Author: Sun, D.
Paper Title Page
TUPB013 Fermilab Cryomodule Test Stand Design and Plans 566
 
  • E.R. Harms, C.M. Baffes, K. Carlson, B.E. Chase, A.L. Klebaner, M.J. Kucera, J.R. Leibfritz, M.W. McGee, P.S. Prieto, J. Reid, R.P. Stanek, D. Sun, M.J. White
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
A facility dedicated to SRF cryomodule testing is under construction at Fermilab. The test stand has been designed to be flexible enough to cool down and power test full length TESLA-style 8-cavity cryomodules as well cryomodules for low-β acceleration. We describe the design considerations, status, and near future plans for utilization of the test stand.
 
poster icon Poster TUPB013 [5.146 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
TUPB014 First Operation of a Superconducting RF Electron Test Accelerator at Fermilab 571
 
  • E.R. Harms, R. Andrews, C.M. Baffes, D.R. Broemmelsiek, K. Carlson, D.J. Crawford, N. Eddy, D.R. Edstrom, J.R. Leibfritz, A.H. Lumpkin, S. Nagaitsev, P. Piot, P.S. Prieto, J. Reid, J. Ruan, J.K. Santucci, V.D. Shiltsev, W.M. Soyars, D. Sun, R.M. Thurman-Keup, A. Valishev, A. Warner
    Fermilab, Batavia, Illinois, USA
 
  Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.
A test accelerator utilizing SRF technology recently accelerated its first electrons to 20 MeV at Fermilab. Foreseen enhancements will make acceleration to 300 MeV possible at a maximum beam power of 80 kW. A summary of commissioning steps and first experiments as well as current beam parameters compared to design is presented. Plans for expansion and the future physics program are also summarized.
 
poster icon Poster TUPB014 [11.582 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)