Paper | Title | Page |
---|---|---|
MOZGBD3 | Performance of the First LCLS-II Cryomodules: Issues and Solutions | 34 |
|
||
LCLS-II 4 GeV linac is on the middle production stage. Linac contains 40 cryomodules of 1.3 GHz and 3 cryomodules of 3.9 GHz, including spares. Fermilab and JLAB share responsibility for cryomodule design, assembly and test. Paper will overview the performance of the cryomodules it the tests, lessons learned and modifications in design to improve performance. | ||
![]() |
Slides MOZGBD3 [8.630 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-MOZGBD3 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPML001 | Passive Microphonics Mitigation during LCLS-II Cryomodule Testing at Fermilab | 2668 |
|
||
Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics. The LCLS-II project calls for cryomodule production and testing at both Fermilab and JLab. Due to low beam loading and high cavity quality factor, the designed peak detuning specification is 10 Hz. Initial testing showed peak detuning up to 150 Hz with a complex and varying time-structure, showing both fast (1-2 second) and slow (1-2 hour) drifts in amplitude and spectrum. Extensive warm and cold testing showed Thermoacoustic Oscillations in the cryogenic valves were the primary source of the microphonics. This was mitigated by valve wipers and valve re-plumbing, resulting in a greatly improved cavity detuning environment. Additional modifications were made to the cavity mechanical supports and Fermilab test stand to improve detuning performance. These modifications and testing results will be presented. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML001 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPML009 | Superconducting Magnet Performance in LCLS-II Cryomodules | 2693 |
|
||
Abstract' New LCLS-II Linear Superconducting Accelerator Cryomodules under construction at Fermilab. Inside each SCRF Cryomodule installed superconducting magnet package to focus and steer an electron beam. The magnet package has the iron dominated configuration with racetrack type quadrupole and dipole conductively cooled coils. For easier installation the magnet could be split in the vertical plane. Initially the magnet was tested in a liquid helium bath, and were performed high precision magnetic field measurements. Several Cryomodules with magnets inside were built and successfully tested at Fermilab test facility. In the paper presented Cryomodule magnet packages test results, discussed the magnet, and current leads conduction cooling performance. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML009 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPML022 | 3.9 GHz Power Coupler Design and Tests for LCLS-II Project | 2727 |
|
||
LCLS-II linac requires two 3.9 GHz cryomodules (eight cavities per CM), operating up to 16MV/m in cw regime. Fermilab has designed and built few prototypes of the cavity and auxiliaries and tested them at the vertical and horizontal cryostats. Fundamental power coupler, based on existing design (FLASH, XFEL) was redesign for 2kW average power. We built three prototypes and tested them at room temperature test stand. One coupler was assembled on the cavity and tested at horizontal cryostat as part of design verification program. Test results and comparison with simulations are discussed in this paper. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-WEPML022 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPMF024 | Commissioning and Operation of FAST Electron Linac at Fermilab | 4096 |
|
||
We report results of the beam commissioning and first operation of the 1.3 GHz superconducting RF electron linear accelerator at Fermilab Accelerator Science and Technology (FAST) facility. Construction of the linac was completed and the machine was commissioned with beam in 2017. The maximum total beam energy of about 300 MeV was achieved with the record energy gain of 250 MeV in the ILC-type SRF cryomodule. The pho-toinjector was tuned to produce trains of 200 pC bunches with a frequency of 3 MHz at a repetition rate of 1 Hz. This report describes the aspects of machine commission-ing such as tuning of the SRF cryomodule and beam optics optimization. We also present highlights of an experimental program carried out parasitically during the two-month run, including studies of wake-fields, and advanced beam phase space manipulation. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2018-THPMF024 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |