Author: Michelato, P.
Paper Title Page
MOPB077 Vertical Tests of XFEL 3rd Harmonic Cavities 306
 
  • D. Sertore, M. Bertucci, A. Bosotti, J.F. Chen, C.G. Maiano, P. Michelato, L. Monaco, M. Moretti, R. Paparella, P. Pierini
    INFN/LASA, Segrate (MI), Italy
  • A. Matheisen, M. Schmökel
    DESY, Hamburg, Germany
  • C. Pagani
    Università degli Studi di Milano & INFN, Segrate, Italy
 
  The 10 cavities of the EXFEL 3rd Harmonic Cryomodule have been tested and qualified, before integration in the He-tank, in our upgraded Vertical Test stand. In this paper, we report the measured RF performance of these cavities together with the main features of the test facility.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
MOPB094 Inspection and Repair Techniques for the EXFEL Superconducting 1.3 GHz Cavities at Ettore Zanon S.p.A: Methods and Results 368
 
  • G. Massaro, G. Corniani, N. Maragno
    Ettore Zanon S.p.A., Schio, Italy
  • A. Matheisen, A. Navitski
    DESY, Hamburg, Germany
  • P. Michelato, L. Monaco
    INFN/LASA, Segrate (MI), Italy
 
  The quality control of the inner surface of superconducting RF cavities is essential in order to assure high accelerating gradient and quality factor. Ettore Zanon S.p.A. (EZ) has implemented in the serial production an optical system that use an high-resolution camera, in order to detect various types of defects. This system is added to a grinding machine, that was specifically designed and built to repair imperfections of the cavities inner surface. This inspection and repair system is applied to recover performance limited cavities of the 1.3 GHz European XFEL project, where surface irregularities are detected, either by the Obacht inspection system at Desy or the optical system at EZ. The optical system and the grinding procedure are qualified using two series cavities limited in gradient and showing different types of surface defects. The performances of these cavities have been recovered to reach the specifications of the project. Until now, all the series XFEL cavities built by EZ, repaired with this technique, have shown an accelerating gradient well above the EXFEL goal.  
poster icon Poster MOPB094 [0.795 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
MOPB102 Comments on Electropolishing at Ettore Zanon SpA at the End of EXFEL Production 394
 
  • M. Rizzi, G. Corniani
    Ettore Zanon S.p.A., Schio, Italy
  • A. Matheisen
    DESY, Hamburg, Germany
  • P. Michelato
    INFN/LASA, Segrate (MI), Italy
 
  In 2013 a new horizontal Electropolishing facility was developed and implemented by Ettore Zanon SpA (EZ) for the treatment of cavities for the European XFEL series production. More than 300 cavities have been treated. Electropolishing has been used for two applications: bulk removal and recovering of cavities with surface defects. Treatment settings have been analysed and compared with cavities performances to verify possible influences of the various parameters. Main parameters considered are treatment time, voltage and current, that together define average thickness removal. We present here the results of these investigation. The facility and process in use are also presented, together with possible next upgrade of the system, facing the new production of cavities for the LCLSII project.  
poster icon Poster MOPB102 [1.535 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
MOPB113 Study of the Evolution of Artificial Defects on the Surface of Niobium During Electrochemical and Chemical Polishing 433
 
  • L. Monaco, P. Michelato
    INFN/LASA, Segrate (MI), Italy
  • A. Navitski, J. Schaffran, W. Singer
    DESY, Hamburg, Germany
  • C. Pagani
    Università degli Studi di Milano & INFN, Segrate, Italy
  • A.L. Prudnikava, Y. Tamashevich
    University of Hamburg, Institut für Experimentalphysik, Hamburg, Germany
 
  The presence of defects on the inner surface of Nb superconducting RF structures might limit its final performance. For this reason, strict requirements are imposed during mechanical production of the cavities, specifically on the quality control of the inner surface of components, to avoid the presence of defects or scratches. Nevertheless, some defects may remain also after control or can arise from the following production steps. Understanding the evolution of the defect might shine new insight on its origin and help in defining possible repair techniques. This paper reports the topographical evolution of defects on a Nb sample polished with the standard recipe used for the 1.3 GHz cavities of the EXFEL project. Various artificial defects of different shape, dimensions, and thicknesses/depths, with geometrical characteristics similar to the one that may occur during the machining and handling of cavities, have been “ad hoc” produced on the sample of the same material used for the cell fabrication. Analysis shows the evolution of the shape and profile of the defects at the different polishing steps.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
TUPB018 Preparation of the 3.9 GHz System for the European XFEL Injector Commissioning 584
 
