Paper |
Title |
Page |
MOP058 |
ESS Medium Beta Activity at INFN LASA |
199 |
|
- D. Sertore, M. Bertucci, A. Bignami, A. Bosotti, M. Chiodini, A. D’Ambros, G. Fornasier, P. Michelato, L. Monaco, R. Paparella
INFN/LASA, Segrate (MI), Italy
- S. Aurnia, O. Leonardi, A. Miraglia, G. Vecchio
INFN/LNS, Catania, Italy
- A. Gresele, A. Visentin
Ettore Zanon S.p.A., Nuclear Division, Schio, Italy
- C. Pagani
Università degli Studi di Milano & INFN, Segrate, Italy
- D. Reschke, A. Sulimov, M. Wiencek
DESY, Hamburg, Germany
- D. Rizzetto, M. Rizzi
Ettore Zanon S.p.A., Schio, Italy
- L. Sagliano
ESS, Lund, Sweden
|
|
|
The industrial production of the 36 resonators (plus 2 spares) for the ESS linac started and it is steadily progressing. Cavities are delivered by industry as fully surface-treated and dressed to AMTF facility at DESY for their qualification via vertical cold-test. This paper reports the current status of the manufacturing process from sub-components to processing of the complete cavity inner surface. It also reviews the documental control strategy deployed to preserve the fulfillment of ESS requirements as well as the cavity performances demonstrated so far.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2019-MOP058
|
|
About • |
paper received ※ 23 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOP060 |
INFN-LASA for the PIP-II Project |
205 |
|
- R. Paparella, M. Bertucci, A. Bignami, A. Bosotti, M. Chiodini, A. D’Ambros, P. Michelato, L. Monaco, D. Sertore
INFN/LASA, Segrate (MI), Italy
- J.F. Chen
SARI-CAS, Pudong, Shanghai, People’s Republic of China
- C. Pagani
Università degli Studi di Milano & INFN, Segrate, Italy
- L. Sagliano
ESS, Lund, Sweden
|
|
|
INFN-LASA joined the international effort for the PIP-II project in Fermilab to build the 650 MHz superconducting cavities realizing the low-beta section of the 800 MeV proton linac. After developing the electro-magnetic and mechanical design, INFN-Milano started the prototyping phase by producing five single-cells and two complete 5-cells cavities. This paper reports the status of PIP-II activities at INFN-LASA summarizing manufacturing experience and preliminary experimental results.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2019-MOP060
|
|
About • |
paper received ※ 24 June 2019 paper accepted ※ 30 June 2019 issue date ※ 14 August 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|