Author: Li, Y.
Paper Title Page
MOYBA4 eRHIC Design Update 18
TUPLO11   use link to see paper's listing under its alternate paper code  
 
  • C. Montag, G. Bassi, J. Beebe-Wang, J.S. Berg, M. Blaskiewicz, A. Blednykh, J.M. Brennan, S.J. Brooks, K.A. Brown, K.A. Drees, A.V. Fedotov, W. Fischer, D.M. Gassner, Y. Hao, A. Hershcovitch, C. Hetzel, D. Holmes, H. Huang, W.A. Jackson, J. Kewisch, Y. Li, C. Liu, H. Lovelace III, Y. Luo, F. Méot, M.G. Minty, R.B. Palmer, B. Parker, S. Peggs, V. Ptitsyn, V.H. Ranjbar, G. Robert-Demolaize, S. Seletskiy, V.V. Smaluk, K.S. Smith, S. Tepikian, P. Thieberger, D. Trbojevic, N. Tsoupas, S. Verdú-Andrés, W.-T. Weng, F.J. Willeke, H. Witte, Q. Wu, W. Xu, A. Zaltsman, W. Zhang
    BNL, Upton, New York, USA
  • Y. Cai, Y.M. Nosochkov
    SLAC, Menlo Park, California, USA
  • E. Gianfelice-Wendt
    Fermilab, Batavia, Illinois, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.
The future electron-ion collider (EIC) aims at an electron-proton luminosity of 1033 to 1034 cm-2 sec-1 and a center-of-mass energy range from 20 to 140 GeV. The eRHIC design has been continuously evolving over a couple of years and has reached a considerable level of maturity. The concept is generally conservative with very few risk items which are mitigated in various ways.
 
slides icon Slides MOYBA4 [5.466 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-MOYBA4  
About • paper received ※ 24 August 2019       paper accepted ※ 31 August 2019       issue date ※ 08 October 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THXBA2 Analysis of Beam Position Monitor Requirements with Bayesian Gaussian Regression 912
WEPLM09   use link to see paper's listing under its alternate paper code  
 
  • Y. Li, R.S. Rainer
    BNL, Upton, New York, USA
  • W.X. Cheng
    ANL, Lemont, Illinois, USA
  • Y. Hao
    FRIB, East Lansing, Michigan, USA
 
  Funding: This research is supported by U.S. Department of Energy under Contract No. DE-SC0012704, and the NSF under Cooperative Agreement PHY-1102511.
With a Bayesian Gaussian regression approach, a systematic method for analyzing a storage ring’s beam position monitor (BPM) system requirements has been developed. The ultimate performance of a ring-based accelerator, based on brightness or luminosity, is determined not only by global parameters, but also by local beam properties at some particular points of interest (POI). BPMs used for monitoring the beam properties, however, can not be located at these points. Therefore, the underlying and fundamental purpose of a BPM system is to predict whether the beam properties at POIs reach their desired values. The prediction process is a regression problem with BPM readings as the training data, but containing random noise. A Bayesian Gaussian regression approach can determine the probability distribution of the predictive errors, which can be used to conversely analyze the BPM system requirements. This approach is demonstrated by using turn-by-turn data to reconstruct a linear optics model, and predict the brightness degradation for a ring-based light source. The quality of BPMs was found to be more important than their quantity in mitigating predictive errors.
 
slides icon Slides THXBA2 [3.205 MB]  
poster icon Poster THXBA2 [7.083 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-NAPAC2019-THXBA2  
About • paper received ※ 16 August 2019       paper accepted ※ 04 September 2019       issue date ※ 08 October 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)