Author: Salvant, B.
Paper Title Page
MOPFI052 A New Lead Ion Injection System for the CERN SPS with 50 ns Rise Time 398
 
  • B. Goddard, O. Aberle, J. Borburgh, E. Carlier, K. Cornelis, L. Ducimetière, L.K. Jensen, T. Kramer, D. Manglunki, A. Mereghetti, V. Mertens, D. Nisbet, B. Salvant, L. Sermeus
    CERN, Geneva, Switzerland
 
  The LHC High Luminosity upgrade project includes a performance upgrade for heavy ions. One of the present performance limitations is the rise time of the SPS injection kicker system, which imposes a spacing of at least 220 ns between injected bunch trains at the operational rigidity. A reduction of this rise time to 50 ns for lead ions is requested as part of the suite of measures needed to increase the present design performance by a factor three. A new injection system based on a fast pulsed septum and a fast kicker has been proposed to fulfil this rise time requirement, and to meet all the constraints associated with the existing high intensity proton injection in the same region. This paper describes the concept and the required equipment parameters, and explores the implications of such a system for SPS operation.  
 
MOPWA030 Upgrade of the LHC Injection Kicker Magnets 729
 
  • M.J. Barnes, P. Adraktas, V. Baglin, G. Bregliozzi, S. Calatroni, F. Caspers, H.A. Day, L. Ducimetière, M. Garlaschè, V. Gomes Namora, J.M. Jimenez, N. Magnin, V. Mertens, E. Métral, B. Salvant, M. Taborelli, J.A. Uythoven, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The two LHC injection kicker systems, comprising 4 magnets per ring, produce a kick of 1.3 T.m with a rise-time of less than 900 ns and a flattop ripple of less than ±0.5%. A beam screen is placed in the aperture of each magnet, to provide a path for the image current of the high intensity LHC beam and screen the ferrite yoke against wake fields. The screen consists of a ceramic tube with conductors in the inner wall. The initially implemented beam screen ensured a low rate of electrical breakdowns while providing an adequate beam coupling impedance. Operation with increasingly higher intensity beams, stable for many hours at a time, now results in substantial heating of the ferrite yoke, sometimes requiring cool down over several hours before the LHC can be refilled. During the long shutdown in 2013/2014 all 8 kicker magnets will be upgraded with an improved beam screen and an increased emissivity of the vacuum tank. In addition equipment adjacent to the injection kickers and various vacuum components will also be modified to help reduce the vacuum pressure in the kickers during high-intensity operation. This paper discusses the upgrades as well as their preparation and planning.  
 
TUPFI034 Observations of Two-beam Instabilities during the 2012 LHC Physics Run 1418
 
  • T. Pieloni
    EPFL, Lausanne, Switzerland
  • G. Arduini, X. Buffat, R. Giachino, W. Herr, M. Lamont, N. Mounet, E. Métral, G. Papotti, B. Salvant, J. Wenninger
    CERN, Geneva, Switzerland
  • S.M. White
    BNL, Upton, Long Island, New York, USA
 
  During the 2012 run coherent beam instabilities have been observed in the LHC at 4 TeV, during the betatron squeeze and in collision for special filling patterns. Several studies to characterize these instabilities have been carried out during operation and in special dedicated experiments. In this paper we summarize the observations collected for different machine parameters and the present understanding of the origin of these instabilities.  
 
TUPFI063 Electromagnetic Coupling between High Intensity LHC Beams and the Synchrotron Radiation Monitor Light Extraction System 1493
 
  • F. Roncarolo, W. Andreazza, A. Bertarelli, E. Bravin, F. Caspers, M. Garlaschè, A. Goldblatt, J-J. Gras, O.R. Jones, T. Lefèvre, E. Métral, A.A. Nosych, B. Salvant, G. Trad, R. Veness, C. Vollinger, M. Wendt
    CERN, Geneva, Switzerland
 
  The CERN LHC is equipped with two Synchrotron Radiation Monitor systems used to characterise transverse and longitudinal beam distributions. Since the end of the 2011 LHC run the light extraction system, based on a retractable mirror, has suffered deformation and mechanical failure that is correlated to the increase in beam intensity. Temperature probes have associated these observations to a strong heating of the mirror support with a dependence on the longitudinal bunch length and shape, indicating the origin as electromagnetic coupling between the beam and the structure. This paper combines all this information with the aim of characterising and improving the system in view of its upgrade during the current LHC shutdown. Beam-based observations are presented along with electromagnetic and thermomechanical simulations and complemented by laboratory measurements, including the study of the RF properties of different mirror bulk and coating materials.  
 
