Author: Carlier, E.
Paper Title Page
MOPFI050 Non-local Fast Extraction from the CERN SPS at 100 and 440 GeV 392
 
  • F.M. Velotti, A. Alekou, W. Bartmann, E. Carlier, K. Cornelis, I. Efthymiopoulos, B. Goddard, L.K. Jensen, V. Kain, M. Kowalska, V. Mertens, R. Steerenberg
    CERN, Geneva, Switzerland
 
  The Long Straight Section 2 (LSS2) of the CERN SPS is connected with the North Area (NA), to which the beam to date has always been extracted using a resonant extraction technique. For new proposed short- and long-baseline neutrino experiments, a fast single turn extraction to this experimental area is required. As there are no kickers in LSS2, and the integration of any new kickers with the existing electrostatic septum would be problematic, a solution has been developed to fast extract the beam using non-local extraction with other SPS kickers. Two different kicker systems have been used, the injection kicker in LSS1 and the stronger extraction kicker in LSS6 to extract 100 and 440 GeV beam, respectively. For both solutions a large emittance beam was extracted after 5 or 9 full betatron periods. The concept and simulation details are presented with the analysis of the aperture and beam loss considerations and experimental results collected during a series of beam tests.  
 
MOPFI052 A New Lead Ion Injection System for the CERN SPS with 50 ns Rise Time 398
 
  • B. Goddard, O. Aberle, J. Borburgh, E. Carlier, K. Cornelis, L. Ducimetière, L.K. Jensen, T. Kramer, D. Manglunki, A. Mereghetti, V. Mertens, D. Nisbet, B. Salvant, L. Sermeus
    CERN, Geneva, Switzerland
 
  The LHC High Luminosity upgrade project includes a performance upgrade for heavy ions. One of the present performance limitations is the rise time of the SPS injection kicker system, which imposes a spacing of at least 220 ns between injected bunch trains at the operational rigidity. A reduction of this rise time to 50 ns for lead ions is requested as part of the suite of measures needed to increase the present design performance by a factor three. A new injection system based on a fast pulsed septum and a fast kicker has been proposed to fulfil this rise time requirement, and to meet all the constraints associated with the existing high intensity proton injection in the same region. This paper describes the concept and the required equipment parameters, and explores the implications of such a system for SPS operation.  
 
WEPEA060 Plans for the Upgrade of CERN's Heavy Ion Complex 2645
 
  • D. Manglunki, M. E. Angoletta, H. Bartosik, A. Blas, D. Bodart, M.A. Bodendorfer, T. Bohl, J. Borburgh, E. Carlier, J.-M. Cravero, H. Damerau, L. Ducimetière, A. Findlay, R. Garoby, S.S. Gilardoni, B. Goddard, S. Hancock, E.B. Holzer, J.M. Jowett, T. Kramer, D. Kuchler, A.M. Lombardi, Y. Papaphilippou, S. Pasinelli, R. Scrivens, G. Tranquille
    CERN, Geneva, Switzerland
 
  To reach a luminosity higher than 6×1027 Hz/cm2 for Pb-Pb collisions, as expected by the ALICE experiment after its upgrade during the 2nd Long LHC Shutdown (LS2), several upgrades will have to be performed in the CERN accelerator complex, from the source to the LHC itself. This paper first details the present limitations and then describes the strategy for the different machines in the ion injector chain. Both filling schemes and possible hardware upgrades are discussed.  
 
WEPEA061 The First LHC p-Pb run: Performance of the Heavy Ion Production Complex 2648
 
  • D. Manglunki, M. E. Angoletta, H. Bartosik, G. Bellodi, A. Blas, M.A. Bodendorfer, T. Bohl, C. Carli, E. Carlier, S. Cettour Cave, K. Cornelis, H. Damerau, A. Findlay, S.S. Gilardoni, S. Hancock, J.M. Jowett, D. Kuchler, M. O'Neil, Y. Papaphilippou, S. Pasinelli, R. Scrivens, G. Tranquille, B. Vandorpe, U. Wehrle, J. Wenninger
    CERN, Geneva, Switzerland
 
  TThe first LHC proton-ion run took place in January-February 2013; it was the first extension to the collider programme, as this mode was not included in the design report. This paper presents the performance of the heavy ion and proton production complex, and details the issues encountered, in particular the creation of the same bunch pattern in both beams.  
 
THPEA041 Performance Improvements of the SPS Internal Beam Dump for the HL-LHC Beam 3231
 
  • F.M. Velotti, O. Aberle, C. Bracco, E. Carlier, P. Chiggiato, J.A. Ferreira Somoza, B. Goddard, M. Meddahi, V. Senaj, J.A. Uythoven
    CERN, Geneva, Switzerland
 
  The SPS internal beam dump has been designed for beam specifications well below the HL-LHC ones, and for modes of operation which may not be adequate for the HL-LHC era. The present system suffers from several limitations in the allowed intensity and energy range, and its vacuum performance affects nearby high-voltage kicker systems. In this report the limitations of the internal beam dump system are reviewed, and the possible improvements compared. Preliminary upgrade proposals are presented, taking into consideration the expected operational HL-LHC parameters.  
 
THPWO078 Status of the Upgrade of the CERN PS Booster 3939
 
  • K. Hanke, O. Aberle, M. E. Angoletta, W. Bartmann, S. Bartolome, E. Benedetto, C. Bertone, A. Blas, P. Bonnal, J. Borburgh, D. Bozzini, A.C. Butterworth, C. Carli, E. Carlier, J.R.T. Cole, P. Dahlen, M. Delonca, T. Dobers, A. Findlay, R. Froeschl, J. Hansen, D. Hay, S. Jensen, J.-M. Lacroix, P. Le Roux, L.A. Lopez Hernandez, C. Maglioni, A. Masi, G.W. Mason, S.J. Mathot, B. Mikulec, Y. Muttoni, A. Newborough, D. Nisbet, S. Olek, M.M. Paoluzzi, A. Perillo-Marcone, S. Pittet, B. Puccio, V. Raginel, B. Riffaud, I. Ruehl, A. Sarrió Martínez, J. Tan, B. Todd, V. Venturi, W.J.M. Weterings
    CERN, Geneva, Switzerland
 
  The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2.0 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.