Author: Caspers, F.
Paper Title Page
MOPME044 A Novel Type of Forward Coupler Slotted Stripline Pickup Electrode for CSRe Stochastic Cooling 571
 
  • J.X. Wu, X.J. Hu, M. Li, J.W. Xia, J.C. Yang, Y. Zhang, G. Zhu
    IMP, Lanzhou, People's Republic of China
  • F. Caspers
    CERN, Geneva, Switzerland
 
  A novel type of slotted or perforated strip-line pick-up or kicker electrode structure for CSRe stochastic cooling for non relativistic particle beams with b=v/c values around 0.7 is presented. This slotted structure is to be used as a forward coupler with the output signal taken from the downstream end and has a rather large relative bandwidth of several octaves. The electrode structure and pickup tank, as well as the beam test result will be presented in this paper.  
 
MOPME073 Measurement of Schottky-like Signals from Linac Bunched Hadron Beams for Momentum Spread Evaluation 649
 
  • P. Kowina, P. Forck, R. Singh
    GSI, Darmstadt, Germany
  • F. Caspers
    CERN, Geneva, Switzerland
  • R. Singh
    TEMF, TU Darmstadt, Darmstadt, Germany
 
  We present a novel method for the measurement of Linac beam parameters in the longitudinal phase space. The longitudinal momentum spread can be evaluated by means of Schottky type signal analysis of bunched beams. There is a close similarity between a repetitive Linac bunch train and a circulating beam with a single short batch in a large machine like the LHC. A dedicated longitudinal cavity pick-up was used in the Linac where resonance frequency and Q-value were carefully selected in order to get an optimum compromise between the unavoidable coherent signal and the desired incoherent part of the beam spectrum. A time domain gating similar to the 4.8 GHz LHC Schottky front-end is applied. As a cross-check of the validity of the interpretation in terms of momentum spread, the Linac beam is analyzed in the downstream synchrotron using standard Schottky methods. In principle, this approach can be understood as an extension of Schottky analysis for circular machines with a perfect “mixing” between subsequent bunch trains. This contribution describes the test set-up and discusses the results of the measurements with a heavy ion beam.  
 
MOPWA030 Upgrade of the LHC Injection Kicker Magnets 729
 
  • M.J. Barnes, P. Adraktas, V. Baglin, G. Bregliozzi, S. Calatroni, F. Caspers, H.A. Day, L. Ducimetière, M. Garlaschè, V. Gomes Namora, J.M. Jimenez, N. Magnin, V. Mertens, E. Métral, B. Salvant, M. Taborelli, J.A. Uythoven, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The two LHC injection kicker systems, comprising 4 magnets per ring, produce a kick of 1.3 T.m with a rise-time of less than 900 ns and a flattop ripple of less than ±0.5%. A beam screen is placed in the aperture of each magnet, to provide a path for the image current of the high intensity LHC beam and screen the ferrite yoke against wake fields. The screen consists of a ceramic tube with conductors in the inner wall. The initially implemented beam screen ensured a low rate of electrical breakdowns while providing an adequate beam coupling impedance. Operation with increasingly higher intensity beams, stable for many hours at a time, now results in substantial heating of the ferrite yoke, sometimes requiring cool down over several hours before the LHC can be refilled. During the long shutdown in 2013/2014 all 8 kicker magnets will be upgraded with an improved beam screen and an increased emissivity of the vacuum tank. In addition equipment adjacent to the injection kickers and various vacuum components will also be modified to help reduce the vacuum pressure in the kickers during high-intensity operation. This paper discusses the upgrades as well as their preparation and planning.  
 
