MOPEA062 |
Metrology of the NESTOR Facility Equipment |
222 |
|
- O. Bezditko, V.E. Ivashchenko, I.M. Karnaukhov, A. Mytsykov, A.V. Reuzayev, A.Y. Zelinsky
NSC/KIPT, Kharkov, Ukraine
|
|
|
Development of X-ray generator NESTOR in the National Science Center Kharkov Institute of Physics&Technology will let significantly extend the scientific program of investigations that are carried out in NSC KIPT, will allow to increase an amount and improve quality of experimental researches in the field of physics and chemistry In this work tolerances for accuracy installation of the lattice elements of the complex are defined. The methods of lattice element position measurement were detected and ways of their realization were defined. These allow to realize the project parameters of NESTOR facility and, first of all, generated X-ray beam intensity.
|
|
|
MOPEA063 |
The First Results of the NESTOR Commissioning |
225 |
|
- A.Y. Zelinsky, V.P. Androsov, O. Bezditko, V.N. Boriskin, P. Gladkikh, A.N. Gordienko, V.A. Grevtsev, A. Gvozd, V.E. Ivashchenko, A.A. Kalamayko, I.I. Karnaukhov, I.M. Karnaukhov, D. Korzhov, V.P. Kozin, V.A. Kushnir, V.P. Lyashchenko, M.P. Maksim, V.S. Margin, N.I. Mocheshnikov, V.V. Mytrochenko, A. Mytsykov, F.A. Peev, O.V. Ryezayev, V.P. Sergienko, A.A. Shcherbakov, S. Sheyko, V.L. Skirda, Y.N. Telegin, V.I. Trotsenko, O.P. Zolochevskij, O.D. Zvonarjova
NSC/KIPT, Kharkov, Ukraine
|
|
|
In the paper the first results of the NESTOR facility are presented. 60 MeV electron linac injector has been tested and the first electron beam with project parameters was registered at the screen monitors. Electron beam was passed through the transportation channel and injection system. As a result, the first turn of the storage ring was closed.
|
|
|
WEPWA060 |
The Kharkov X-ray Generator Facility NESTOR |
2253 |
|
- A.A. Shcherbakov, V.P. Androsov, N. Ayzatsky, V.N. Boriskin, E.V. Bulyak, A.N. Dovbnya, P. Gladkikh, A.N. Gordienko, V.A. Grevtsev, A. Gvozd, V.E. Ivashchenko, A.A. Kalamayko, I.I. Karnaukhov, I.M. Karnaukhov, V.P. Kozin, V.A. Kushnir, V.P. Lyashchenko, V.S. Margin, N.I. Mocheshnikov, V.V. Mytrochenko, A. Mytsykov, I.M. Neklyudov, T.F. Nikitina, F.A. Peev, O.V. Ryezayev, V.L. Skirda, V.A. Skomorokhov, Y.N. Telegin, V.I. Trotsenko, A.Y. Zelinsky, O.D. Zvonarjova
NSC/KIPT, Kharkov, Ukraine
- J.I.M. Botman
TUE, Eindhoven, The Netherlands
- I.V. Drebot
LAL, Orsay, France
|
|
|
The last few years the sources of the X-rays NESTOR based on a storage ring with low beam energy and Compton scattering of intense laser beam are under design and development in NSC KIPT. The main task of the project is to develop compact intense X-ray generator on the base of relatively cheap accelerator equipment and up-to-date laser technologies. The paper is devoted to description of the last results on construction and commissioning of the facility.
|
|
|
THPEA055 |
NESTOR Facility Control System |
3267 |
|
- D.V. Tarasov, V.N. Boriskin, I.M. Karnaukhov, D. Korzhov, V.N. Ljashchenko, A. Mytsykov, A.A. Shcherbakov, V.L. Skirda, V.I. Trotsenko, A.Y. Zelinsky
NSC/KIPT, Kharkov, Ukraine
|
|
|
The general principles of the NESTOR facility control system are presented in the paper. The main features of the systems such as magnetic, vacuum, diagnostic, Rf etc. concerning the control and monitoring are discussed. The first results of the system implementation are presented.
|
|
|
THPFI079 |
Start-up of the NESTOR Facility Vacuum System |
3478 |
|
- A.Y. Zelinsky, A.N. Gordienko, V.A. Grevtsev, I.I. Karnaukhov, I.M. Karnaukhov, N.I. Mocheshnikov, A. Mytsykov, V.L. Skirda
NSC/KIPT, Kharkov, Ukraine
|
|
|
The Kharkov X-ray generator NESTOR based on Compton backscattering is under commissioning. The vacuum system of the complex integrates a linear accelerator-injector, the beam transport channel and the electron storage ring with energy range from 40 to 225 MeV. Elements of vacuum chambers, pumping facilities, cleaning surfaces procedures are described. Chambers are made of stainless steel (SS). After vacuum pretesting pressure 5 × 10-9 Torr in the storage chambers ring achieved.
|
|
|