Author: Nakamura, N.
Paper Title Page
THPPR043 Applications of X-band 950 keV and 3.95 MeV Linac X-ray Source for On-site Inspection 4071
 
  • M. Uesaka, K. Demachi, K. Dobashi, T. Fujiwara, H.F. Jin, M. Jin, H. Zhu
    The University of Tokyo, Nuclear Professional School, Ibaraki-ken, Japan
  • Y. Hattori
    Hitachi Engineering & Services Co.,Ltd., Japan
  • J. Kusano, N. Nakamura, M. Yamamoto
    Accuthera Inc., Kawasaki, Kanagawa, Japan
  • I. Miura
    Mitsubishi Chemical Corporation, Japan
  • E. Tanabe
    AET, Kawasaki-City, Japan
 
  Our portable X-band (9.3GHz) 950KeV linac has been successfully upgraded. The problems of RF power oscillation, beam current oscillation and reduction and finally lack of X-ray intensity were solved by replacing the axial coupling cavities with the side-coupled ones. Designed X-ray dose rate of 0.05 Sv/min@1m is going to be achieved. X-ray source part with the local radiation shielding is connected by the flexible waveguide with the box of a 250 kW magnetron and a cooling unit. The total system consists of the three suit-case-size units, the last of which is one for the electric power supply. We have also developed a portable X-band (9.3GHz) 3.95MeV linac for on-site bridge inspection. The system consists of a 62kg X-ray source part without 80kg target collimator, a 62kg RF power source and other utility box of 116kg. Designed X-ray dose rate is 2 Sv/min@1m with 200pps repetition rate and we have achieved 0.5 Sv/min@1m with 50pps repetition rate. Demonstration of the measurement of wall thinning of metal pipes with thick thermal shielding by 950keV linac and degradation of reinforced concrete sample by 3.95MeV is under way. Updated measurement results will be presented.  
 
MOPPP018 Construction Status of the Compact ERL 607
 
  • S. Sakanaka, H. Kawata, Y. Kobayashi, N. Nakamura
    KEK, Ibaraki, Japan
  • R. Hajima
    JAEA, Ibaraki-ken, Japan
 
  Future synchrotron light source based on a 3-GeV energy recovery linac (ERL) is under proposal at KEK, and we are conducting extensive R&D efforts. To demonstrate reliable operations of key components for the ERL project, as well as to demonstrate the generation of ultra-low emittance beams, we are constructing the Compact ERL (cERL). The cERL will also be used to demonstrate the generation of brilliant gamma-rays that is useful for analyzing radioisotopes. Key components, such as a photocathode DC gun, both cryomodules for the injector and the main linac, rf sources, magnets, and beam instrumentations, are under fabrication. Construction of radiation shielding for the cERL started in December, 2011. We report up-to-date status of the cERL.  
 
TUXB02 Review of ERL Projects at KEK and Around the World 1040
 
  • N. Nakamura
    KEK, Ibaraki, Japan
 
  Future synchrotron light sources based on energy-recovery linacs (ERLs) are expected to be capable of producing super-brilliant and/or ultra-short pulses of synchrotron radiation. The Japanese collaboration team is making efforts for realizing an ERL-based VUV and X-ray source with R&D efforts on super-conducting cavities and the electron gun at KEK and elsewhere. This presentation will describe the developments of the compact ERL project and the outline of the 3-GeV ERL light source project at KEK and also review ERL projects around the world, including potential applications to colliders.  
slides icon Slides TUXB02 [25.328 MB]  
 
TUPPP016 Recent Development of PF Ring and PF-AR 1641
 
  • Y. Tanimoto, T. Aoto, S. Asaoka, K. Endo, K. Haga, K. Harada, T. Honda, Y. Honda, M. Izawa, Y. Kobayashi, A. Mishina, T. Miyajima, H. Miyauchi, S. Nagahashi, N. Nakamura, T. Nogami, T. Obina, T. Ozaki, C.O. Pak, H. Sakai, S. Sakanaka, H. Sasaki, Y. Sato, K. Satoh, M. Shimada, K. Shinoe, T. Shioya, M. Tadano, T. Tahara, T. Takahashi, R. Takai, K. Tsuchiya, T. Uchiyama, A. Ueda, K. Umemori, M. Yamamoto
    KEK, Ibaraki, Japan
  • H. Takaki
    ISSP/SRL, Chiba, Japan
 
  After the earthquake of March 11, two light sources of KEK, PF ring and PF-AR, have recovered the regular operation from October, 2011. We installed tandem variably-polarized undulators at PF ring in 2009. Recently, the orbit switching system has been completed with sufficient feed-forward orbit compensation at 10-Hz. PF ring is usually operated at 450 mA with a top-up injection using the pulsed sextupole magnet instead of the conventional kicker magnets. The transverse and longitudinal instabilities are suppressed by a digital feedback system using the iGp signal processor. In the longitudinal direction, we observed unstable quadrupole mode oscillation which could not be controlled by the feedback system. We had applied the phase modulation of the main RF cavity to stabilize the quadrupole oscillation before. Old-type RF-shielded gate valves damaged by the earthquake were removed from the ring during the summer maintenance. In the operation after autumn, the quadrupole oscillation can be cured by dividing the bunch train of partial-filling. Without the phase modulation, the effective brightness of SR beam has been improved especially at beam lines of finite dispersion function.