Author: Krupka, N.
Paper Title Page
MOPB003 A New High Resolution Optical System for Inspection of Gun-and Multi-cell Resonators in ISO-4 Cleanrooms 47
 
  • M. Schalwat, R. Bandelmann, A. Daniel, N. Krupka, A. Matheisen, S.T. Sievers
    DESY, Hamburg, Germany
 
  Optical inspection of the inner surface of superconducting resonators was established during European XFEL cavity production by usage of the so called OBACHT optical inspection. In addition to the surface inspection by OBACHT a new optical inspection system with integrated high resolution camera is set up at DESY. It allows inspection of multi-cell resonators as well as gun cavity resonators with only single side accessibility to the inner surface. A prototype was commissioned and optical inspections were done with OBACHT and the new system in parallel. Two SRF gun cavities were inspected by this optical system and origin of limitations of the resonators were identified.  
poster icon Poster MOPB003 [0.220 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPB088 Experience on In-situ Module Repair and Set Up of Non XFEL Cavity Strings at DESY 269
 
  • M. Schmökel, A. Daniel, N. Krupka, A. Matheisen, S. Saegebarth, M. Schalwat, P. Schilling
    DESY, Hamburg, Germany
 
  All components installed to the European XFEL cavity string modules underwent an intensive inspection and quality control before acceptance for installation to cavities or modules. Even though some RF feed throughs for HOM coupler- and Pick Up antennas showed leaks at the ceramic insulation after module test at 2 K. Due to time restriction and continuity of production the exchange of these parts needed to be done without reentering the cleanroom. Successful repair of these modules took place by setting up a local cleanroom onto the cavity string. In collaboration with Helmholtz-Zentrum Dresden-Rossendorf (HZDR), a cavity string for the ELBE project was assembled at DESY and transported to HZDR for installation to the vacuum vessel. A spare module with 3.9 GHz Resonators for the European XFEL was set up at DESY and will be tested and qualified for the European XFEL. Due to delay in delivery of the power couplers, four power couplers were installed after string assembly.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-SRF2017-MOPB088  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)