THP026 Initial Operation of the LCLS-II Electron Source 891
 
  • C. Adolphsen, A.L. Benwell, G.W. Brown, M.P. Dunning, S. Gilevich, K. Grouev, X. Liu, J.F. Schmerge, T. Vecchione, F.Y. Wang, F. Zhou
    SLAC, Menlo Park, California, USA
  • G. Huang, M.J. Johnson, T.H. Luo, F. Sannibale, S.P. Virostek
    LBNL, Berkeley, California, USA
 
  Funding: This work supported under DOE Contract DE-AC02-76SF00515
The Early Injector Commissioning program for LCLS-II aims to demonstrate CW electron beam production this year in the first two meters of the injector that includes the room-temperature 185.7 MHz single-cell gun and the 1.3 GHz two-cell buncher cavity. These cavities were designed and built by LBNL based on their experience with similar ones for their Advanced Photo-Injector Experiment (APEX) program. With the 258 nm laser system and Cs2Te cathodes, bunches of up to 300 pC are expected at rates as high as 1 MHz. The paper presents results from this program including the vacuum levels achieved, RF processing and field control experience, dark current measurements and laser and beam characterization.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP026  
About • paper received ※ 26 June 2019       paper accepted ※ 30 June 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THP049 Commissioning the JLab LERF Cryomodule Test Facility 973
 
  • C. Hovater, R. Bachimanchi, E. Daly, M.A. Drury, L.E. Farrish, J. Gubeli, N.A. Huque, K. Jordan, M.E. Joyce, L.K. King, M. Marchlik, W. Moore, T.E. Plawski, A.D. Solopova, C.M. Wilson
    JLab, Newport News, Virginia, USA
  • A.L. Benwell, C. Bianchini, D. Gonnella, S.L. Hoobler, K.J. Mattison, J. Nelson, A. Ratti, B.H. Ripman, S. Saraf, L.M. Zacarias
    SLAC, Menlo Park, California, USA
  • L.R. Doolittle, S. Paiagua, C. Serrano
    LBNL, Berkeley, California, USA
 
  The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2019-THP049  
About • paper received ※ 22 June 2019       paper accepted ※ 02 July 2019       issue date ※ 14 August 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)