MOPWA031 Beam Induced Ferrite Heating of the LHC Injection Kickers and Proposals for Improved Cooling 732
 
  • M.J. Barnes, S. Calatroni, F. Caspers, L. Ducimetière, M. Garlaschè, V. Gomes Namora, V. Mertens, Z.K. Sobiech, M. Taborelli, J.A. Uythoven, W.J.M. Weterings
    CERN, Geneva, Switzerland
  • H.A. Day
    UMAN, Manchester, United Kingdom
 
  The two LHC injection kicker systems produce a kick of 1.3 T.m with a flattop duration variable up to 7860 ns, and rise and fall times of less than 900 ns and 3000 ns, respectively. A beam screen is placed in the aperture of each magnet, which consists of a ceramic tube with conductors in the inner wall. The conductors provide a path for the beam image current and screen the ferrite yoke against wake fields. Recent LHC operation, with high intensity beam stable for many hours, resulted in significant heating of both the ferrite yoke and beam impedance reduction ferrites. For one kicker magnet the ferrite yoke approached its Curie temperature. As a result of a long thermal time-constant the ferrites can require several hours to cool enough to re-inject beam, thus limiting the availability of the LHC. Thermal measurement data has been analysed, a thermal model developed and emissivity measurements carried out. The effects of various measures to improve the ferrite cooling have been simulated, including an improved emissivity of the vacuum tank and active cooling on the outside of the tank.  
 
MOPWA032 Reduction of Surface Flashover of the Beam Screen of the LHC Injection Kickers 735
 
  • M.J. Barnes, P. Adraktas, S. Calatroni, F. Caspers, L. Ducimetière, V. Gomes Namora, V. Mertens, R. Noulibos, M. Taborelli, B. Teissandier, J.A. Uythoven, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The LHC injection kicker magnets include beam screens to shield the ferrite yokes against wake fields resulting from the high intensity beam. The screening is provided by conductors lodged in the inner wall of a ceramic support tube. Operation with increasingly higher bunch intensity, and narrow bunches, now requires improved ferrite screening. This will be implemented by additional conductors; however the good high-voltage behaviour of the kicker magnets must not be compromised by the supplementary screening. Extensive studies and optimisations have been carried out, to better satisfy the often conflicting requirements for low beam coupling impedance, fast magnetic field rise-time, high vacuum and good high voltage behaviour. A new configuration is proposed which reduces significantly the electric field associated with the screen conductors and the secondary electron yield of the surface of the ceramic tube. Results of high voltage test results are also presented.  
 
TUPFI063 Electromagnetic Coupling between High Intensity LHC Beams and the Synchrotron Radiation Monitor Light Extraction System 1493
 
  • F. Roncarolo, W. Andreazza, A. Bertarelli, E. Bravin, F. Caspers, M. Garlaschè, A. Goldblatt, J-J. Gras, O.R. Jones, T. Lefèvre, E. Métral, A.A. Nosych, B. Salvant, G. Trad, R. Veness, C. Vollinger, M. Wendt
    CERN, Geneva, Switzerland
 
  The CERN LHC is equipped with two Synchrotron Radiation Monitor systems used to characterise transverse and longitudinal beam distributions. Since the end of the 2011 LHC run the light extraction system, based on a retractable mirror, has suffered deformation and mechanical failure that is correlated to the increase in beam intensity. Temperature probes have associated these observations to a strong heating of the mirror support with a dependence on the longitudinal bunch length and shape, indicating the origin as electromagnetic coupling between the beam and the structure. This paper combines all this information with the aim of characterising and improving the system in view of its upgrade during the current LHC shutdown. Beam-based observations are presented along with electromagnetic and thermomechanical simulations and complemented by laboratory measurements, including the study of the RF properties of different mirror bulk and coating materials.  
 
TUPME032 Update on Beam Induced RF Heating in the LHC 1646
 
  • B. Salvant, O. Aberle, G. Arduini, R.W. Aßmann, V. Baglin, M.J. Barnes, W. Bartmann, P. Baudrenghien, O.E. Berrig, A. Bertarelli, C. Bracco, E. Bravin, G. Bregliozzi, R. Bruce, F. Carra, F. Caspers, G. Cattenoz, S.D. Claudet, H.A. Day, M. Deile, J.F. Esteban Müller, P. Fassnacht, M. Garlaschè, L. Gentini, B. Goddard, A. Grudiev, B. Henrist, S. Jakobsen, O.R. Jones, O. Kononenko, G. Lanza, L. Lari, T. Mastoridis, V. Mertens, N. Mounet, E. Métral, A.A. Nosych, J.L. Nougaret, S. Persichelli, A.M. Piguiet, S. Redaelli, F. Roncarolo, G. Rumolo, B. Salvachua, M. Sapinski, R. Schmidt, E.N. Shaposhnikova, L.J. Tavian, M.A. Timmins, J.A. Uythoven, A. Vidal, J. Wenninger, D. Wollmann, M. Zerlauth
    CERN, Geneva, Switzerland
  • H.A. Day
    UMAN, Manchester, United Kingdom
  • L. Lari
    IFIC, Valencia, Spain
 