  • P. Pierini, M. Bertucci, M. Bonezzi, A. Bosotti, J.F. Chen, M. Chiodini, P. Michelato, L. Monaco, M. Moretti, R. Paparella, D. Sertore
    INFN/LASA, Segrate (MI), Italy
  • C. Albrecht, N. Baboi, S. Barbanotti, J. Branlard, Th. Buettner, Ł. Butkowski, T. Delfs, H. Hintz, F. Hoffmann, M. Hüning, K. Jensch, R. Jonas, R. Klos, D. Kostin, L. Lilje, C.G. Maiano, W. Maschmann, A. Matheisen, U. Mavrič, W.-D. Möller, C. Müller, P. Pierini, J. Prenting, J. Rothenburg, O. Sawlanski, M. Schlösser, M. Schmökel, A.A. Sulimov, E. Vogel
    DESY, Hamburg, Germany
  • E.R. Harms
    Fermilab, Batavia, Illinois, USA
  • C.R. Montiel
    ANL, Argonne, Illinois, USA
  • C. Pagani
    Università degli Studi di Milano & INFN, Segrate, Italy
 
  The 3.9 GHz cryomodule and RF system for the XFEL Injector is being assembled and delivered to the underground building in summer 2015, for the injector commissioning in Fall 2015. This contribution outlines the status of the activity and reports the preparation stages of the technical commissioning of the system.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
TUPB087 Development of an X-Ray Fluorescence Probe for Inner Cavity Inspection 799
 
  • M. Bertucci, P. Michelato, L. Monaco, M. Moretti, C. Pagani
    INFN/LASA, Segrate (MI), Italy
  • A. Navitski
    DESY, Hamburg, Germany
 
  The development of an x-ray fluorescence probe for detection of foreign material inclusions of the inner surface of 1.3 GHz tesla-type Niobium cavities is here presented. The setup dimensions are minimized so to access the inner cavity volume and focus on the surface of equator. Preliminary tests confirmed the system capability to detect and localize with good precision small metal inclusions of few micrograms. The results obtained from the inspection of some 1.3 GHz XFEL series production cavities are also pointed out.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
THPB010 INFN Milano - LASA Activities for ESS 1081
 
  • P. Michelato, M. Bertucci, A. Bignami, A. Bosotti, J.F. Chen, L. Monaco, M. Moretti, R. Paparella, P. Pierini, D. Sertore
    INFN/LASA, Segrate (MI), Italy
  • C. Pagani
    Università degli Studi di Milano & INFN, Segrate, Italy
  • H.J. Zheng
    IHEP, Beijing, People's Republic of China
 
  INFN Milano – LASA is involved in the development and industrialization for the production of 704.4 MHz medium beta (β = 0.67) cavities for the ESS project. In this framework, we are designing a medium beta prototype cavity exploring both Large Grain and Fine Grain Niobium for its production as well as a high beta (β = 0.86) Large Grain cavity. In the meanwhile, an activity is ongoing for upgrading the LASA test facility to be able to test these kind of resonators.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)  
 
THPB035 Fabrication of the 3.9 GHz SRF Structures for the European XFEL 1162
 
  • P. Pierini, M. Bertucci, A. Bosotti, J.F. Chen, P. Michelato, L. Monaco, M. Moretti, R. Paparella, D. Sertore
    INFN/LASA, Segrate (MI), Italy
  • A. Gresele
    Ettore Zanon S.p.A., Nuclear Division, Schio, Italy
  • C.G. Maiano, P. Pierini, E. Vogel
    DESY, Hamburg, Germany
  • C. Pagani
    Università degli Studi di Milano & INFN, Segrate, Italy
  • M. Rizzi
    Ettore Zanon S.p.A., Schio, Italy
 
  One batch of 10 cavities has been completed and eight structures have been installed in the 3.9 GHz cryomodule for the European XFEL Injector operation. A second batch of 10 RF structures for a spare injector module is under fabrication. The fabrication has been performed according to the European Pressure Vessel regulations, as needed for the EXFEL operation. This paper describes the fabrication, quality control/assurance procedures and frequency preparation steps in order to achieve cavities at the correct frequency and length within the specifications.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text, ※ RIS/RefMan, ※ EndNote (xml)