TUP105 Preparation of the Cryomodule Assembly for the Linear IFMIF Prototype Accelerator (LIPAc) in Rokkasho 726
 
  • T. Ebisawa, A. Kasugai, K. Kondo, S. Maebara, K. Sakamoto
    QST, Aomori, Japan
  • N. Bazin, S. Berry
    CEA-DRF-IRFU, France
  • P. Cara
    IFMIF/EVEDA, Rokkasho, Japan
  • H. Dzitko, G. Phillips
    F4E, Germany
  • E. Kako, H. Sakai, K. Umemori
    KEK, Ibaraki, Japan
 
  The staged installation and commissioning of LIPAc is ongoing at Rokkasho Fusion Institute of QST, Japan for validating the low energy section of the IFMIF deuteron accelerator up to 9 MeV. The LIPAc Superconducting Radio Frequency accelerator (SRF) cryomodule is assembled under the responsibility of the EU Home Team, and the assembly work recently started at Rokkasho in March 2019. To fulfil the cleanliness requirements for the assembly process, QST took the responsibility to prepare the infrastructure of a cleanroom and associated devices. In this present paper, the details of the preparation work for the cryomodule assembly made by QST will be presented.  
poster icon Poster TUP105 [2.116 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-TUP105  
About • paper received ※ 17 June 2019       paper accepted ※ 01 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WETEA3 Status of the IFMIF/EVEDA Superconducting Linac 735
 
  • N. Bazin, G. Devanz, H. Jenhani, O. Piquet
    CEA-DRF-IRFU, France
  • S. Chel
    CEA-IRFU, Gif-sur-Yvette, France
  • T. Ebisawa
    QST, Aomori, Japan
  • G. Phillips
    F4E, Germany
  • D. Regidor, F. Toral
    CIEMAT, Madrid, Spain
 
  The IFMIF accelerator aims to provide an accelerator-based D-Li neutron source to produce high intensity high energy neutron flux to test samples as possible candidate materials to a full lifetime of fusion energy reactors. A prototype of the low energy part of the accelerator (LIPAc) is under construction at Rokkasho Fusion Institute in Japan. It includes one cryomodule containing 8 half-wave resonators (HWR) operating at 175 MHz and eight focusing solenoids. The talk will cover the progress of developments in the IFMIF/EVEDA cryomodule: the qualification of 8 cavities, the RF conditioning results of 8 high-power couplers, the manufacturing and test of the 8 superconducting solenoids and the equivalent operational equivalent tests performed at Saclay. The assembling status of the cryomodule at Rokkasho site will also be presented.  
slides icon Slides WETEA3 [11.091 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-WETEA3  
About • paper received ※ 20 June 2019       paper accepted ※ 29 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)