  Since June 2011, the rapid increase of the luminosity performance of the LHC has come at the expense of increased temperature and pressure readings on specific near-beam LHC equipment. In some cases, this beam induced heating has caused delays whilie equipment cools down, beam dumps and even degradation of these devices. This contribution gathers the observations of beam induced heating attributable to beam coupling impedance, their current level of understanding and possible actions that are planned to be implemented during the long shutdown in 2013-2014.  
 
TUPME033 Evaluation of the Beam Coupling Impedance of New beam Screen Designs for the LHC Injection Kicker Magnets 1649
 
  • H.A. Day
    UMAN, Manchester, United Kingdom
  • M.J. Barnes, F. Caspers, E. Métral, B. Salvant
    CERN, Geneva, Switzerland
  • R.M. Jones
    Cockcroft Institute, Warrington, Cheshire, United Kingdom
 
  The LHC injection kicker magnets (MKIs) have experienced a significant degree of beam induced heating since the beginning of the 2011 due to the increasing intensity stored in the LHC, for long periods of time, and the relatively large broadband impedance of the installed kicker magnets. In this paper we show the sources of impedance in the MKIs, especially the effect that the beam screen dimensions have on the impedance. We show how these alter the power loss, and present an improved beam screen design that improves shielding on the magnet, whilst further improving electrical breakdown.  
 
TUPWA041 Reduction of Secondary Electron (SEY) Yield Figures on Smooth Metallic Surfaces by Means of Magnetic Roughness 1799
 
  • M. Taborelli, F. Caspers, M. Mensi
    CERN, Geneva, Switzerland
  • L.S. Aguilera, I. Montero
    CSIC, Madrid, Spain
 
  High secondary electron yield of metallic surfaces used in accelerator and also space applications is of general concern. In addition to several well known coating techniques and microscopic or macroscopic mechanical roughness (grooves) which may significantly increase microwave losses the concept of magnetic surface roughness has been proposed recently. In this concept a smooth and very well conductimg surface with low microwave losses is maintained, but underneath this surface a large number of tiny permanent magnets are located to build a rough magnetic equipotential structure. In this paper we present and discuss measurement of the SEY and the improvement in terms of SEY for different parameter ranges  
 
TUPWA042 Lessons Learned and Mitigation Measures for the CERN LHC Equipment with RF Fingers 1802
 
  • E. Métral, O. Aberle, R.W. Aßmann, V. Baglin, M.J. Barnes, O.E. Berrig, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Carra, F. Caspers, H.A. Day, M. Ferro-Luzzi, M.A. Gallilee, C. Garion, M. Garlaschè, A. Grudiev, J.M. Jimenez, O.R. Jones, O. Kononenko, R. Losito, J.L. Nougaret, V. Parma, S. Redaelli, B. Salvant, P.M. Strubin, R. Veness, C. Vollinger, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  Beam-induced RF heating has been observed in several LHC components when the bunch/beam intensity was increased and/or the bunch length reduced. In particular eight bellows, out of the ten double-bellows modules present in the machine in 2011, were found with the spring, which should keep the RF fingers in good electrical contact with the central insert, broken. Following these observations, the designs of all the components of the LHC equipped with RF fingers have been reviewed. The lessons learnt and mitigation measures are presented in this paper.  
 
TUPWA043 Impedance Studies for VMTSA Module of LHC Equipped with RF Fingers 1805
 
  • O. Kononenko, F. Caspers, A. Grudiev, E. Métral, B. Salvant
    CERN, Geneva, Switzerland
 
  During 2011 run of LHC it was found that beam-induced heating causes many issues for accelerator components. Particularly some of the double-bellow modules, called VMTSA modules, were found to have deformed RF fingers and a broken spring which ensured good contact between them and a central insert. Impedance studies have been performed for different types of nonconformities and benchmarked against measurements. It was found that even a small gap between the fingers and a central insert could be fatal for the VMTSA operation. Results of this study were an input for the further thermal analysis.  
 