TUPME032 Update on Beam Induced RF Heating in the LHC 1646
 
  • B. Salvant, O. Aberle, G. Arduini, R.W. Aßmann, V. Baglin, M.J. Barnes, W. Bartmann, P. Baudrenghien, O.E. Berrig, A. Bertarelli, C. Bracco, E. Bravin, G. Bregliozzi, R. Bruce, F. Carra, F. Caspers, G. Cattenoz, S.D. Claudet, H.A. Day, M. Deile, J.F. Esteban Müller, P. Fassnacht, M. Garlaschè, L. Gentini, B. Goddard, A. Grudiev, B. Henrist, S. Jakobsen, O.R. Jones, O. Kononenko, G. Lanza, L. Lari, T. Mastoridis, V. Mertens, N. Mounet, E. Métral, A.A. Nosych, J.L. Nougaret, S. Persichelli, A.M. Piguiet, S. Redaelli, F. Roncarolo, G. Rumolo, B. Salvachua, M. Sapinski, R. Schmidt, E.N. Shaposhnikova, L.J. Tavian, M.A. Timmins, J.A. Uythoven, A. Vidal, J. Wenninger, D. Wollmann, M. Zerlauth
    CERN, Geneva, Switzerland
  • H.A. Day
    UMAN, Manchester, United Kingdom
  • L. Lari
    IFIC, Valencia, Spain
 
  Since June 2011, the rapid increase of the luminosity performance of the LHC has come at the expense of increased temperature and pressure readings on specific near-beam LHC equipment. In some cases, this beam induced heating has caused delays whilie equipment cools down, beam dumps and even degradation of these devices. This contribution gathers the observations of beam induced heating attributable to beam coupling impedance, their current level of understanding and possible actions that are planned to be implemented during the long shutdown in 2013-2014.  
 
TUPME033 Evaluation of the Beam Coupling Impedance of New beam Screen Designs for the LHC Injection Kicker Magnets 1649
 
  • H.A. Day
    UMAN, Manchester, United Kingdom
  • M.J. Barnes, F. Caspers, E. Métral, B. Salvant
    CERN, Geneva, Switzerland
  • R.M. Jones
    Cockcroft Institute, Warrington, Cheshire, United Kingdom
 
  The LHC injection kicker magnets (MKIs) have experienced a significant degree of beam induced heating since the beginning of the 2011 due to the increasing intensity stored in the LHC, for long periods of time, and the relatively large broadband impedance of the installed kicker magnets. In this paper we show the sources of impedance in the MKIs, especially the effect that the beam screen dimensions have on the impedance. We show how these alter the power loss, and present an improved beam screen design that improves shielding on the magnet, whilst further improving electrical breakdown.  
 
TUPME034 Experimental Studies for Future LHC Beams in the SPS 1652
 
  • H. Bartosik, T. Argyropoulos, T. Bohl, S. Cettour-Cave, J.F. Esteban Müller, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo, B. Salvant, F. Schmidt, E.N. Shaposhnikova, H. Timko
    CERN, Geneva, Switzerland
  • A.Y. Molodozhentsev
    KEK, Ibaraki, Japan
 
  The High Luminosity LHC (HL-LHC) project requires significantly higher beam intensity than presently accessible in the LHC injector chain. The aim of the LHC injectors upgrade project (LIU) is to prepare the CERN accelerators for the future needs of the LHC. Therefore a series of machine studies with high brightness beams were performed, assessing the present performance reach and identifying remaining limitations. Of particular concern are beam loading and longitudinal instabilities at high energy, space charge for beams with 50ns bunch spacing and electron cloud effects for beams with 25ns bunch spacing. This paper provides a summary of the performed studies, that have been possible thanks to the implementation of the SPS low gamma-transition optics.  
 
TUPWA042 Lessons Learned and Mitigation Measures for the CERN LHC Equipment with RF Fingers 1802
 
  • E. Métral, O. Aberle, R.W. Aßmann, V. Baglin, M.J. Barnes, O.E. Berrig, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Carra, F. Caspers, H.A. Day, M. Ferro-Luzzi, M.A. Gallilee, C. Garion, M. Garlaschè, A. Grudiev, J.M. Jimenez, O.R. Jones, O. Kononenko, R. Losito, J.L. Nougaret, V. Parma, S. Redaelli, B. Salvant, P.M. Strubin, R. Veness, C. Vollinger, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  Beam-induced RF heating has been observed in several LHC components when the bunch/beam intensity was increased and/or the bunch length reduced. In particular eight bellows, out of the ten double-bellows modules present in the machine in 2011, were found with the spring, which should keep the RF fingers in good electrical contact with the central insert, broken. Following these observations, the designs of all the components of the LHC equipped with RF fingers have been reviewed. The lessons learnt and mitigation measures are presented in this paper.  
 
TUPWA043 Impedance Studies for VMTSA Module of LHC Equipped with RF Fingers 1805
 
  • O. Kononenko, F. Caspers, A. Grudiev, E. Métral, B. Salvant
    CERN, Geneva, Switzerland
 
  During 2011 run of LHC it was found that beam-induced heating causes many issues for accelerator components. Particularly some of the double-bellow modules, called VMTSA modules, were found to have deformed RF fingers and a broken spring which ensured good contact between them and a central insert. Impedance studies have been performed for different types of nonconformities and benchmarked against measurements. It was found that even a small gap between the fingers and a central insert could be fatal for the VMTSA operation. Results of this study were an input for the further thermal analysis.  
 
