Paper |
Title |
Page |
MOYA01 |
The Superconducting Accelerator for the ESS Project |
24 |
|
- F. Schlander, C. Darve, N. Elias, M. Lindroos, C.G. Maiano
ESS, Lund, Sweden
- P. Bosland
CEA/IRFU, Gif-sur-Yvette, France
- M. Ellis
STFC/DL/ASTeC, Daresbury, Warrington, Cheshire, United Kingdom
- P. Michelato
INFN/LASA, Segrate (MI), Italy
- G. Olry
IPN, Orsay, France
- R.J.M.Y. Ruber
Uppsala University, Uppsala, Sweden
|
|
|
The European Spallation Source, ESS, is under construction in Lund since 2014. While the installation of the source and the normal conducting part will start in this autumn, the production and testing of cryomodules and cavities for the superconducting accelerator is in full swing at the partner laboratories. The spoke cavities and cryomodules will be provided by IPN Orsay and the testing of those modules will take place at Uppsala University. Prototyping and assembly of the elliptical cryomodules series is occurring at CEA Saclay, and the modules will be tested at a new test stand at ESS. The fabrication and test of the medium beta cavities is provided by INFN Milan and STFC Daresbury for the high beta cavities respectively. An overview of the current activities and test results will be presented in this talk.
|
|
|
Slides MOYA01 [26.361 MB]
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2017-MOYA01
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
MOPB019 |
Interface Challenges for the SRF Cryomodules for the European Spallation Source |
100 |
|
- F. Schlander, C. Darve, N. Elias, C.G. Maiano
ESS, Lund, Sweden
- P. Bosland
CEA/DSM/IRFU, France
- G. Olry
IPN, Orsay, France
|
|
|
The European Spallation Source is currently under construction in Lund in southern Sweden. The main part of the accelerator will consist of two different types of cryomodules housing three different types of cavities ' double spoke cavities and two different elliptical cavities. The spoke cavities as well as the cryomodules will be provided by IPN Orsay, thus the external interfaces to the other accelerator systems have to be verified. While the procurement and assembly of the elliptical cryomodules will be performed by CEA Saclay, the cavities will be provided by INFN Milano and STFC Daresbury. Thus in addition to the external cryomodule interfaces, also the internal interfaces between cavities and cryomodules have to be taken care of. This contribution presents the challenges related to this work.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-SRF2017-MOPB019
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|