WEPEA053 Progress with the Upgrade of the SPS for the HL-LHC Era 2624
 
  • B. Goddard, T. Argyropoulos, W. Bartmann, H. Bartosik, T. Bohl, F. Caspers, K. Cornelis, H. Damerau, L.N. Drøsdal, L. Ducimetière, J.F. Esteban Müller, R. Garoby, M. Gourber-Pace, W. Höfle, G. Iadarola, L.K. Jensen, V. Kain, R. Losito, M. Meddahi, A. Mereghetti, V. Mertens, Ö. Mete, E. Montesinos, Y. Papaphilippou, G. Rumolo, B. Salvant, E.N. Shaposhnikova, M. Taborelli, H. Timko, F.M. Velotti
    CERN, Geneva, Switzerland
  • E. Gianfelice-Wendt
    Fermilab, Batavia, USA
 
  The demanding beam performance requirements of the HL-LHC project translate into a set of requirements and upgrade paths for the LHC injector complex. In this paper the performance requirements for the SPS and the known limitations are reviewed in the light of the 2012 operational experience. The various SPS upgrades in progress and still under consideration are described, in addition to the machine studies and simulations performed in 2012. The expected machine performance reach is estimated on the basis of the present knowledge, and the remaining decisions that still need to be made concerning upgrade options are detailed.  
 
WEPEA063 Upgrades and Consolidation of the CERN AD for Operation during the Next Decades 2654
 
  • T. Eriksson, M. E. Angoletta, L. Arnaudon, J.A. Baillie, M. Calviani, F. Caspers, L.V. Joergensen, R. Kersevan, G. Le Godec, R. Louwerse, M. Ludwig, S. Maury, A. Newborough, C. Oliveira, G. Tranquille
    CERN, Geneva, Switzerland
 
  As the ELENA project is now well underway, focus is turned to the Antiproton Decelerator (AD) itself. Most of the machine’s key components are in operation since more than 25 years and a substantial consolidation program is now being launched in view of continued operation beyond 2025. Over the course of the next few years a progressive consolidation of the AD-Target area, the AD-ring and all associated systems will take place. Several investigations have recently been performed in the target area with the objective of establishing the radiation environment and the sensitivity of the antiproton production to potential misalignment of the production elements. Identification of reliability and serviceability issues of the AD-ring components and associated systems has been done and will continue during the 2013 shut-down. Planned and ongoing consolidation activities are also discussed with emphasis on stochastic and electron beam cooling, instrumentation, RF systems, vacuum, magnets, power converters and beam transfer equipment.  
 
WEPFI054 Enlargement of Tuning Range in a Ferrite-tuned Cavity through Superposed Orthogonal and Parallel Magnetic Bias 2812
 
  • C. Vollinger, F. Caspers
    CERN, Geneva, Switzerland
 
  Conventional ferrite-tuned cavities operate either with bias fields that are orthogonal or parallel to the magnetic RF-field. For a cavity that tunes rapidly over an overall frequency range around 100-400 MHz with high Q, we use ferrite garnets exposed to an innovative new biasing method consisting of a superposition of perpendicular and parallel magnetic fields. This method leads to a significant enlargement of the high-Q cavity tuning range by defining an operation point close to the magnetic saturation and thus improving ferrite material behaviour. A further advantage of this technique is the fast tuning speed resulting from the fact that tuning is carried out either with pure parallel biasing, or together with a very small change of operating point from perpendicular bias. In this paper, several scaled test models of ferrite-filled resonators are shown; measurements on the set-ups are compared and discussed.  
 
