Paper | Title | Page |
---|---|---|
THP046 | Preliminary Design of the Slow Chopper for the SPIRAL 2 Project | 891 |
|
||
The SPIRAL2 LEBT line uses a single chopper situated in the line section common to protons, deuterons and A/Q=3 ions. The paper describes the design and the test of the power circuits, based on standard components and working up to 10 kV, at a 1 kHz repetition rate. |
||
THP047 | Design of the MEBT Rebunchers for the SPIRAL2 Driver | 894 |
|
||
The SPIRAL2 project uses a RFQ, normal conducting rebunchers and a superconducting linac to accelerate high intensity beams of protons, deuterons and heavier ions. All cavities work at 88 MHz, the beta after of the RFQ is 0.04 and 3 rebunchers are located in the MEBT line, which accepts ions with A/q up to 6. The paper describes the RF design and the technological solutions proposed for an original 3-gap cavity, characterised by very large beam holes (60 mm) and providing up to 120 kV of effective voltage. |
||
THP048 | RF Power Amplifiers for the SPIRAL2 Driver: Requirements and Status | 897 |
|
||
The SPIRAL2 project uses an RFQ, normal conducting rebunchers and a superconducting linac to accelerate high intensity beams of protons, deuterons and heavier ions. All cavities work at 88 MHz, are independently phased and powered by amplifiers whose power ranges from a few kW to 250 kW. The paper describes the amplifier requirements, the proposed solutions and their status. |