WEPWA015 Progress in Construction of the 35 MeV Compact Energy Recovery Linac at KEK 2159
 
  • S. Sakanaka, S. Adachi, M. Akemoto, D.A. Arakawa, S. Asaoka, K. Enami, K. Endo, S. Fukuda, T. Furuya, K. Haga, K. Hara, K. Harada, T. Honda, Y. Honda, H. Honma, T. Honma, K. Hosoyama, K. Hozumi, E. Kako, Y. Kamiya, H. Katagiri, H. Kawata, Y. Kobayashi, Y. Kojima, Y. Kondou, T. Kume, T. Matsumoto, H. Matsumura, H. Matsushita, S. Michizono, T. Miura, T. Miyajima, S. Nagahashi, H. Nakai, H. Nakajima, N. Nakamura, K. Nakanishi, K. Nakao, K.N. Nigorikawa, T. Nogami, S. Noguchi, S. Nozawa, T. Obina, T. Ozaki, F. Qiu, H. Sagehashi, H. Sakai, S. Sasaki, K. Satoh, M. Satoh, T. Shidara, M. Shimada, K. Shinoe, T. Shioya, T. Shishido, M. Tadano, T. Takahashi, R. Takai, T. Takenaka, Y. Tanimoto, M. Tobiyama, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, K. Watanabe, M. Yamamoto, Y. Yamamoto, Y. Yano, M. Yoshida
    KEK, Ibaraki, Japan
  • E. Cenni
    Sokendai, Ibaraki, Japan
  • R. Hajima, S.M. Matsuba, R. Nagai, N. Nishimori, M. Sawamura, T. Shizuma
    JAEA, Ibaraki-ken, Japan
  • H. Takaki
    ISSP/SRL, Chiba, Japan
 
  The 35-MeV Compact Energy Recovery Linac (the Compact ERL or cERL) is under construction at the High Energy Accelerator Research Organization (KEK) in Japan. With the Compact ERL, we aim at establishing cutting-edge technologies for the GeV-class ERL-based synchrotron light source. To install the accelerator components of the cERL, we have constructed a shielding room having an area of about 60 m x 20 m. We have then installed a 500-kV DC photocathode gun, a 5-MV superconducting (SC) cryomodule for the injector, a 30-MV SC cryomodule for the main linac, and some of the other components. High-power test on the main SC cryomodule is underway in December, 2012. High-power or high-voltage tests on the injector cryomodule and on the DC gun are planned during January to March, 2013. An injector of the Compact ERL will be commissioned in April, 2013. We report the newest status of its construction.  
 
WEPWO013 High Power Tests of Injector Cryomodule for Compact-ERL 2340
 
  • E. Kako, D.A. Arakawa, K. Hara, T. Honma, H. Katagiri, Y. Kojima, Y. Kondo, S. Michizono, T. Miura, H. Nakai, H. Nakajima, K. Nakanishi, S. Noguchi, T. Shishido, T. Takenaka, K. Watanabe, Y. Yamamoto
    KEK, Ibaraki, Japan
  • H. Hara, H. Hitomi, K. Sennyu
    MHI, Hiroshima, Japan
 
  In the cERL injector cryomodule, electron beams of 10 mA are accelerated from the beam energy of 500 keV to 5 MeV. A three 2-cell cavity system was chosen for the cERL injector. Each cavity is driven by two input couplers to reduce a required RF power handling capacity and also to compensate a coupler kick. In the cERL injector cryomodule, critical hardware components are not superconducting cavities but RF input couplers operating in CW mode. Six input couplers for the installation in the cryomodule were fabricated, and three pairs of input couplers were carefully conditioned. Costruction status, cool-down tests and high power RF test results on injector cryomodule for compact-ERL at KEK will be discussed in this paper.  
 
WEPME014 Progress in Development of New LLRF Control System for SuperKEKB 2953
 
  • T. Kobayashi, K. Akai, K. Ebihara, A. Kabe, K. Nakanishi, M. Nishiwaki, J.-I. Odagiri
    KEK, Ibaraki, Japan
  • H. Deguchi, K. Harumatsu, K. Hayashi, T. Iwaki, J. Mizuno, J. Nishio, M. Ryoshi
    Mitsubishi Electric TOKKI Systems, Amagasaki, Hyogo, Japan
 
  For the SuperKEKB project, a new LLRF control system was developed to realize high accuracy and flexibility. It is an FPGA-based digital RF feedback control system using 16-bit ADC's, which works on the μTCA platform. The FPGA boards control accelerating cavity fields and cavity tuning, and the EPICS-IOC is embedded in each of them. The CSS-BOY was adopted for a user interface of our system. High power test of the new LLRF control system was performed with the ARES Cavity of KEKB. The obtained feedback control stability with a klystron drive was sufficient as well as the low-level evaluation result. And auto tuner control also worded successfully. The start-up sequencer program for the cavity operation and auto-aging program also worked very well. The temperature characteristics of the system depend largely on band-pass filters (BPF). We tried to tune the BPF to reduce the temperature coefficient. Consequently the temperature dependence was improved to satisfy the required stability.