A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Zhang, C.

Paper Title Page
MOP001 A Coupled RFQ-Drift Tube Combination for FRANZ 46
 
  • A. Bechtold, U. Bartz, M. Heilmann, P. Kolb, H. Liebermann, O. Meusel, D. Mäder, H. Podlech, U. Ratzinger, A. Schempp, C. Zhang
    IAP, Frankfurt am Main
  • G. Clemente
    GSI, Darmstadt
 
 

Funding: Work supported by BMBF
The Frankfurt Neutron Source at the Stern-Gerlach-Zentrum will comprise a short 175 MHz linac sequence consisting of a 1.4 m long 700 keV 4-rod type RFQ followed by a 50 cm IH-DTL for proton acceleration up to 2 MeV. The beam current is 200 mA at pulsed and 30 mA at cw operation. The aim is to have a very compact device driven by only one rf amplifier to reduce costs and required installation space. A coupling between the RFQ and the IH resonators by means of a galvanic connection is foreseen, which is realized by two brackets going right away through a common partitioning end flange lid. The accelerators could also be driven separately by just removing the brackets. The distance between the end of the RFQ electrodes and the middle of the first DTL gap is only 5 cm, there is no additional beam optics in between. Preliminary beam dynamics and rf simulations have been carried out together with accompanying measurements on rf models.

 
MOP033 The New EBIS RFQ for BNL 139
 
  • M. Vossberg, B. Hofmann, A. Schempp, J.S. Schmidt, C. Zhang
    IAP, Frankfurt am Main
  • J.G. Alessi, D. Raparia, L. Snydstrup
    BNL, Upton, Long Island, New York
 
 

A new RFQ is being built as a part of the new EBIS-linac at BNL. The RFQ accepts highly charged ions from the EBIS ion source with energy of 17 keV/u and ion currents of up to 10 mA. The operation frequency will be 100.625 MHz . The design had been optimized to get a rather short structure with LRFQ=3.1 m with moderate electrode voltages of UQ = 70 kV. The resonant insert has a cooled base plate and solid stems and vane-electrodes. The mechanical design is very stiff, with a precise base-structure. The top lid along the RFQ allows installation, alignment, inspection and maintenance. After the mechanical alignment of the electrodes the longitudinal electrode voltage distribution will be adjusted with tuning plates between the stems. The properties of the RFQ, the results of the tuning and the status of the project will be discussed.

 
THP011 Recent Developments on Superconducting CH-Structures and Future Perspectives 797
 
  • H. Podlech, M. Amberg, A. Bechtold, M. Busch, F.D. Dziuba, U. Ratzinger, C. Zhang
    IAP, Frankfurt am Main
 
 

Funding: GSI, BMBF contr. No. 06F134I, EU contr. No. 516520-FI6W, RII3-CT-2003-506395, EFDA/99-507ERB500CT990061
Worldwide there is an increasing interest in new high intensity proton and ion driver linacs with beam powers up to several MW. A very challenging part of these accelerators is the low and medium energy section up to 100 MeV. Depending on the duty cycle room temperature or superconducting options are favoured. In both cases the Crossbar-H-mode (CH)-structure, developed at the IAP in Frankfurt is an excellent candidate. Room temperature as well as superconducting prototype cavities have been developed and tested successfully. A superconducting 19 cell low energy (beta=0.1) CH-cavity at 360 MHz reached effective gradients of 7 MV/m corresponding to an accelerating voltage of 5.6 MV. This cavity could be used for high intensity, cw operated linacs like accelerator driven systems (ADS, EUROTRANS) or the international fusion material irradiation facility (IFMIF). Additionally, the new proton injector for FAIR (325 MHz, 70 mA, 70 MeV) will use room temperature CH-cavities. Recent developments of this new type of a multi-cell drift tube cavity, beam dynamics issues and the tests of the prototypes will be presented.