TUPWA047 Collimator Impedance Measurements in the LHC 1817
 
  • N. Mounet, R. Bruce, E. Métral, S. Redaelli, B. Salvachua, B. Salvant, G. Valentino
    CERN, Geneva, Switzerland
 
  The collimation system of the LHC is one of the largest impedance contributors of the machine, in particular for its imaginary part. To evaluate the collimator impedance and its evolution with integrated luminosity, several measurement campaigns were performed along the year 2012, in which collimator jaws were moved back-and-forth leading to significant tune shifts for a nominal intensity bunch in the machine. These observations are compared to the results from HEADTAIL simulations with the impedance model in its current state of development.  
 
WEPEA042 The PS Upgrade Programme: Recent Advances 2594
 
  • S.S. Gilardoni, S. Bart Pedersen, C. Bertone, N. Biancacci, A. Blas, D. Bodart, J. Borburgh, P. Chiggiato, H. Damerau, S. Damjanovic, J.D. Devine, T. Dobers, M. Gourber-Pace, S. Hancock, A. Huschauer, G. Iadarola, L.A. Lopez Hernandez, A. Masi, S. Mataguez, E. Métral, M.M. Paoluzzi, S. Persichelli, S. Pittet, S. Roesler, C. Rossi, G. Rumolo, B. Salvant, R. Steerenberg, G. Sterbini, L. Ventura, J. Vollaire, R. Wasef, C. Yin Vallgren
    CERN, Geneva, Switzerland
  • M. Migliorati
    University of Rome "La Sapienza", Rome, Italy
 
  The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC. In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is given.  
 
WEPEA053 Progress with the Upgrade of the SPS for the HL-LHC Era 2624
 
  • B. Goddard, T. Argyropoulos, W. Bartmann, H. Bartosik, T. Bohl, F. Caspers, K. Cornelis, H. Damerau, L.N. Drøsdal, L. Ducimetière, J.F. Esteban Müller, R. Garoby, M. Gourber-Pace, W. Höfle, G. Iadarola, L.K. Jensen, V. Kain, R. Losito, M. Meddahi, A. Mereghetti, V. Mertens, Ö. Mete, E. Montesinos, Y. Papaphilippou, G. Rumolo, B. Salvant, E.N. Shaposhnikova, M. Taborelli, H. Timko, F.M. Velotti
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  The demanding beam performance requirements of the HL-LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.  
 
THOBB102 Beam Coupling Impedance Localization Technique Validation and Measurements in the CERN Machines 3106
 
  • N. Biancacci, G. Arduini, T. Argyropoulos, H. Bartosik, R. Calaga, K. Cornelis, S.S. Gilardoni, N. Mounet, E. Métral, Y. Papaphilippou, S. Persichelli, G. Rumolo, B. Salvant, G. Sterbini, R. Tomás, R. Wasef
    CERN, Geneva, Switzerland
  • M. Migliorati, L. Palumbo
    URLS, Rome, Italy
 
  The beam coupling impedance could lead to limitations in beam brightness and quality, and therefore it needs accurate quantification and continuous monitoring in order to detect and mitigate high impedance sources. In the CERN machines, for example, kickers and collimators are expected to be the main contributors to the total imaginary part of the transverse impedance. In order to detect the other sources, a beam based measurement was developed: from the variation of betatron phase beating with intensity, it is possible to detect the locations of main impedance sources. In this work we present the application of the method with beam measurements in the CERN PS, SPS and LHC.  
slides icon Slides THOBB102 [7.224 MB]  
 
THPWO080 Operational Performance of the LHC Proton Beams with the SPS Low Transition Energy Optics 3945
 
  • Y. Papaphilippou, G. Arduini, T. Argyropoulos, W. Bartmann, H. Bartosik, T. Bohl, C. Bracco, S. Cettour-Cave, K. Cornelis, L.N. Drøsdal, J.F. Esteban Müller, B. Goddard, A. Guerrero, W. Höfle, V. Kain, G. Rumolo, B. Salvant, E.N. Shaposhnikova, H. Timko, D. Valuch, G. Vanbavinckhove, J. Wenninger
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  An optics in the SPS with lower integer tunes (20 versus 26) was proposed and introduced in machine studies since 2010, as a measure for increasing transverse and longitudinal instability thresholds, especially at low energy, for the LHC proton beams. After two years of machine studies and careful optimisation, the new “Q20” optics became operational in September 2012 and steadily delivered beam to the LHC until the end of the run. This paper reviews the operational performance of the Q20 optics with respect to transverse and longitudinal beam characteristics in the SPS, enabling high brightness beams injected into the LHC. Aspects of longitudinal beam stability, transmission, high-energy orbit control and beam transfer are discussed.