THPFI050 Some Ideas Towards Energy Optimization at CERN 3400
 
  • H.J. Burckhart, J.-P. Burnet, F. Caspers, V. Doré, L. Gatignon, C. Martel, M. Nonis, D. Tommasini
    CERN, Geneva, Switzerland
 
  The paper presents the efforts of CERN to optimize its energy usage. Work is proceeding in 3 areas: accelerators, campus and infrastructure, and re-use of thermal “waste” energy. The accelerator chain has the potential to further reduce the energy consumption by dynamic suppression of cycles when they are temporarily not needed and by operating magnets in pulsed mode. R&D for future accelerators includes the recuperation of the RF energy, which is not used for acceleration of the beams. Concerning the CERN campus more than half of the buildings are older than 40 years. Hence there is a big need for renovation, which includes energy aspects. New buildings use renewable energy whenever possible. As an example a building is under construction, which will use a 250 m2 solar field together with an absorption refrigerator for cooling purposes. Finally, about 80% of the electric energy gets dissipated in air cooling towers. Part of this energy can be re-used for heating buildings.  
 
THPFI051 Radio-Frequency Multipacting as Quality Control of Coatings for e-Cloud Suppression 3403
 
  • P. Costa Pinto, J. Bauche, S. Calatroni, F. Caspers, P. Edwards, M. Holz, M. Taborelli
    CERN, Geneva, Switzerland
 
  To mitigate electron clouds in particle accelerators, a carbon coating with low SEY has been developed. In the case of the SPS (Super Proton Synchrotron), which belongs to the LHC injector chain, testing the performance of coated beam pipes directly in the accelerator must cope with the schedule of the regular machine operation. For this reason an alternative instrument based on RF induced multipacting in a coaxial configuration has been designed for ex-situ characterization of the main bending dipoles of the SPS. In this contribution we report the results obtained before and after coating for two 6.4 meter dipoles with different cross sections of the vacuum chambers. The multipacting is monitored by measuring the pressure rise and the RF reflected power. After coating, the power threshold to induce multipacting is strongly reduced indicating a lower propensity for electron cloud. The impact of the RF coupling on the sensitivity of the technique is discussed.  
 
THPFI052 Application of Atmospheric Plasma-sprayed Ferrite Layers for Particle Accelerators 3406
 
  • F. Caspers, M. Betz, S. Federmann, M. Taborelli
    CERN, Geneva, Switzerland
  • K. K., C.A.M. Schulz
    Surface Engineering Institute, RWTH Aachen University, Aachen, Germany
  • J.X. Wu
    IMP, Lanzhou, People's Republic of China
 
  A common problem in all kind of cavity like structures in particle accelerators is the occurrence of RF-resonances. Typically, ferrite plates attached to the walls of such structures like diagnostic devices, kickers or collimators, are used to dampen those undesired modes. However the heat transfer rate from these plates to the walls is rather limited. Brazing ferrite plates to the walls is not possible in most cases due to the different thermal expansion coefficients. To overcome those limitations, atmospheric plasma spraying techniques have been investigated. Ferrite layers with a thickness from 50 micron to about 300 micron can be deposited on metallic surfaces like stainless steel exhibiting good thermal contact and still reasonable absorption properties. In this paper the technological aspects of plasma deposition are discussed and results of specifically developed RF loss measurement procedures for such thin magnetically lossy layers on metal are presented. This kind of layers can also be applied for the production of high temperature RF power loads and related examples will be shown.  
 
THPWA034 Overview of CERN Technology Transfer Strategy and Accelerator-related Activities 3702
 
  • E. Chesta, A. Bertarelli, F. Caspers, P. Chiggiato, S. Sgobba, T. Stora, M. Taborelli, W. Wuensch
    CERN, Geneva, Switzerland
 
  CERN, the European Organization for Nuclear Research, is actively engaged in identifying technologies developed for its accelerator complex that could be profitably used by partner research organizations or commercial companies in applications with potentially high socio-economic impact beyond pure fundamental physics research. In the first part of the paper, an overview of CERN current strategy in the field of Technology Transfer and Intellectual Property Management will be presented, with details on the most effective models, implementation tools and processes developed to achieve satisfactory dissemination and valorisation of the knowledge generated within the Organization. In the second part, CERN currently available technology portfolio will be described with focus on cases originated from the Accelerator and Technology Sector. A selection of promising on-going projects embracing a variety of technology fields and application areas will be detailed to showcase technical challenges and possible benefits of initiatives driven by (but not limited to) the needs of CERN scientific programme.