. Seol, Y.-G. Song
    KAERI, Daejon, Republic of Korea
 
  Funding: This work is supported by the Ministry of Science and Technology of the Korean government.
The 20 MeV proton accelerator has been operating since 2007 when it got a operational license at Korea Atomic Energy Research Institute (KAERI) by Proton Engineering Frontier Project (PEFP). A microwave ion source was newly developed to satisfy the requirement of minimum 100 hour operation time without maintenance. After the long time operation test at test bench, it was installed to drive the 20 MeV proton accelerator. The beam profile and emittance were measured to check the characteristics of the accelerator both at the LEBT and at the end of the 20 MeV DTL. In this paper, the microwave ion source is presented and the measurement results of the beam property are discussed.