THXPA02 Overview of the Status of the SOLEIL Project 2723
 
  • J.-M. Filhol, J.C. Besson, P. Brunelle, M.-E. Couprie, J.-C. Denard, J.M. Godefroy, C. Herbeaux, V. Le Roux, P. Lebasque, A. Lestrade, M.-P. Level, A. Loulergue, P. Marchand, J.L. Marlats, A. Nadji, L.S. Nadolski, R. Nagaoka, B. Pottin, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette
 
  SOLEIL is a third generation synchrotron radiation source, under construction in France near Paris. The storage ring consists of a 357 m circumference ring, with 16 cells and 24 straight sections, out of which up to 21 will house insertion devices (ID). The optics features a low 3.7 nm.rad emittance at the 2.75 GeV operating energy, so as to provide high brilliance, from the VUV up to the hard x-ray domain. To reach a long lifetime, and beam position stabilities in the micron range, significant attention was paid at each design stage (optics, magnets, beam position monitors, vacuum and RF systems…), including on the design of the building, the construction of which is now complete. This resulted in some unprecedented approaches such as the intensive use of NEG coating vessels, or the development of a dedicated SC RF cavity and of 200 kW solid state RF amplifiers. The injector system (100 MeV Linac) and the 3 Hz full energy booster synchrotron have reached nominal operating conditions by fall 2005, while the ring commissioning should start by April 2006. Innovative ID's were designed and built so as to provide the best possible performances in a wide energy range (5 eV to 50 keV).  
slides icon Transparencies
THPLS006 The Machine Installation at SOLEIL 3275
 
  • J.C. Besson, X. Deletoille, J.-F. Lamarre, D. Lefebvre, H. Rozelot
    SOLEIL, Gif-sur-Yvette
 
  SOLEIL is a third generation Synchrotron radiation Source, under construction in France near Paris. The 357 m circumference storage ring is mainly composed of (32 +1) dipoles, 160 quadrupoles, 120 sextupoles, 2 RF cryomodules, ~ 200 vacuum chambers, 6 injection equipment; 12 beamline front-ends and 4 insertion devices (initially). The 157 m circumference Booster comprises 36 dipoles, 44 quadrupoles, 28 sextupoles, 1 RF cavity and 8 injection/extraction equipment. Before the beginning of the Process installation, a general planning was established detailing the various stages of the equipment installation and their assembly protocols before their on-site installation. In reality, many unknown factors, delays on the buildings, delays on the equipment deliveries, technical problems encountered during the construction, have constrained us to significantly and frequently amend and adapt this initial planning. Due to the various delays, it was also necessary to manage the cohabitation with the various building trades. However, the work made on the initial planning paid off as without its detailed protocols, we could not have carried out the Process installation within correct deadline.  
THPLS009 First Results of the Commissioning of SOLEIL Storage Rings 3284
 
  • A. Nadji, J.C. Besson, P. Betinelli, P. Brunelle, A. Buteau, L. Cassinari, M.-E. Couprie, J.-C. Denard, J.-M. Filhol, P. Gros, C. Herbeaux, J.-F. Lamarre, P. Lebasque, M.-P. Level, A. Loulergue, A. Madur, P. Marchand, L.S. Nadolski, R. Nagaoka, B. Pottin, M.-A. Tordeux
    SOLEIL, Gif-sur-Yvette
 
  The commissioning of SOLEIL's storage ring will start in April 2006. The objective is to reach, within a first phase of two months, stable beam conditions at 100 mA in the multi-bunch mode that can be used for the commissioning of the beamlines. This is a challenging objective, especially because the SOLEIL's ring is incorporating some innovative techniques such as the use of a superconducting RF cavity, NEG coating for all straight parts of the machine and new BPM electronics. Prior to the start of the commissioning, some insertion devices and most of the insertion devices low gap vacuum vessels, including 10 mm inner vertical aperture vessels for the Apple-II type, will be installed on the ring. This paper will review the performances of all these equipment in presence of the beam. The results of the first commissioning runs will be presented.